21 March 2025


Chief Executive Officer
Noosa Council

Attention: Matthew Pinese
Via email: [email protected]

              cc      Gabriel Seeger
                      c/- Brennan Planning Pty Ltd
                      Attention: Marcus Brennan
                      Via email: [email protected]

Dear Sir/Madam,

Energex Advice Agency Response
Our Ref: ECM 23412757-23409954

This Referral Agency response is given under section 56 of the Planning Act 2016.

 Response
 Outcome                  Approved in full - subject to conditions
 Date of response         21 March 2025
 Referral assessment      Advice
 capacity
 Matters referral         The purpose of the Electricity Act 1994 and Electricity
 assessment made          Safety Act 2002
 against (S55(2))
 Reasons for decision     The works do not conflict with:
 (S56(7)(b))
                                 the objectives set out within Part 2, Section 3 of the
                                  Electricity Act 1994
                                 the purpose of the Electricity Safety Act 2002 as set
                                  out within Part 1 Division 2 Section 4 & 5.
                          The works do not adversely impact on the safe, efficient,
                          and economically viable operation of the supply network.

 Development Details
 Applicant                   Gabriel Seeger
 Assessment Manager          Noosa Council
 Council Application No.     RAL25/0005
 Street Address              195 Tablelands Road, Cooran Qld 4569
 Real Property Description   Lot 2 on SP105618
 Development Type            Development Permit for Reconfiguring a Lot – 1 Lot into
                             2 Lots
 Referral Trigger            ☐ Schedule 10, Part 9, Division 2, Table 1, Item 1
                             (10.9.2.1.1) – Reconfiguring a lot subject to an easement
                             for the benefit of a distribution entity under the Electricity
                             Act for a supply network; or part of the lot is within 100m
                             of a substation site
Log in to download the original file

Energex Referral Response - 195 Tablelands Rd, Cooran.pdf · 120 KB (small file)

Full text of the other 2 pages

Page 2

                                                    2




 Impacted Electrical               Easement C on RP887963, Easement D on RP887963
 Infrastructure                    & Easement F on RP887963 – O/H 11kV lines (Feeder
                                   no.: COR22A)

Energex provides the following response to the application in accordance with Section
56(1) of the Planning Act 2016:

 Component of                      Advice Agency direction
 Development
 ROL                               ☐ S56(1)(b)(i) – approval subject to stated development
                                   conditions

In accordance with Section 56(1) should the Assessment Manager decide to approve
the proposed Development Application, as an Advice Agency, Energex requires that
the assessment manager impose the below conditions. These conditions have been
imposed in response to the matters prescribed under Section 55 (2) of the Planning Act
2016.

                                    Table 1
                       Plans forming part of this Approval
 Title                               Plan No.              Issue                            Date
 SP347710 – Plan of Lots 10 & 11     -                     -                                19/2/24
 Cancelling Lot 2 on SP105618
 (Sheets 1 and 2)

It is understood the proposed development involves reconfiguring a lot to create two (2)
lots that are dissected by a gazetted road.

                                                Table 2
 Condition                                      Timing                         Purpose/Reason
 1   Carry out the approved                     At all times                   To ensure the
     development generally in                                                  development is
     accordance with the approved                                              carried out generally
     plans and documents outlined                                              in accordance with
     within Table 1 of this approval                                           the plans of
     and the following:                                                        development
                                                                               submitted within the
              The specifications, facts                                       application
               and circumstances as
               set out in the
               development application
               submitted to Energex;
               and
           Where a discrepancy or
               conflict exists between
               the written conditions of
               the approval and the
               approved plans, the
               requirements of the
               written conditions prevail
 2     Any alterations to the plans and          At all times                  To ensure the
       document(s) identified within                                           development is
       Table 1 of this response are to                                         carried out generally

                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency

Page 3

                                                    3




         be resubmitted to Energex for                                         in accordance with
         comment                                                               the plans of
                                                                               development
                                                                               submitted within the
                                                                               application
 3       Any future building envelope on         At all times                  To ensure access to
         Lot 11 is to be located outside of                                    the easement and
         Easement F on RP887963.                                               access along the
                                                                               easement is available
                                                                               at all times.

General Advice:

        Compliance with the Electrical Safety Act 2002, including any Code of Practice
         under the Act and the Electrical safety Regulation 2013 including any safety
         exclusion zones defined in the Regulation is mandatory

         Should any doubt exist in maintaining the prescribed clearance to the overhead
         conductors and electrical infrastructure then the applicant is obliged under the
         Act to seek advice from Energex.

        Any costs incurred by Energex as a result of the works on the easement are to
         be met by the property Developer / owner.

        This response does not constitute an approval to commence any works within
         the easement. Consent to commence works relevant to the conditions of the
         easement is required. All works on easement (including but not limited to
         earthworks, drainage and detention basins, road construction, underground and
         overhead services installation) require detailed submissions, assessment, and
         consent (or otherwise) by Energex.

        All works proposed to be undertaken in close proximity to overhead or
         underground electrical lines are to be undertaken in accordance with Energex’s
         Works Practice Manual WP1323. This document refers to various standards,
         guidelines, calculations, legal requirements, technical details, and other
         information relevant to working near high voltage infrastructure. A copy of
         WP1323 can be found online via Energex’s document library (Document library
         | Energex).

Should you require any further information on the above matter, please contact Harriet
Veal on 0427 293 604 or via email at [email protected] faithfully,


Harriet Veal
Town Planner




                                   Have you seen our fact sheets?
     See the ‘considerations when developing around electricity infrastructure’ section of our website
                                 www.energex.com.au/referralagency

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.