Original source · versioned page text
Compiled Approved Plan - 132007 0738 05
Plans and drawings: the text below has words only, no drawings.
Very large file (11.9 MB): may take a few minutes to open.
Original PDF page 14, section 1. The text section number identifies this passage in the reader.
Noosa Council documents
-
APPROVED PLANS
132007.738.04
NOOSA COUNCIL
24 JUNE 2019
-
EXIT
83 84 85 86 87 88 89 90
S
N
S
UNIT 40 UNIT 39
78 m² 99 m²
UNIT 42 UNIT 41
61 m² 61 m² UNIT 38
61 m²
PWD PWD PWD
REF REF
PWD PWD
REF REF REF
POD H - FFL 5.1n
Scale 1 : 100
C GIA Issue - RFI 30-05-2019
B GIA Issue 09-05-2019
A PRELIMINARY ISSUE 19-04-2019
Issue Description Date
Project
NOOSAVILLE SMART
HUB
Client Name
DOUG SIMON
VOID
Project Address
64 GATEWAY DRIVE
UNIT 39 NOOSAVILLE QLD 4566
VOID
Designer (s) Drawn by
Designer Author
Drawing Title
POD H - FLOOR PLAN
UNIT 40 UNIT 39 UNIT 38
UNIT 42 UNIT 41 72 m² 51 m² VOID
FFL. 8.400 m FFL. 8.400 m
VOID VOID
VOID
POD H - MEZ
Scale 1 : 100
ZEST DESIGN STUDIO
P | 07 5474 1664
A | 1A/12 Action St, Noosaville, QLD 4566
E | [email protected]
W | www.zestbuildingdesign.com.au
Project Number Sheet Number
POD H 19020 A.207
SCALE @A1
0 0.5m 1m 2m Phase Issue
1:50
SD C
Document Set ID: 20888292
Version: 1, Version Date: 26/06/2019 Print Date: 3 July 2019, 11:36 AM
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.