PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 15 SEPTEMBER 2015
Page 141 of 189
500075 - Whole of Shire - Tech One HR module 0 105,996 0 000%
500520 - Replacement of off-suppor and off-lease computers at Noosa 34,600 34.600 0 0.00%
500541 - Whole of Shire Mobile Mapping Stage 2 - Hardware & Configura 80,000 80.000 2.208 287%
500542 - Implementation of Cl Anywhere Functionality for TechnologyOn 80,000 80.000 0 000%
Total Information Technology 194,600 300.590 2293 0.76%
500212 - Tewantin Splash Park Playground Renewal 0 190,000 0 0.00%
500521 . Peregian Beach Skate park Shade Sail renewal 80,000 60.000 S78 072%
500522 - Sunshine Beach Skate park renewal - Design 36,000 36,000 58 0.16%
500523 - Whole of Shire Park shetter - Renewal Park shetiers 2015/16 45,000 45,000 29,058 64 58%
500624 « Whole of Shire Ptayground refurbishments 2015/2016 100,000 100,000 1.272 127%
500525 - Whole of Shire Park Fumiture Renewal 2015/2076 50,000 50.000 M7? 0.69%
600551 « Noosa Hinterland Priority Playground « Planning & Design $0,000 60.000 0 0.00%
Total Parks & Playgrounds 361,000 491,000 31,344 638%
100737 - Gibson Road (Eurnindi Noosa Rd to Thomas St} - On road cycle oO 18,000 13,767 91.78%
600043 - Noosa Heads - Park Road boardwalk design 0 186.805 4,007 2.85%
500008 - Eenie Creek Pathway Stage 1 Signage 0 19,003 2 B48 14.98%
500103 - Goorey Noosa Road Corndor Improvement oO BB 554 28,201 31 85%
500526 - Noosa Heads Park Road, Boartwak Design and consultation 200,000 200,000 95st 478%
500527 - Noosa Heads Sheraton Boardwak rehabilitation 63,000 63,000 5 0.00%
Total Pathways & Enabling Facilities 263,000 542.422 58,379 10,76%
500080 - Standards Review - Standard Orawings 0 13,791 10,051 72.58%
500081 - Whole of Shire Traffic Study 0 47.201 o 0.00%
500106 - Noosa River Flood Mitigation Strategy 9 30.164 985 246%
500107 - Noosa River Hydraulic Modet 0 290,052 937 0.32%
500203 - Business Distrinution and Land Needs Project 0 0 0 0.00%
500543 - Whole of Shire Planning Scheme Development Projects 2016 400,000 400,000 0 0.00%
Total Planning Scheme 400,000 784.228 11,953 152%
500001 . Electric Bus Feasibility Study 0 4.368 16,264 416.32%
500050 - Noosa Junction Transit Centre « improve 0 40,000 o 0.00%
500083 - Noosa Bus Station Safer Streets Program Oo 50.261 13,103 26.06%
$00208 . Electric Bus Charging Station and installation 0 77a 51,185 65.70%
500528 - Whole of Shire Bus Shelter Disabled Compliant Program: 2016 1,500,000 1,500,000 27,745 185%
Total Public Transport infrastructure 1,500,000 1,672,567 110,298 6.59%
100742 - Sealed Road Pavement surveys and Investigations 0 39,064 oa9 253%
500054 - Whole of Shire - pavement surveys 9 19,087 42,756 85.00%
500055 - Whale of Shira - resaal and rehab 5 1378679 66,079 4%
500118 - Dr Pages - Kinmond Creek Rd Intial Planning & Dasign o 75.055 38,486 51.78%
500206 - Tewantin Cooroy Noosa Ro Stages 2-6 Design Only o 120,985 5.469 452%
500528 - Whale of Shire Other Emargent Works Program 2015-2018 3,933,595 3.993.895 0 0.00%
500530 - Whole of Shire Reseal & Rehabilitation Program 2015/2016 4,750,000 4.750.000 1,685 om
500531 - Whole of Shire Pavement surveys ard Wvestigabons 2015/2016 60,000 60.000 0. 000%
500544 - Cootharabe - Dr Pages Road & Kinmond Creek Rd - Construction 4,700,000 4.700.000 60 BES 130%
Total Sealed Roads Network 13,443,895 15,077 366 188,372 1.25%
500106 - Girraween Sports Cornplex Lighting 0 10,000 0 0.00%
500545 - Tewantin Nooss District Sports Cornplex - Internal roadway pl 30,000 30,000 0 0.00%
Total Sports Ground and Facilities 30,000 40,000 0 0.00%
100745 » Gyrnpie Terrace Pipe Rehabiltation - investigation & Design 0 10.763 3,370 31.31%
500057 . Gyrngie Terrace ppe rehabiitation 0 194.386 662 04%
500058 - Re-lining of Ben Lexcen stormwater 0 20.257 #25 2.82%
500060 - Whole of Shire - stormwater stuctures 0 47 581 2444 $.14%
500084 - Whale of Shire - Flood mitigation stage 0 20087 747 404218 18.27%
600532 - Whole of Shire CCTV Drainage program 2015/2016 $0,000 50,000 9 0.00%
500533 - Whole of Shire Pipe re-bning! rehabiltabon program 2016 280,000 250,000 0 0.00%
$00534 - Whole of Shire Storrmwater Pt Structure renewal program 2016 200,000 200,000 0 0.00%
500835 - Whole of Shire Kerb & Channel Renewal Program 2015/2016 50,000 $0,000 Do 0.00%
Total Stormwater Drainage 550,000 2,928,733 411,520 14.0%
Page 141 of 189See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.