Council archive · source document
SUPERSEDED Negotiated Decision Notice - 010.2010.00000811.001 [As Published] · 132010.811
2010/811 Page 13 of 17 [OCR of page images] 2010/3811 Notice———. Concurrence Agency Response CONDITIONS The foltowing concurrence agency conditions are to be attached to any approval: 41 Prior to the commencement of any development-related excavation, earthworks or soil disturbance, that part of the site to be so worked is to be subjected to investigation and, where Necessary, appropriate remedial action. 2 Any person employed to work on any part of the site where Condition 1 has not been satisfied is to be forewarned in writing by the applicant. . This warning-is to explain that information available to DERM indicates a potential for residual UXO exists on the site‘and work should preceed-with-due caution: ‘Itis-to-state-the precedure-to be - followed by any person finding an object suspected of being explosive ordnance or component thereof: Do not disturb the object. Take action, where appropriate, to prevent it being disturbed by another person. Note its approximate dimensions and general appearance. Note the route to its location. Advise the Police as soon as possible. eeeee 3 Following investigation and any remedial action taken to-satisfy Condition 1 above, the applicant is to submit a report, prepared in accordance with current guidelines, to DERM for assessment. DERM is to Subsequently advise the Sunshine Coast Regional Council and the applicant of its assessment i in regard to Condition 1 being satisfied. 4 Prior to Condition 3 being satisfied, no excavated gravel, rock, sand or soil is to be removed from the site without written DERM approval. 5 The applicant is to advise the owner and any occupier of the site of the above responsibilities. General comments or advice about applications concerning land potentially affected by UXO Appricants may. contact DERM’s Project Manager (UXO) or visit Defence’s website http://Awww.defence.gov.au/uxo/ for the details of current UXO investigation and remedial search contractors. DERM accepts reports based on investigative and remedial work carried out by these contractors. Investigation and remedial action to satisfy Condition 1 typically involves sampling/search programs with detection equipment unless the use of such equipment is: e considered unwarranted by a UXO contractor due to the extent of any prior excavation or earthworks or, conversely, of any filling proposed as part of the development program; or * prevented or made impracticable by the presence of a structure, stockpile, natural barrier or metal waste. In the latter case, alternative action may be appropriate to minimise the risk in the first instance. For example, where the risk of exposure to any UXO that may exist is reduced by the presence of a structure or natural barrier, issuance of the standard UXO warning (see Condition 2) may suffice while the structure, -« Stockpile or barrier.remains in-place.-Where.a:structure is.to:be removed or reduced as part of the srdevelopment program, protective'precautions, commensurate with any greater risk to which workers might Page 3 of 4 + 091217 . Department of Environment and Resource Management Page 13 of 17
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
SUPERSEDED Negotiated Decision Notice - 010.2010.00000811.001 [As Published]Related documentApplication case desk ↗
About this file
- File size
- 295 KB (small file)
- File type
No other editions are linked here.