Appendix A Proposal Plans [OCR of page images] Norris Clarke & O’Brien Pty Lta Licensed Surveyors Town Planners Development Consultants Appendix A Proposal Plans
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.
Full text of sections 2 to 5 (of 27)
Section 2
MASTER LAYOUT: PBA A2 Template Landscape. FILE PATH: S:\Projects\2014\20140446 MEAD 2\0446_A_PBA\0446_A02_Documentation\0446_A02_DA\0446_A02_DA Active\0446_DA_Active.pln
External Perspective from Seaview Terrace
1
Locality Plan SITE
2 44 SEAVIEW TERRACE, SUNSHINE BEACH
PROPOSED NEW RESIDENCE
44 SEAVIEW TERRACE, SUNSHINE BEACH, QLD
Drawing No Description
0446-DA101 Title Page
0446-DA102 Site Plans
0446-DA103 Ground Floor Plan
0446-DA104 Level 01 Plan
0446-DA105 Roof Plan
0446-DA106 North + South Elevations
0446-DA107 East + West Elevations
0446-DA108 Longitudinale Sections
0446-DA109 Cross Sections
0446-DA110 Area Diagrams
0446-DA111 Earthworks Plan
0446-DA112 External Finishes Schedule
NOTES: Client Title
- ALL LEVELS TO AHD. Catherine Bastock & Title Page
- REFER TO SURVEY FOR INFORMATION RELATING TO Robert Mead Scale
N.T.S.
at A2 size
Drawing No.
0446-DA101
EXISTING SITE.
D.A.
A 27.03.2015 D.A. ISSUE AD BB Project
- REFER TO DRAWINGS & SPECIFICATION BY LANDSCAPE
BEACH HOUSE
Rev Date Amendment Drwn Chck
ARCHITECT FOR INFORMATION RELATING TO EXTERNAL
This drawing is copyright of Popov Bass Architects. It may not be used without written consent. Do WORKS, LANDSCAPING, TREES AND THEIR REMOVAL. Level 3 2 Glen Street Milsons Point NSW 2061 Australia 44 Seaview Terrace Sunshine Beach, QLD 4567 Australia
not scale off this drawing. Use figured dimensions only. Verify all dimensions on site. Alex Popov
Architects Pty Ltd ABN: 91 002 866 364. Alex Popov NSW ARB 4494 Brian Bass NSW ARB 6470. t 02 9955 5604 e [email protected] w popovbass.com.au
GSPublisherEngine 289.64.68.100
Section 3
MASTER LAYOUT: PBA A2 Template Landscape. FILE PATH: S:\Projects\2014\20140446 MEAD 2\0446_A_PBA\0446_A02_Documentation\0446_A02_DA\0446_A02_DA Active\0446_DA_Active.pln
46-48 Seaview Terrace
TWO STOREY RESIDENCE
LOT 60
COASTA
SP215913
L BUILDIN
N PATH
G LINE
WINTER SU
N PATH
SUMMER SU
EXISTING CONCRETE DRIVE
VIEW OF THE SEA /
SEAVIEW EXISTING TREE EXISTING NORFOLK PINE SEA APPROX. 25m FROM
SITE BOUNDARY
TERRACE
AERIAL VIEW 44 SEAVIEW TERRACE
1
LOT 58
RP81810 EXISTING TREES
EXISTING MELALEUCA
QUINQUENERVIA STREET TREE
SITE AREA
641.7 m2
EXISTING SCREW PINE
42 Seaview Terrace
TWO STOREY RESIDENCE
LOT 57
RP81810
Existing Site Plan
4
46-48 Seaview Terrace
COASTA
TWO STOREY RESIDENCE
SITE VIEW TO THE SEA LOT 60
2 SP215913
L BUILDIN
G LINE
1,500
EXISTING MELALEUCA
QUINQUENERVIA STREET EXISTING NORFLOK PINE
TREE TO BE RETAINED 6,000 TO BE RETAINED
RUMPUS LIVING OUTDOOR LIVING
SEAVIEW
POOL
TERRACE
ENTRY COURTYARD
VIEW OF THE SEA /
2,850 SEA APPROX. 25m FROM
SITE BOUNDARY
KITCHEN
BINS D
DINING
F
GARAGE STORE W
BATH 4,950
LAUNDRY
NEW CONCRETE DRIVEWAY PANTRY
STORMWATER DETENTION
UNDER GARAGE FLOOR STORAGE 13,550
2,180
2,100
OUTLINE OF APPROVED PROJECT
SHOWN DASHED IN RED
EXISTING TREE
3 42 Seaview Terrace
TWO STOREY RESIDENCE
LOT 57
RP81810
Proposed Site Plan
5
NOTES: LEGEND: Client Title
- ALL LEVELS TO AHD. Catherine Bastock & Site Plans
OUTLINE IF APPROVED PROJECT
- REFER TO SURVEY FOR INFORMATION RELATING TO Robert Mead Scale
1:200 at A2 size
Drawing No.
0446-DA102
EXISTING SITE.
D.A.
A 27.03.2015 D.A. ISSUE AD BB Project
- REFER TO DRAWINGS & SPECIFICATION BY LANDSCAPE
BEACH HOUSE
Rev Date Amendment Drwn Chck
ARCHITECT FOR INFORMATION RELATING TO EXTERNAL
This drawing is copyright of Popov Bass Architects. It may not be used without written consent. Do WORKS, LANDSCAPING, TREES AND THEIR REMOVAL. Level 3 2 Glen Street Milsons Point NSW 2061 Australia 44 Seaview Terrace Sunshine Beach, QLD 4567 Australia
not scale off this drawing. Use figured dimensions only. Verify all dimensions on site. Alex Popov
Architects Pty Ltd ABN: 91 002 866 364. Alex Popov NSW ARB 4494 Brian Bass NSW ARB 6470. t 02 9955 5604 e [email protected] w popovbass.com.au
GSPublisherEngine 289.64.68.100
Section 4
L BUILDIN
MASTER LAYOUT: PBA A2 Template Landscape. FILE PATH: S:\Projects\2014\20140446 MEAD 2\0446_A_PBA\0446_A02_Documentation\0446_A02_DA\0446_A02_DA Active\0446_DA_Active.pln
G LINE
1
0
APPROX BALCONY
.8
.8
30
30
FLOOR LEVEL
46-48 Seaview Terrace 27.14FFL
Conc. Drive
COASTA
TWO STOREY RESIDENCE TOP OF RENDERED BUILDING 30.51
31 IM OF
Y
6 E
LOT 60 WINDOW WINDOW
WINDOW
.4 N
CH OP
TOP OF BUILDING 30.53
8
Ht 10
.0
7
WINDOW
WINDOW
25
SP215913
Power/Fuse Box
T
.0
25
L BUILDIN
C-C
D-D
E-E
Spread 6
25
WINDOW
TOP OF RENDERED BUILDING 30.82 RECESSED WINDOW Trunk 0.3
WINDOW WINDOW AREA 2000 Block wall PINE
G LINE
TOP OF BALCONY EDGE 28.33
9
PP
WINDOW
EXISTING NORFLOK
DOOR
.7
PINE TO BE
0
24
62287 95°09'40"
W
W
W
2 W
24 W
2 TW
W
.8
24 .86
RETAINED TIMBER PALING
1T
5T
6T
55 .8 8T
0T
0T
00
4
1
2
2
24
120
2
19 14
SP3090
BOUNDARY FENCE 1.8m
3
1
43.07
.4
.8
.3
.0
.7
.3
.7
.1
3 3. 23 25.8
.0 26.1
.1
.2
.5
21
20
22
3.
.
.
23 HIGH
Sewer MH 24
23
19
23
22
21
24
25
20
25
22
2
177°21'5
W
6
SL 24.70
8B
2.144
6
7
26
0
.1
71,500
23 43 .74
1
.7
8
.2
.6
.5
4.
23 2,350
TW
24
.2
24
23
8
20
21
IL 23.26
ROOF LINE OVER
8 . 3
24
12
2
.1
1 2
2
21
9
.3 23 2
35
3
0
.9
3
.2
.5 2
.2
4
.2
.4
22
.4
.6
.0
5
.6
22
9.
.2
19
6 2
22
23
.8
22
24
23
22
.1 3.2
0
700
24
0"
1
19
.3
8
EXISTING MELALEUCA
.3
.1
23
23 2
24
QUINQUENERVIA STREET
4
20
VOID
.3
TREE TO BE RETAINED
23
2
Section 5
20
2
22
OUTLINE OF APPROVED LOOK-OUT
.3
.2
TW
0 1.
Conc. Drive
4 55
24
DECK LOCATION SHOWN DASHED IN
22
6,000
.6 2
6
01
.6 3.
RED
.1
A-A A-A
6
23 2
02
23,100
9.
21
4
.9
.6
191
Ht 6
9
6
RUMPUS
.
.0
22
.1
21
21
22
A: 15.01 m2
Spread 4
23 33
1
9
19
24
.3
.0
LAWN
2
.
0
SEAVIEW TERRACE
23
20
Trunk 0.3
9
1.
.1
LIVING
2
W
0
23
0
4
A: 46.06 m2
.5
.0
2
2
.9
4B
OUTDOOR LIVING
41
TW
.7
.8
2
COURTYARD
23
BALCONY OVER BALCONY OVER
24
23
Sewer UG
POOL
.1
A: 39.00 m2
.6
1.
23
19
A: 38.17 m2
W
20
OUTLINE OF APPROVED POOL LOCATION
87
8
22
50 2
BALCONY OVER
23,100
2T
1
.8
SHOWN DASHED IN RED
51
ng fence 20.
.9
5
22
.9
.2
ENTRY
21
18
58
1.
23,635 23,450 23,275 23,100
22
A: 8.36 m2 23,100
2
9
21.78
8
358°50'20"
8
1
.8
RP81810
2,850
8
W
.4
.6
.9
.7
08
22,575
02
19
15.158
6T
19
4
23
22
RP81810
8
23
9
23,432 23,275 23,100
2.
CORRIDOR
.6
5
7
1.
.8
.1
.6
Ht 6
2
.3
.5
18
22
2
A: 6.60 m2
23
23
CONCRETE DRIVEWAY
23
23
Spread 6
'10"
8
8
.6
13.995
TOW 19,300 TOW 18,500
.8
COAT
2
STORMWATER DETENTION
1200 Timber paili
KITCHEN
22
Trunk 0.3
D
2
1
UNDER GARAGE FLOOR The text continues on section 6.