Council archive · source document
Referenced Document - MCU30/0030 · MCU13/0030
Very large file (19.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
PRE DEVELOPMENT Cooroy Aged ca noosa 10-Year Ouration=6 min, Inten=20B.9 mm/hr
Prepared by {enter your company name here} Printed 17/02/2013
HydroCAOO 10.00 sIn 05328 @2011 HydroCAD Software Solutions LLC
TIme span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fall=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
Subcatchment 2S: Grass carpark area Runoff Area=957.0 m2 0.00% Impervious Runoff Depth=12 mm
Tc=10.0 min C=0.70 Runoff=0.02336 m3/s 0.011 MI
Subcatchment 5S: Existing roof Runoff Area=2,806.0 m2 100.00% Impervious Runoff Depth=28 mm
Tc=6.0 min C=1.00 Runoff=0.16306 m3/s 0.079 MI
Subcatchment 6S: grass for new roof Runoff Area=768.0 m2 0.00% Impervious Runoff Depth=12 mm
Tc=10.0 min C=0.70 Runoff=0.01874 m3/s 0.009 MI
Reach 4R: (new Reach) Inflow=0.20516 m3/s 0.100 MI
Outflow=0.20516 m3/s 0.100 MI
Total Runoff Area = 0.4531 ha Runoff Volume = 0.100 MI Average Runoff Depth 22 mm=
38.07% Pervious = 0.1725 ha 61.93% Impervious 0.2806 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU30/0030Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.