SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2005.00000699.002 [As Published] · 132005.699.01
2005/699
The approved maintenance plan shall be incorporated in the Community Management
Scheme for the development and a copy of this shall be provided for Council’s records prior to
commencement of the approved Use.
All other clean stormwater, such as roof water, can be collected on site and discharged
directly into the infiltration pits, bypassing the grease/oil arrestor.
A Development Permit for Building Works shall not be granted until a Development Permit for
Operational Works has been issued in regard to the drainage scheme.
53. All site stormwater drainage shall be by means of a gravity system.
54. Plans of the entire on site drainage design shall be prepared by a Registered Professional
Civil Engineer and submitted to Council prior to obtaining a Development Permit for
Operational Works.
Sewer Mains
55. The site shall be connected to Council’s existing sewerage reticulation systems and be
constructed in accordance with Council’s standards and requirements at no cost to Council.
Town Water Supply
56. The site shall be connected to Council’s existing town water supply and be constructed in
accordance with Council’s standards and requirements at no cost to Council.
57. Each water connection to the water reticulation system shall extend to the property boundary
and be metered. Where multiple units are served by a single service, multiple water meters to
each individual unit and for the body corporate shall be installed. All fees for the supply of
water meters shall be paid to the Council.
Service Easements
58. All existing and proposed easements within the site shall be shown on the plans submitted for
Operational Works / Building Works approval.
59. Registered easements shall be created over any Council service within the subject site in
accordance with Council’s requirements (if not already created) and at no cost to Council.
The Applicant’s Solicitor shall give Council’s Solicitor an appropriate undertaking in writing that
the Title Deed and the easement documents will be lodged at the Land Titles Office and any
additional Titles Office forms or requisitions requiring the consent of Council will be attended to
promptly.
A duly executed copy of the easement shall be submitted to Council for perusal prior to the
use commencing.
Any changes required by Council’s Solicitor must be corrected immediately.
Earthworks
60. Plans and details outlining the extent of earthworks required on site and any trees to be
retained shall be submitted to Council for approval prior to obtaining a Development Permit for
Operational Works.
61. All major excavations (including the basement and driveways) shall be shored to prevent
batters extending into areas and vegetation that are to be retained. All trees to be retained
should be adequately tagged to Council’s satisfaction and enclosed with a barrier fence to the
drip line to prevent damage.
62. It is recommended that the applicant employ the services of a Geotechnical Engineer to
supervise and certify the earthworks required on site and measures to ensure stability of
adjoining land and structures.
Page 8 of 16
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Decision Notice - Change to an Existing Approval - 010.2005.00000699.002 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 84 KB (small file)
- File type
No other editions are linked here.