plumber.
Builder to review Plumbing application to ensure with requirements of this
IWMP.
Builder to assess that rainwater I storm water tank systems are correctly
installed as per requirements.
Reporting Plumbing approval to be logged and kept for verification of compliance on a
need basis
Incidents Approval is not granted for plumbing application.
Rainwater IStormwater tanks are not installed correctly.
Overflows are not installed correctly.
Float switch alarm is not installed correctly.
Corrective Action Builder I plumber to review application and change to address issues raised.
Builder I plumber to re-install parts of rainwater I stormwater tank system that
are faulty and ensure they are installed as per manufacturer’s specifications
and requirements of this IWMP.
Operational Phase
Objective Ensure that rainwater I stormwater tank system is operating effectively and
providing non-potable water supply to the centre.
Ensure that rainwater I stormwater tank system is not providing a breeding
habitat for mosquitos.
Actions Owner to maintain rainwater I stormwater tank systems as follows and conduct
six monthly inspections:
. Check gutters for leaf litter
. Check stainless steel mesh guards are in place
. Check first flush system is functioning
. Check overflow is not causing any scour
. Check float switch is functioning
Owner to also conduct periodic assessments (approx 5 to 10 years) to
determine whether sediments deposits require removal from within the tank.
Monitoring Owner to monitor rainwater tank systems as detailed above.
Reporting Records are to be logged and kept for verification of compliance on a need
basis.
Incidents . Rainwater tanks has been removed or disconnected
. Rainwater tank system is faulty e.g. roof, guttering, first flush system or
tank is damaged.
. Overflow has been disconnected from absorption trench
. Overflow is causing scour.
. Rainwater tank capacity is insufficient for demand.
Corrective Action Owner will be required to :
. Reinstall or connect rainwater tank
. Maintain rainwater tank system
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU30/0030Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.