Skip to the record
The only place to find full transcripts.

Council archive · source document

Attachment A - Existing Approval · 132008.1128.02

Attached to the e-mail Change to DA (Report, Existing Approval, Bushfire Technical Note, DA Form, Owners consent) - 132008.1128.02.

of 50

Text shows just the words. Original shows the document exactly as it was published.

Noosa Council documents




                                                                                                   132008.1128.01

                         (b)       applicants should be aware that a “Disability Standard on Access to premises”
                                   is currently being developed and most likely will impose changes on the
                                   Building Code of Australia; and
                         (c)       any services and facilities in the building complex should allow independent,
                                   dignified and equitable use of the services and facilities for all people.
               Aboriginal Cultural Heritage Act 2003
               12.    There may be a requirement to establish a Cultural Heritage Management Plan and/or
                      obtain approvals pursuant to the Aboriginal Cultural Heritage Act 2003.
                         The ACH Act establishes a cultural heritage duty of care which provides that: “A
                         person who carries out an activity must take all reasonable and practicable measures
                         to ensure the activity does not harm Aboriginal cultural heritage.” It is an offence to
                         fail to comply with the duty of care. Substantial monetary penalties may apply to
                         individuals or corporations breaching this duty of care. Injunctions may also be issued
                         by the Land and Resources Tribunal, and the Minister administering the Act can also
                         issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
                         heritage or the cultural heritage value of Aboriginal cultural heritage.
                         You should contact the Cultural Heritage Co-ordination Unit on 07 3239 3647 to
                         discuss any obligations under the ACH Act.
                   Infrastructure Charges – 8 November 2017
               13.    This Change to an Existing Approval dated 19 December 2011 will trigger Infrastructure
                      Charge Notice/s to be issued in accordance with Council’s “Charges Resolution” made
                      pursuant to the planning legislation and regulations current at the time of issue.
                      Separate notices will be issued by Council and Unitywater for their respective “trunk”
                      infrastructure networks and will replace the original Adopted Infrastructure Charge
                      Notices (No’s. 110 and 111) issued on the original approval.
               8      PROPERTY NOTES

               The following property notes will be placed against the subject property in Council’s property
               record system:
                      MCU08/1128 – Stormwater Quality Treatment Devices
                      This site is provided with stormwater quality treatment devices which capture and store
                      pollutants from stormwater runoff generated on the site. These devices are required to
                      be routinely checked and serviced/cleaned out as per the endorsed maintenance
                      manual. Records of maintenance activities undertaken are to be kept and made
                      available to Council Officers upon request
               9      PRELIMINARY APPROVAL OVERRIDING PLANNING SCHEME

               Not Applicable
               10     FURTHER DEVELOPMENT PERMITS REQUIRED

               •         Development Permit for Reconfiguration of a Lot (Sewage pump station lot creation
                         and access easements)
               •         Development Permit for Operational Work for:
                               o   Access and/or Carparking.
                               o   Site Civil Works.
                               o   Roadworks.
                               o   Stormwater Drainage.
                               o   Frontage Works.

                                                                                                   Page 18 of 21


Document Set ID: 20451866
Version: 1, Version Date: 14/11/2017                                                             Print Date: 16 November 2017, 8:52 AM

Used in these records

About this file

File size
3.8 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Attachment A - Existing Approval.pdf · 3.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.