Original source · versioned page text
2021-12-13 General Committee Meeting Minutes
Text sections have not been matched to the original PDF pages. Use the original document to check page numbers.
GENERAL COMMITTEE MEETING MINUTES 13 DECEMBER 2021
5. The proposal does not comply with Performance Outcome PO12 of the Visitor
Accommodation Code and Performance Outcome PO6 of the Driveway and
Parking Code as insufficient car parking is proposed on site to address the likely
parking demands on site.
6. There is no need for additional short term accommodation in the area.
B. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
Carried unanimously.
4 RAL21/0007 - DEVELOPMENT APPLICATION FOR RECONFIGURING A LOT (1 LOT INTO
12 LOTS) ASSESSED UNDER THE SUPERSEDED PLANNING SCHEME AT 111 LAKE
WEYBA DRIVE, NOOSAVILLE
In accordance with Chapter 5B of the Local Government Act 2009, Cr Stewart provided the following
declaration to the meeting of a prescribed conflict of interest in this matter:
I, Cr Stewart, inform the meeting that I have a prescribed conflict of interest in relation to this matter as
Kirsty Millar, the ex-wife, of Mr Bob Linke, Director of Linke and Linke Surveys Pty Ltd (the Applicant),
donated $5000 on 12/2/20, $5000 on 6/3/2020; $1900 on 27/2/2020 and $1900 on 27/2/2020, to my
2020 election campaign. As a result of my conflict of interest, I will now leave the meeting room while
the matter is considered and voted on.
Cr Stewart left the meeting.
Committee Recommendation
Moved: Cr Stockwell
Seconded: Cr Jurisevic
That Council note the report by the Coordinator Planning to the Planning & Environment
Committee Meeting dated 7 December 2021 regarding application RAL21/0007 for a
Development Permit for Reconfiguring a Lot – 1 lot in 12 lots, situated at 111 Lake Weyba
Drive Noosaville and:
A. Refuse the application for the following reasons:
1. The proposed development does not comply with Assessment Benchmark 3 of the
State Planning Policy (Natural Hazards, Risk and Resilience) as it does not
satisfactorily mitigate the bushfire risks to people and property to an acceptable or
tolerable level.
2. The proposed development does not demonstrate compliance with Overall
Outcomes 13.30.2 a), b) and c) and Specific Outcomes O4, O10, O13, O17, O19,
O20 and O24 of the Natural Hazard Overlay Code as it compromises the safety of
people and property from the site’s residual flood and bushfire risks.
3. The proposed lots are located on land that is categorised as having a high potential
for Bushfire Intensity and the proposed bushfire measures are not satisfactory and
inappropriately burden QPWS and the future owner of lot 12 to maintain a
significant portion of the proposed fire buffers.
4. The proposed development will compromise the safety of people, as:
a. there is no effective evacuation route that remains passible, with sufficient
flood warning time, to enable people to progressively evacuate to a safe area
b. the proposed area for residents to shelter in place is not satisfactory given
the lots will be isolated for a significant period.
c. there is no warning system proposed for residents to decide whether to
evacuate before the road becomes impassable or shelter in place.
5. The proposed extent of fill and retaining walls will result in a poor visual outcome.
Page 9 of 19
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.