4.3.1 Water Quality Objectives
This model meets the pollution load reduction target as detailed in Water by Design Deemed to
Comply Solutions Storm water Quality Management (South East Queensland) version 1.0-
-
Table A-2. The following have been included in Appendix 2.
. The treatment train effectiveness for the system.
. The MUSIC Version 5 Summary Report.
The information above indicates that the additions to the Karbara Centre and the proposed
stormwater treatment train will achieve reductions in pollutant loads as detailed in Table 4.2
below.
TABLE 4.2: COMPARISON OF LOAD REDUCTIONS
Parameter MUSIC POLLUTANT
REDUCTION LOAD
RESULT REDUCTION
TARGETS
Flow 32.8%
Total Suspended Solids 86% 80%
Total Phosphorous 60.8% 60%
Total Nitrogen 65.9% 45%
Gross Pollutants 100%
4.3.2 Assessment of Results
The developed site has been modelled as a series of commercial sub-catchments, which
incorporate Water Sensitive Urban Design (WSUD)treatment trains. Plan No’s 1303-02 shows
the proposed locations of the rainwater tank, bio-retention swale and bio-retention basin. The
reductions listed in Section 4.3.1 above comply with Council’s requirements. Therefore, it is
considered that the proposed stormwater treatment system is currently sufficient to reduce the
pollutants prior to exiting the site.
13
1303, Kabara Hostel, Cooroy IWMP.doc January 2013
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU30/0030Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.