a. All car parking areas and access driveways must be maintained exclusively
for vehicle parking and manoeuvring and kept in a tidy and safe condition at
all times;
b. Directional signage must be provided to direct customers to the car parking
spaces provided on site.
Service Vehicles
8. Service vehicle parking, manoeuvring, and standing spaces must be provided on
the site and must include in particular a loading bay for a single unit truck 12 metres
x 3.6 metres.
Landscaping
9. The development site must be landscaped in accordance with the approved site
plan and be provided to a minimum of 15% of the site. The works must be
undertaken in accordance with an Operational Works approval and PSP2
Landscaping in Noosa Plan, for that specific area and must include in particular:
a. A 2 metre wide landscaping strip along the Rene St road frontage of the
subject site, exclusive of the access driveway.
Stormwater Drainage
10. The site must be provided with a stormwater drainage system connecting to a
lawful point of discharge. The works must be undertaken in accordance with an
Operational Works approval and generally in accordance with report titled
“Preliminary Stormwater Management Plan”, rev 0, dated 7 October 2021 and
prepared by RECOR Pty Ltd.
Easements
11. Unless otherwise agreed in writing by the relevant service provider, any public or
third party infrastructure located on the subject site must be placed within an
easement registered against the title of the property.
12. All easements must be designed in accordance with the planning scheme and
granted at no cost to the Grantee. Where the Grantee is Council or a service
authority, the easement documentation must be in accordance with the Grantee’s
standard easement terms. Draft easement documentation must be submitted to
Council for endorsement.
13. All works must be kept clear of any existing or proposed easements on the subject
land, unless agreed otherwise in writing by the Grantee.
Earthworks and Retaining Walls
14. All fill and associated batters must be contained entirely within the subject site
unless written permission from the respective landowner(s) is provided to Council.
All earthworks must be undertaken in accordance with the provisions of Australian
Standard AS3798: Guidelines on Earthworks for Commercial and Residential
Developments.
15. Where the development involves excavation or filling over, or adjacent to,
drainage, water supply or sewerage infrastructure, all access chamber surface
levels must be adjusted to provide a freeboard of 100mm above the finished
ground surface level.
16. All retaining walls must be designed and constructed in accordance with the
planning scheme and must be certified by an RPEQ where exceeding 1.0m in
height. All retaining walls that are publicly accessible and exceed 1.0m in height
must be fitted with a commercial grade safety fence.
Page 15 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.