Council archive · source document
07/1087 - MCU - Entertainment & Dining Business Type 1 Food & Beverage [As Published] · 132007.1087
INTEGRATED PLANNING ACT 1997
“nitegration of land use and public
[transport wave, Siege.
‘For more Information refer to Guide 23, sctiedite
i
(Bot he IP. & schedule 2 off of the [P Regulation,
‘Unies you answered ‘none of the above’, the"
{application triggers teferral.to QT. as a 33s"
IDAS Assessment Checklist, Version 20, 2 April 2007
«| 22. The application involves: (tick the applicable box/es)—
(7 (i) a material change of use assessable against the planning scheme for a purpose
mentioned in schedule 13C of the IP Regulation and exceeding the thresholds set by that
schedule.
C1 (ii) reconfiguring a lot—
(1 (a) on land that is completely or partly within a public transport corridor, and the
total number of lots increases;
[J (b) on land that is completely or partly within a future public transport corridor or
an airport's public safety area;
CJ (c) on land that is within 400m of a public passenger transport facility or a future
public passenger transport facility, and the total site area is 5000m? or greater;
[J (d) for a residential purpose within the 25 ANEF contour for an airport;
(J (e) for a residential purpose resulting in 100 or more allotments.
LD (ii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
above, on land that—
[Unless you answered “none of the atiove’, the.
‘ “application triggers referral to.the holder of *+""
4 ‘peine licence No 4 issued under the foe
Ci (@) is completely or partly within a public transport corridor or a future public
Bb: 5 transport corridor;
i. a: : . . CJ (b) will result in work that encroaches into an airport's operational airspace.
i . ¢ EX] (iv) none of the above.
iRallway safety andefficiency - ; ./23. The application involves: (tick the applicable box/es)—
abe PAS cthohe ReP Raeton [1 (i) a material change of use assessable against the planning scheme for a purpose
‘Unless you answered “nore of heaton’ te the mentioned in schedule 13D of the IP Regulation and exceeding the thresholds set by that
‘lappfication triggers referral to QT asa: ~ schedule,
jjeoncurrence agency. : LO (ii) reconfiguring a lot—
i *. (1 (a) _ ontand that is completely or partly within a future public transport corridor,
’ 3 BOR ae? future railway land or a railway tunnel easement;
Po oo. a (J (b) on tand that is within 400m of a Citytrain passenger railway station or a future
ig. Citytrain passenger railway station, and the total site area is 5000m? or
f greater;
8 CJ (c) on land that abuts rail corridor land, commercial corridor land or future railway
q i i. land, and the total number of lots increases;
q. * {1 (d) on land that abuts rail corridor land, commercial corridor land or future railway
‘e land and an easement abutting the corridor or future railway land is created;
De. CJ (e) on land that is completely or partly within 100m of, and abutting an approach
| i” to, a railway level crossing, and the total number of lots increases;
a LI (f) for a residential purpose resulting in 100 or more allotments.
a CO (iii) operational work assessable against the planning scheme, but not associated with a
material change of use mentioned in (i) above or reconfiguring a lot mentioned in (ii)
yo above, involving extracting, excavating or filling greater than 50m, on land that—
t ( (a) is completely or partly within rail corridor land or commercial corridor land, and
po the work is not for rail transport infrastructure or other rail infrastructure;
Boge LJ (b) is completely or partly within future railway land, or a railway tunnel easement;
K C1 (c) abuts rail corridor land, commercial corridor land or future railway land, and
* the work is within 25m of the railway boundary.
EX] (iv) none of the above.
; _|24. The application involves the easement for the construction or operation of the Moonie to
Brisbane strategic pipeline, and involves: (tick the applicable box/es)—
(CI (i) a material change of use assessable against the planning scheme and not associated
with reconfiguring a lot, and any structure or work will be located wholly or partly in the
easement.
C1 (ii) reconfiguring a fot
(1 (iii) operational work assessable against the planning scheme, that is filling, excavation,
compaction, drilling, boring or piling not associated with a reconfiguring a lot, and the
work is located wholly or partly in the easement.
E&I (iv) none of the above.
Page 8
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
07/1087 - MCU - Entertainment & Dining Business Type 1 Food & Beverage [As Published]Related documentApplication case desk ↗
About this file
- File size
- 3.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.