Council archive · source document
Referenced Document - MCU30/0030 · MCU13/0030
Very large file (19.1 MB): the original may take a few minutes to open or download. The page text below is quick to read.
post delevopment Cooroy Aged care noosa 10-Year Duration=8 min, Inten=188.0 mmlhr
Prepared by {enter your company name here} Printed 18/02/2013
[email protected] sIn 05328 @ 2011 HydroCAD Software Solutions LLC
Time span=0.00-3.00 hrs, dt=0.01 hrs, 301 points
Runoff by Rational method, Rise/Fa"=1.0/1.7 xTc
Reach routing by Stor-Ind method -
Pond routing by Stor-Ind method
Subcatchment 2S: access+carpark Runoff Area=957.0 m2 0.00% Impervious Runoff Depth=28 mm
Tc=6.0 min C=0.90 Runoff=0.04498 m3/s 0.027 MI
Subcatchment 45: new roof Runoff Area=3,574.0 m2 100.00% Impervious Runoff Depth=32 mm
Tc=6.0 min C=1.00 Runoff=0.18664 m3/s 0.113 MI
Reach 4R: (new Reach) Inflow=0.19537 m3/s 0.126 MI
Outflow=0.19537 m3/s 0.126 MI
Pond 1P: 36sqm Peak Elev=106.198 m Storage=0.031 MI Inflow=0.23162 m3/s 0.140 MI
Outflow=0.19537 m3/s 0.126 MI
Total Runoff Area = 0.4531 ha Runoff Volume = 0.140 MI Average Runoff Depth 31 mm=
21.12% Pervious = 0.0957 ha 78.88% Impervious 0.3574 ha
=
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
REFERENCED DOCUMENT - MCU30/0030Related documentApplication case desk ↗
About this file
- File size
- 19.1 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.