Council archive · source document
Concurrence Agency - EPA - Decision Notice [As Published] · 132009.103
Officer: Glen Conforti
Direct Telephone: (07) 5449 5379
Response Address: PO Box 141, Tewantin QLD 4565
Email: [email protected]
Our Reference: 2009/103
Your Reference: 334306
25 March 2009
Environmental Protection Agency
Ecoaccess Customer Service Centre
PO Box 15155
CITY EAST QLD 4002
Dear Sir
Decision Notice
Integrated Planning Act 1997
Your Department was a referral agency for the above application and provided a response to Council
in a letter dated 11 March 2009. On 24 March 2009, Council decided to approve the application in
full subject to conditions.
Details of the decision are as follows:
1 APPLICATION DETAILS
Application No: 2009/103
Street address: 61 Orient Drive, Sunrise Beach
Real property description: Lot 96 N 21838
Planning Scheme: The Noosa Plan
2 DECISION DETAILS
The following type of approval has been issued:
Development Permit for Material Change of Use - Detached House
3 RELEVANT PERIOD OF APPROVAL
The relevant period for this Development Approval is identified in the Assessment Manager
conditions.
4 ASSESSMENT MANAGER CONDITIONS
1. Development undertaken in accordance with this approval must generally comply with the
approved plans of development: -
Plan / Rev. Plan / Document Name Date
Document No.
SD.101 P8 Site Plan – Kidd + Co Designers 16 February 2009
SD.201 P8 Subfloor Plan – Kidd + Co Designers 16 February 2009
Page 1 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 9 pages
Page 2
2009/103
SD.202 P8 Lower Floor Plan – Kidd + Co 16 February 2009
Designers
SD.203 P8 Upper (Ground) Floor Plan – Kidd + Co 16 February 2009
Designers
SD.204 P8 Roof Plan – Kidd + Co Designers 16 February 2009
SD.501 P8 Elevations – Kidd + Co Designers 16 February 2009
SD.502 P8 Elevations – Kidd + Co Designers 16 February 2009
SD.601 P8 Sections – Kidd + Co Designers 16 February 2009
SD.602 P8 Sections – Kidd + Co Designers 16 February 2009
2. The development must be undertaken and operated in a manner that causes no detrimental
effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
lighting nuisance or other emissions.
3. Earthworks required on site shall be carried out in accordance with Council’s Planning
Scheme Policy PSP5 – Engineering Design Standards, so as not to cause the additional
ponding of water on any adjoining lands or concentrate or direct overland flow on to an
adjoining property.
4. All hot water systems installed shall be either solar systems; electric heat pump systems; or
gas systems (LPG or natural).
5. The building height shall not exceed 8.0 metres above natural ground level and finished
ground level.
6. A verification survey of the building is to be carried out by a Licensed Surveyor and a
certificate lodged with Council at completion of work confirming compliance with the
maximum allowable building height as required by either the conditions of approval or the
Planning Scheme.
7. Dense landscaping comprising a mix of native coastal species of shrubs and trees shall be
provided in close proximity to the masonry-bracing wall and planted in accordance with
Council’s Landscaping Guidelines.
8. Dense landscaping, comprising a mix of native coastal species of ground cover, shrubs and
trees shall be provided to the full length of the rear boundary for a width of 2m and planted in
accordance with Council’s Landscaping Guidelines.
9. A minimum of 20% of the site shall be retained as soft landscaping.
10. The Cabbage Palm to the north east corner of the lot shall be protected from interference
resulting construction activities by:
10.1 Clearly marking the palm to be retained with flagging tape;
10.2 Installing protective fencing around the drip line of the palm;
10.3 Stockpiling and storage occurs in already cleared areas and does not cause
interference with the palm; and
10.4 Low impact construction techniques are used around the palm.
11. The Norfolk Island pine tree removed from the site shall be replaced with two (2) 100lt Banksia
species planted in the footpath reserve to the front of the lot in accordance with Council’s
Landscaping Guidelines.
12. Cleared vegetation is to be suitably processed by one of the following methods and removed
from the site:-
Page 2 of 10
Page 3
2009/103
12.1 Processing through a woodchipper or shredder. The resulting mulch is to be stockpiled
loose in heaps less than 2.5 metres high.
12.2 Disposal for firewood.
12.3 Disposal for landscaping purposes.
12.4 The Applicant is advised that other methods may be considered provided full details of
the method are submitted.
12.5 The applicant is advised that burning off is an unacceptable method of disposal.
13. Buildings and structures (including swimming pools, sheds, tennis courts or outbuildings) shall
not be constructed under overhead electricity transmission lines, or within any easements.
14. External colours and finishes of the building shall comprise of muted/environmental tones that
blend with the natural environment.
15. Gates must not be installed along the rear property boundary.
16. Sediment and erosion control measures must be in place prior to building works. If such
measures are not in place or are not satisfactory, ‘on the spot’ fines may be issued. Such fines
can be issued if sediments from the site are found to enter or have the potential to enter
Council’s stormwater system or natural waterways.
17. Security in the form of a cash bond or trading bank guarantee to the sum of $2500.00 must be
submitted, to secure performance of all conditions of this approval, prior to the issue of a
Development Permit for building works. The cash bond or trading bank guarantee will be
returned on performance of the conditions of approval less any costs incurred by Council in
respect of enforcing performance of this permit.
Relevant Period
18. The Development Permit for a material change of use lapses if the use has not happened by
24 March 2013, unless an application to extend the relevant period is approved by Council.
5 REFERRAL AGENCY CONDITIONS
The referral agencies applicable to this application are:
Referral Trigger Referral Status Referral Agency Referral Address
Site in an area where Concurrence Environmental Eco access Customer
management advice Protection Agency Service Centre
has been given for PO Box 15155
unexploded ordnance CITY EAST QLD 4002
A copy of any referral agency conditions is attached.
6 APPROVED PLANS/DOCUMENTS
The approved plans and / or documents for this development approval are listed in the following
table:
Plan / Document No. Rev. Plan / Document Name Date
SD.101 P8 Site Plan – Kidd + Co Designers 16 February 2009
SD.201 P8 Subfloor Plan – Kidd + Co Designers 16 February 2009
SD.202 P8 Lower Floor Plan – Kidd + Co 16 February 2009
Designers
Page 3 of 10
Page 4
2009/103
SD.203 P8 Upper (Ground) Floor Plan – Kidd + Co 16 February 2009
Designers
SD.204 P8 Roof Plan – Kidd + Co Designers 16 February 2009
SD.501 P8 Elevations – Kidd + Co Designers 16 February 2009
SD.502 P8 Elevations – Kidd + Co Designers 16 February 2009
SD.601 P8 Sections – Kidd + Co Designers 16 February 2009
SD.602 P8 Sections – Kidd + Co Designers 16 February 2009
7 ADVISORY NOTES
The following Advisory Notes are for information purposes only and do not form conditions of
approval:
1. The requirements of the Environmental Protection Amendment Regulation (No. 2) 1999 and
Local Law No. 12, prevents a builder or building contractor carrying out building work on a
building site in a way that makes or causes audible noise to be made from the building work:-
1.1. On a Sunday or public holiday, at any time; or
1.2. On a Saturday or a business day, before 7.00am or after 6.30pm.
A maximum penalty of $1,500 applies to an offence under this legislation.
2. Prior to the commencement of the development, a plumbing assessment must be obtained
from Noosa Council’s Plumbing Services Section in accordance with the Plumbing & Drainage
Act 2002 (as applicable).
Aboriginal Cultural Heritage Act 2003
There may be a requirement to establish a Cultural Heritage Management Plan and/or obtain
approvals pursuant to the Aboriginal Cultural Heritage Act 2003 (ACH Act).
The ACH Act establishes a cultural heritage duty of care which provides that: “A person who carries
out an activity must take all reasonable and practicable measures to ensure the activity does not
harm Aboriginal cultural heritage”. It is an offence to fail to comply with the duty of care. Substantial
monetary penalties may apply to individuals or corporations breaching this duty of care. Injunctions
may also be issued by the Land and Resources Tribunal, and the Minister administering the ACH Act
can also issue stop orders for an activity that is harming or is likely to harm Aboriginal cultural
heritage or the cultural heritage value of Aboriginal cultural heritage.
You should contact the Cultural Heritage Co-ordination Unit on 07 3238 3838 to discuss any
obligations under the ACH Act.
8 PROPERTY NOTES
Not applicable
9 PRELIMINARY APPROVAL OVERRIDING SCHEME
Not applicable
Page 4 of 10
Page 5
2009/103
10 FURTHER DEVELOPMENT PERMITS REQUIRED
Type of Development Permit required Subject of the required Development Permit
Development Permit for Building Works All Building Works
11 SELF ASSESSABLE CODES
The developer must comply with the following codes for self-assessable development related to the
development approved under this Decision Notice:
Detached House Driveways Code
12 SUBMISSIONS
Not applicable
13 REASONS / GROUNDS FOR APPROVAL DESPITE CONFLICT WITH SCHEME
Not applicable
14 RIGHTS OF APPEAL
You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
Integrated Planning Act 1997 is attached.
During the appeal period, you as the applicant may make written representations to Council about
the conditions contained within the development approval. If Council agrees or part agrees with the
representations, a “negotiated decision notice” will be issued. Only one “negotiated decision notice”
may be given. Taking this step will defer your appeal period, which will continue after Council makes
its decision. (Refer to sections 3.5.17 and 3.5.18 of the Integrated Planning Act 1997).
15 OTHER DETAILS
Should you wish to obtain more information about Council’s decision electronic copies are available
on line at www.sunshinecoast.qld.gov.au, or at Council Offices.
Yours faithfully,
Denis Wallace
SENIOR PLANNING OFFICER
Page 5 of 10
Page 6
2009/103
Referral Agency Conditions –
Environmental Protection Agency
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
Page 6 of 10
Page 7
2009/103
Page 7 of 10
[OCR of page images]
2009/103
b ’ yehirorimente! ficences and permits
Notice
Concurrence Agency Response
2 Any person employed to work on any part of the site where Condition 1 has not been
satisfied is to be forewarned in writing by the applicant.
This warning is to explain that information available to the EPA indicates a potential for
residual UXO exists on the site and work should proceed with due caution. It is to state the
procedure to be followed by any person finding an object suspected of being explosive
ordnance or component thereof:
Do not disturb the object.
Take action, where appropriate, to prevent it being disturbed by another person.
Note its approximate Socaton an general appearance. 5
» ST itn Paes ifvesti x me Fi
‘applicant is to submit a réport, prepared in accordance with current guidelines, to. the EPA
for assessment. The.EPA is to subsequently advise the Sunshine Coast Regional Council Pa
and the applicant of | assessment in regard t to. Condition 1 being eoteted oA
5 qos Prior to Condition 3 being satisfied, no excavated: ee rock, sand or eo is to be removed
‘ “ from the site without written EPA approval. Lt os . 5a
. 5 +. - The applicant is to advise the owner and any occupier of the site of the above . *
responsibilities.
Additional comments or advice about the application
Applicants may visit the EPA's website http://www.epa.ald.gov. au/ or visit Defence's website
http:/Awww.defence.gov.au/uxo/ for the details of current UXO investigation and remedial search
contractors. The EPA accepts reports based on investigative and remedial work carried out ity
these contractors. ,
Investigation and remedial action to satisfy Condition 1 typically involves sampling/search
programs with detection a unless the use of such equipment i is:
hworks: ee conveisely, of any filing Proposed as parte the develop t brogram; OF, ny
spe SL ys
prevented or made impracticable by! the presence of a structure, stockpile, natural, bartier . *
or metal waste. :
ay kT
In the latter case, alternative action ‘may be appropriate to minimise the risk in the first instance.
For exaniple, where the risk of exposure to ‘any UXO that may exist is reduced by the presence of
a structure or natural barrier, issuance of the standard UXO warning, (see Condition 2) may suffice
while the structure, stockpile or barrier remains.in place. Where a structure is to be removed or
reduced as part of the development program, protective precautions, commensurate with any
greater risk to which workers might then be exposed, may need to be considered. Progressive
assessment will be necessary where such circumstances exist. Unless, at the completion of
preliminary works, there is evidence then available to the UXO contractor that any residual risk is
negligible, the use of detection equipment will typically be required to confirm the site's status.
Where investigation, along with any subsequent remedial action and assessment, is to be
. Page's of 5 » AFQ80109 |
Environmental Protection Agency
nyt Bis
Page 7 of 10
Page 8
2009/103
Page 8 of 10
[OCR of page images]
2009/103
ecoaccess ~
gb. “yeritoameniat ficences: and permits
: Notice
f oe Concurrence Agency Response
.
implemented by stages to satisfy Condition 1 and 3, a preliminary investigation report should be
submitted by the applicant to the EPA along with a management plan for the proposed work.
Staged investigation/remediation is most likely to be applicable where development of smaller, built-
on lots (which can present circumstances such as those discussed above) or broadhectare sites is
proposed. In such cases, the EPA’s assessment of the report and advice to Council in regard to
approval of the development will be dependent on agreement with the management plan.
Where Condition 1 is to be satisfied by a whole lot or broadhectare development stage being
subjected to investigation and any necessary remedial action, the EPA, based on the subsequent
investigation/remediation report's findings and recommendation/s, may reassess the lot, or that
. Portion comprising the development stage, as being remediated or:not needing remediation, and
+ advise the applicant: and Council ‘accordingly. Otherwise, ‘any balance of land.that has-not been’ *
further investigated’ pwill retain the: risk assessiifit made by Defence and the EPA's Area ~ eet ae
ae case, ‘the EPA may reassess all of the balance or the applicable parts. as:being, unaffected by uxo:"
Additional information for applicants
y« . This concurrence response pursuant to the Environmental Protection Act 1994 applies only;to
contaminated land issues and does not remove the need to obtain any further approval for-this
a development which may be required by this or other legislation, State and/or Commonwealth.”
Applicants are advised to check with all relevant statutory authorities for such requirements.
Enquiries:
Ranald Scott, Project Manager (UXO) - Environmental Protection Agency .
Ph: (07) 3224 5644 Fax: (07) 3247 3278 email:[email protected] - eI
" ~ End of Concurrence Agency Response ~
Environmental Protection Agency
Page 8 of 10
Page 9
2009/103
Appeal Rights
INTEGRATED PLANNING ACT 1997 & 1998 REGULATION
The following is an extract from the Integrated
(6) If an application involves assessment against a
Planning Act (Chapter 4). concurrence agency code, appeal rights for submitters
Division 8 - Appeals to court relating to for the application are not available against the part of
development applications the approval that represents the concurrence agency’s
response for the code.
Appeals by applicants
Appeals by advice agency submitters
4.1.27.(1) An applicant for a development application
may appeal to the court against any of the following- 4.1.29.(1) An advice agency may, within the limits of
its jurisdiction, appeal to the court about the giving of a
(a) the refusal, or the refusal in part, of a development development approval for a development application
application; if-
(b) a matter stated in a development approval, (a) the development application involves impact
including any condition applying to the assessment; and
development, and the identification of a code
under section 3.1.6;1 (b) the advice agency told the applicant and the
assessment manager to treat its response to the
(c) the decision to give a preliminary approval when a application as a submission for an appeal.
development permit was applied for;
(2) The appeal must be started within 20 business
(d) the length of a relevant period; days after the day the decision notice or negotiated
(e) a deemed refusal. decision notice is given to the advice agency as a
(2) An appeal under subsection (1)(a) to (d) must submitter.
be started within 20 business days (the “applicant’s Appeals for matters arising after approval given
appeal period”) after the day the decision notice or (co-respondents)
negotiated decision notice is given to the applicant. 4.1.30.(1) For a development approval given for a
(3) An appeal under subsection (1)(e) may be development application, a person to whom any of the
started at any time after the last day a decision on the following notices have been given may appeal to the
matter should have been made. court against the decision in the notice-
Appeals by submitters (a) a notice giving a decision on a request for
4.1.28.(1) A submitter for a development application extension of the relevant period for an approval;
may appeal to the court about- (b) a notice giving a decision on a request to make a
(a) the giving of a development approval, including minor change to an approval.
any conditions (or lack of conditions) or other (2) The appeal must be started within 20 business
provisions of the approval; or days after the day the notice of the decision is given to
(b) the length of a relevant period for the approval. the person.
(2) The appeal must be started within 20 business (3) Subsection (1)(a) does not apply if the
days (the “submitters appeal period”) after the day approval resulted from a development application
the decision notice or negotiated decision notice is (superseded planning scheme) that was assessed as
given to the submitter. if it were an application under a superseded planning
scheme.
(3) If a person withdraws a submission before the
application is decided, the person may not appeal the (4) Also, a person who has made a request
decision. mentioned in subsection (1) may appeal to the court
against a deemed refusal of the request.
(4) If an application involves both impact
assessment and code assessment, appeal rights for (5) An appeal under subsection (4) may be started
submitters are available only for the part of the at any time after the last day the decision on the
application involving impact assessment. matter should have been made.
(5) If an application is processed under section Division 9 - Appeals to court about other matters
6.1.28(2), appeal rights for submitters for the Appeals for matters arising after approval given
application are available only for the aspects of the (no co-respondents)
development that would have required public
notification under the repealed Act. 4.1.31.(1) A person to whom any of the following
notices have been given may appeal to the court
against the decision in the notice-
(a) a notice giving a decision on a request to change
or cancel a condition of a development approval.
1
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 9 of 10
Page 10
2009/103
(b) a notice under section 6.1.442 giving a decision to (d) the length of a period mentioned in section 3.5.21
change or cancel a condition of a development relevant period;
approval. (e) a deemed refusal.
(2) The appeal must be started within 20 (2) An appeal under subsection (1)(a) to (d) must
business days after the day the notice of the decision be started within 20 business days (the “applicant’s
is given to the person. appeal period”) after the day the decision notice or
(3) Also, a person who has made a request negotiated decision notice is given to the applicant.
mentioned in subsection (1)(a) may appeal to the (3) An appeal under subsection (1)(e) may be
court against a deemed refusal of the request. started at any time after the last day a decision on the
(4) An appeal under subsection (3) may be matter should have been made.
started at any time after the last day the decision on The Registrar for the Building and Development
the matter should have been made. Tribunal may be contacted at the website
Appeals against decisions to change approval http://www.localgovernment.qld.gov.au/
conditions under the repealed Act
4.1.33A.(1) A person who is dissatisfied with a
For Infrastructure Charges Only
decision made on an application to change the 4.1.36 Appeals about particular infrastructure
conditions attached to an approval given under charges
section 2.19(3)or section 4.4 of the repealed Act may (1) This section applies to a person who has been
appeal to the court against- given, and is dissatisfied with, an infrastructure
(a) the decision; or charges notice or a regulated State infrastructure
(b) a deemed refusal of the application. charges notice.
(2) An appeal under subsection (1)(a) must be (2) The person may appeal to the court against the
started within 20 business days after the day notice of notice.
the decision is to be given to the person. (3) The appeal must be started within 20 business
(3) An appeal under subsection (1)(b) may be days after-
started at any time after the last day a decision on the (a) if the notice is given because of a development
matter should have been made. approval or master plan approval-the day the
Appeals against local laws applicant is given notice of the decision about the
approval; or
4.1.33B.(1) An applicant who is dissatisfied with a
decision of a local government or the conditions (b) otherwise-the day the notice is given to the
applied under a local law about the use of premises or person.
the erection of a building or other structure permitted (4) An appeal under this section may only be about-
by the planning scheme may appeal to the court (a) whether a charge in the notice is so
against the decision or the conditions applied. unreasonable that no reasonable relevant local
(2) The appeal must be started within 20 business government, State infrastructure provider or
days after the day notice of the decision is given to the coordinating agency could have imposed it; or
applicant. (b) an error in the calculation of the charge.
For Building Works Only (5) To remove any doubt, it is declared that an
Rights of appeal conferred by Section 4.2.9 of the appeal under this section can not be about the
Integrated Planning Act 1997 as follows: methodology used to establish the charge in the
relevant infrastructure charges schedule or regulated
Division 3 – Appeals to tribunals relating to
State infrastructure charges schedule.
development applications
Appeals by applicants
4.2.9(1) An applicant for a development application
may appeal to the Building and Development Tribunal
against any of the following-
(a) the refusal, or the refusal in part, of a development
application;
(b) a matter stated in a development approval,
including any condition applying to the
development, and the identification of a code
under section 3.1.6;3
(c) the decision to give a preliminary approval when a
development permit was applied for;
2
Section 6.1.44 (Conditions may be changed or
cancelled by assessment manager or concurrence
agency in certain circumstances)
3
Section 3.1.6 (Preliminary approval may override
local planning instrument)
Page 10 of 10
Used in these records
Concurrence Agency - EPA - Decision Notice [As Published]Related documentApplication case desk ↗
About this file
- File size
- 277 KB (small file)
- File type
No other editions are linked here.