PLANNING & ORGANISATION COMMITTEE MEETING AGENDA 15 SEPTEMBER 2015
Retention of Existing Trees
8. Existing native trees identified on the approved plans located between the building and
the eastern and southern property boundaries must be retained and maintained in good
health for the life of the tree.
9. Trees to be retained must be protected from construction activities by:
a. clearly marking vegetation to be retained with flagging tape;
b. installing protective fencing around the drip line of the vegetation;
c. restricting stockpiling, storage and vehicle parking to those areas which are
already cleared; and
d. using low impact construction techniques around vegetation.
Prior to Commencement of Works
10. A preliminary Construction Management Plan must be submitted to Council prior to the
pre-start meeting and must address the following:
a. appropriate traffic signage in accordance with the Manual of Uniform Traffic
Control Devices (MUTCD).
b. provision for safe pedestrian access across the frontage of the site both during
daily construction and after daily construction has ceased.
c. it is acknowledged that the preliminary Construction Management Plan will be a
draft document requiring finalisation upon appointment of the Principal
Contractor employed to construct the works and a final document will be required
to be submitted at the Pre-Start Meeting for the project.
11. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6244.
The pre-start meeting must include the relevant parties for the demolition, construction
and landscaping aspects of the works:
B. Execute the infrastructure agreement with the applicant for the payment of contributions in
lieu of off-street parking for 3 car park spaces totalling $68,187 (subject to indexation); and
C. Give notice to the property owner that the unapproved works must be removed to the
reasonable satisfaction of Council within 6 months.
REPORT
1. BACKGROUND
On the 13 October 2008, Council issued a development approval (08/0890) for a Retail Business
Type 2 – Shop & Salon with a total gross floor area of 85m2. The applicant subsequently undertook
building works without Building or Planning approvals and increased the total use area to 185m 2
(see Attachments 1-3).
Following town planning and building compliance action, the applicant subsequently applied to
Council for approval to make the existing floor space compliant with the Building Code of Australia
(BCA), as well as pay a contribution in-lieu of providing on-site carparking for 6 spaces totalling
$135,732 for the increased shop use areas.
A report on this original proposal was discussed at the 26 May 2015 Planning & Organisation
Committee meeting and was recommend for refusal for the following reasons:
Page 51 of 189
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
Large file: the download may take up to a minute.
Searchable page text hides email addresses. Original files are unchanged and may show email addresses.