Callaghan & Toth
4. WATER QUALITY MANAGEMENT PLAN
4.1 Proposed On-Site Stormwater Treatment Process
The developed site was divided into MUSIC model sub-catchments as shown on Plan No.
1303-01. The proposed treatment train for the development site is illustrated on Plan No. 1303-
02 and listed below:
1. The Bioretention Basin will treat the stormwater runoff from the access roads, car parks,
verge and rainwater tank overflow. The treated runoff will then be directed to a vegetated
area within the property. The bio-retention component will remove the nutrients, heavy
metals, and retard flow.
The Bioretention Basin will be unlined and also act as a Detention basin.
2. Rainwater Tanks will be required to collect water from the new roofs. The tanks are to be
underground and are to have potable top-up when 90% empty with an overflow pipe
discharging to the bioretention basins. The tank capacity is to be adequate for the supply of
washing machine cold water, toilets, and landscaping.
4.2 MUSIC Model
4.2.1 Source Nodes
Catchment areas of source nodes within the proposed development have been identified as
sub-catchments such as roofs, carparks, road and verge areas. MUSIC allows for the
characteristics of these source nodes to be amended to ensure that accurate pollution
generation and hydraulic characteristics are used to generate stormwater runoff within the
model. Table 4.1 below details the sub-catchments used in the MUSIC model, land use,
percent imperviousness and area of each sub-catchment. The MUSIC Modelling Guidelines for
South-East Queensland -
Version 1 December 2010 have been used to set level of
imperviousness. The site has been related to a "Commercial" land use and pollutant export
parameters detailed in the Guidelines for this land use have been used for each node.
TABLE 4.1 MUSIC CATCHMENT AREAS (DEVELOPED)
Catchment Land Use Music Impervious Area (ha)
Habitable Roof Area Commercial 100% 0.3574
(CatchmentA)
Car Park to Bio-retention Commercial 90% 0.0387
(Catchment B1)
Car Park to Bio-retention Commercial 90% 0.0571
(Catchment B2)
TOTAL O.4532ha
11
1303, Kabara Hostel, Cooroy IWMP.doc January 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU30/0030Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.