APPENDIX 1: PRELIMINARY STORMWATER QUALITY MANAGEMENT
PLAN
GROSS POLLUTANT TRAPS I SEDIMENT & OIL ARRESTOR
ISSUES PROCEDURES
Design Phase
Objective Ensure that the GPT’s I Sediment & Oil Arrestors are generally sized to suit final
catchment size on Works Plans.
Actions The Consulting Engineer is to ensure that the GPT’s/Sediment & Oil Arrestors are
located in a suitable area, sized according to guidelines, have correct mesh size
and a high flow bypass specified with the appropriate erosion overflow protection.
Monitoring The Consulting Engineer is to review the Works Plan prior to issuing For
Construction Plans.
Reporting Works Plans are to be provided to consultants, developer and contractor.
Stormwater Quality Management Plan including maintenance details of proposed
GPT is to be submitted with works plans and provided to the building owner or
Manager.
Incidents The GPT’s/Sed Traps are not approved according to submitted plans.
Corrective Actions The Consultant will redesign the GPT/sediment & oil arrestors to address any
concerns of developer and contractors.
Major changes will require further Stormwater Quality Management Modelling.
Construction Phase
Objective GPT’s/Sediment & Oil Arrestors are installed correctly to allow treatment of
stormwater runoff prior to exiting into adjacent conservation land.
Actions The Contractor will install the GPT’s/Sediment & Oil Arrestors in accordance with
the Works drawings and manufacturers specifications.
Monitoring The Contractor will carry out weekly inspections of the GPT’s/Sed Traps (Including
during the defects liability period). The following will be examined at each
inspection:
. Gross pollution build up
. Oil build up
. Sediment build up
. Erosion at the inlet & outlet
Reporting Records are to be logged and kept for verification of compliance on a need basis
Incidents . Gross pollutants clog intake.
. Gross pollutants fill storage area to the maximum depth recommended by
the manufacturer.
. Sediment builds up.
. Oil builds up
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU30/0030Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.