Council archive · source document
2024072 - NSC OPW Decision Notice with Conditions (Dated 20-06-2023) · MCU22/0199.01
Plan No. Rev. Plan/Document Name Date
33002-DR1.1 . Driveway Re-Aligning Plan April 2023
Prepared by SCG Consulting
33002-DR1.2 . Driveway Revision Details April 2023
Prepared by SCG Consulting
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 16 June 2025, unless an application to extend the currency period is
approved by Council.
SITE SPECIFIC CONDITIONS
Bonds
3. A site control and/or compliance bond of $2,500 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
4. Bonds must:
a. meet the requirements of council’s relevant Planning Scheme Policy for performance
and uncompleted works;
b. be lodged with Council and accompanied by the Bond Administration Fee/s; and
c. be requested for release by writing to Council, when relevant approval requirements
have been met.
GENERAL CONDITIONS
Engineering
5. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
6. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
7. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works.
8. A Construction Management Plan must be submitted to Council prior to the pre-start meeting
and must specifically address the following:
a. traffic Management during the construction phase;
b. appropriate traffic signage in accordance with the Manual of Uniform Traffic Control
Devices (MUTCD); and
c. provision for safe vehicle and pedestrian access across the frontage of the site both.
Page 2 of 7
Document Set ID: 22466445
Version: 4, Version Date: 20/06/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
2024072 - NSC OPW Decision Notice with Conditions (Dated 20-06-2023).pdfRelated documentApplication case desk ↗
Decision Notice - OPW23 0089 [As Published].pdfRelated documentApplication case desk ↗
About this file
- File size
- 148 KB (small file)
- File type
No other editions are linked here.