12. Trees in the road reserve must be protected from construction activities by:
a. clearly marking vegetation with flagging tape
b. installing protective fencing around the drip line of the vegetation
c. restricting stockpiling, storage and vehicle parking to those areas which are already
cleared
d. using low impact construction techniques around vegetation.
Site Access and Driveways
13. A sealed access driveway must be provided from Arakoon Crescent to all parking areas of
the development. The works must be undertaken in accordance with an Operational Works
approval and be generally in accordance with drawing number 28045-DR1 prepared by SCG
Consulting Engineers dated April 2018 and Council’s standard drawing RS-049 and RS-050.
Stormwater Drainage
14. The site must be provided with a stormwater drainage system connecting to a lawful point of
discharge. The works must be undertaken generally in accordance with drawing number
28045-SW1 prepared by SCG Consulting Engineers dated April 2018.
Geotechnical Stability
15. All works must be carried out in generally in accordance with the recommendations contained
in the following:
a. The Soil Test and Footing Report, report number 28045(S) prepared by SCG
Consulting Engineers dated 19 March 2018, and
b. The Slope Stability Assessment, report number 28045(SL) prepared by SCG
Consulting Engineers dated 19 March 2018.
16. Certification must be submitted to Council from a qualified person* which certifies that the
development has been constructed in accordance with the recommendations contained in
The Soil Test and Footing Report, report number 28045(S) prepared by SCG Consulting
Engineers dated 19 March 2018, and The Slope Stability Assessment, report number
28045(SL) prepared by SCG Consulting Engineers dated 19 March 2018 and that the
development has a minimum factor of safety against landslip of 1.5 in the long term. *(Refer
to advisory Note)
Earthworks and Retaining Walls
17. All fill, batters, retaining walls and associated foundations must be contained entirely within
the subject site unless written permission from the respective landowner(s) is provided to
Council.
18. All earthworks must be undertaken in accordance with the provisions of Australian Standard
AS3798: Guidelines on Earthworks for Commercial and Residential Developments.
19. All retaining walls must be designed and constructed in accordance with the planning scheme
and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
safety fence.
Erosion and Sediment Control
20. Prior to the completion of the development, all site surfaces must be effectively stabilised
using methods which have achieved effective short-term stabilisation and which will continue
to achieve effective stabilisation in the medium to long-term. For the purpose of this condition,
an effectively stabilised surface is defined as one that does not, or is not likely to result
in visible evidence of soil loss caused by sheet, rill or gully erosion or lead to sedimentation,
or lead to water contamination.
Page 3 of 6
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED - MCU18 0048 - Decision Notice.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.0 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.