ORDINARY MEETING MINUTES 17 SEPTEMBER 2020
10. Where damage occurs to any Council asset as a result of the landscaping works,
the damage must be repaired immediately where it creates a hazard that presents
risk to person or property. Non-hazardous damage must be repaired prior to
completion of works.
Car Parking
11. The applicant must comply with the requirements of any Infrastructure Agreement
entered into with the Council with respect to the payment of car parking
contributions in relation to the proposed development. In the event that the
Infrastructure Agreement does not apply a minimum of one car parking space must
be provided and marked on the site and made available and accessible at all times
while the use is open for business.
12. A retaining wall must be maintained for the full length of the property to main beach
with removable flood gates installed or available for installation prior to any
significant coastal storm event to each entry point. These structures must be
designed to mitigate the impact of wave overtopping of the Council controlled
beach seawall during a significant event. Certification must be submitted to
Council from a RPEQ which certifies that these structures meet the requirements
of this condition.
C. Include the following new Advisory Note:
Qualified Person
1. A Qualified Person, for the purpose of:
a. Undertaking, supervising tree works and preparing arboriculture certification,
is considered to be a person with a minimum three years current experience
in tree protection, hazard identification/mitigation assessment and either:
i. International Society of Arboriculture (ISA) certification; or
ii. A Diploma of Arboriculture.
D. Agree to enter into an Infrastructure Agreement with the applicant that provides for
contributions in lieu of one onsite car parking space.
E. Find the following matters relevant to the assessment and sufficient reason to approve
the application:
1. The proposal complies with the Overall Outcomes of the Noosa Heads Locality
Code as the development will provide for entertainment and dining premises,
providing interest for visitors and residents accommodated in the immediate area,
whilst outdoor dining facilitates a vibrant pedestrian friendly streetscape;
2. The development is consistent with the bulk and scale of buildings within proximity
to the subject site, presenting an improved, high quality built form and landscaping
along The Parade, and providing a direct link to Main Beach.
F. Note the report is provided in accordance with Section 63(5) of the Planning Act 2016.
G. Note the application was lodged under the Noosa Plan 2006, which was superseded by
the Noosa Plan 2020, which commenced on 31 July 2020. All references to the ‘Noosa
Plan’ or ‘the planning scheme’ within the assessment report is in reference to the now
superseded Noosa Plan 2006.
For: Crs. Jurisevic, Lorentson, Wilkie and Stewart
Against: Crs. Stockwell and Wegener
Carried.
Page 15 of 20