[Sunshine Coast Checklist - Applications Involving Land
9g Development & Land Use Sections
egional VOUnci °
IDAS APPLICATION __ ___
This checklist should be used for any IDAS application. Please check each of the following items before accepting an
application at the counter.
1. APPLICATION FORMS
1.1 Form1PartA
1.1.1 Ensure that the form is fully completed and is a current version. .
1.1.2 In the case of an MCU or Op Works below the high-water mark, owner’s consent is required.
1.1.2.1 If there are multiple owners, the consent of each owner is required.
1.1.2.2 If the owner of the land is a company, either ACN No, Company name clearly indicated by
signatory) or Company Seal required.
1.2 Form! Part B-R Supporting Information
1.1.2 Ensure that for each box checked on Form A, the relevant additional Forms B-R are attached.
7 @. - 1.1.2.1. Ensure that each of Forms B-R which are attached are fully completed. <4
2. IDAS ASSESSMENT CHECKLIST oe : 0
2.1 Ensure that relevant sections have been checked and/or completed with regard to referrals
2.2 Ensure correct parts of Form 1 are provided where required (ie most common are Part J for
Clearing Vegetation, Part N for Contaminated land and Part P for Prescribed Tidal Works)
3.. ENVIRONMENTALLY RELEVANT ACTIVITIES
3.1. Ensure that Part G is completed if EPA referral is required.
3.2. Where EPA is delegated to Council (see * in ERA checklist), ensure that the correct application
fee is paid and recorded on the application. (Refer Environmental Health for fees) ‘
: £
4, FORM 2 - REQUEST TO CHANGE APPROVAL. .
4.1. Ensure that relevant items have been checked and/or completed including information regarding
applicant details along with owners consent if not current owner of land as shown on Council records.
If over multiple properties on one or more sites, consent of Body Corporate is required.
6 PLANS = , .
§.1 Ensure that generally at least 6 sets of the Plan of Development (5 for Reconfiguration and Operational [|
Works) accompany the application. In addition ensure that each set is complete.
'§.2 Ensure that 1 of the copies of the Plan of Development is in an A3 or A4 format and is
unbound.
6. SUPPORTING INFORMATION : _
6.1 Ensure that generally at least 6 copies of any report accompanies the application (5 for Reconfiguration [=]
and Operational Works). if the application is accompanied by a covering letter, ensure that it is
capable of reproduction. . [ |
6.2. Inthe case of reports, ensure that 1 of the copies is in an A3 or A4 format and is unbound. -
6.3 Additionally an electronic version is preferred where possible for ease of electronic record keeping [|
7. FEE , : / _
7.1. Ensure that the application fee, as determined from the Council's adopted scale of fees,
accompanies the application or has been paid.
e Land Use MCU applications; MCU applications including a Lot reconfiguration; Prescribed Tidal Works; Operational
~ Work if Jetty or if including Landscaping.
e Land Development Lot Reconfiguration applications and Operational Work not including Landscaping
Please DO NOT leave the application at the counter and DO NOT deliver the application to Records.
NSC g:Manduse\administrative processes\application checklist.doc , .See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalFull text of the other 17 sections
Section 2
fo ° | : 7 [oves | COMMENT
IDAS REFERRAL AGENCIES TRIGGERS (Most frequent referrals) Pie : fick ——
Please refer to IDAS Checklist for complete list
Department of Main Roads (Concurrence or Advice)
e State Controlled Road
Dept Natural Resources & Water ;
e Acid sulphate soils (Advice)
e¢ Clearing of native vegetation on freehold land (Concurrence)
Environmental Protection Agency (Concurrence)
e Environmentally Relevant Activity (for non-devolved Council as EPA)
e Contaminated land
* Environmental Management/Contaminated Land Register
* UXO
‘ = Land recently used as a ‘notifiable activity’
« Industrial land changed to sensitive uses (eg school)
e Coastal related development.
e Koala habitat
e Wetlands (Advice on! @
Queensland Transport (Concurrence)
° Railway
e Public Passenger Transport
Energex or other responsible entity (Advice)
° Electricity Easements/Substations
DIP (Concurrence)
e SEQ Regional plan
VARIOUS <
° Conservation estate (Advice)
OTHER STATE AGENCIES + TRIGGERS _ a oan) eR RG] eed eet
OWNER’S CONSENT (State land) é vee
Department of Natural Resources and Mines
EPA .
For further clarification refer to IDAS Guides prepared by Department of Infrastructure & Planning.
NSC g:\landuse\administrative processes\application checklist.doc . :Section 3
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
NS Rom 1 Dencloonmcnt Aveliteziiten idas
Part A Cray SS
Common details COOLNTTITOY )
OTE: Answer all questions unless directed to go to a particular question. Refer to the end of the form for advice on Ae GaAaR A
HOOoMa
IRpplicant deta (he aptcan i the person resporsiog or Mako Heaps prand pee not be he. owner of Iie Bind: The Nebo epee Rape eg
ar era ec qr scored Ts adr rte ser Moi aan eee ERED o
(iastng tas apfeaton ‘By odphg nk appre the Apple Fiat the bigaOns a eeporStiies resgyed by {bP hry develo PSSA BEAST:
Le ay Artal as aclu ts ol ni a NAEP helene
Company/organisation name {if applicable) |Pile-It Pty Ltd ta Noosa Jetty Builders
individual epplicant/Contact person (If there is more than one applicant, provide additional applicant details on an attachment to this form}
O fit eto =
Postal address PO Box 299, Noosaville. QLD 4566
Contact telephone number | (07) 5474 3480 Mobile phone number 0408 137 526
Facsimile number (07) 5474 3480 e-mail address [email protected]
BETA of Iie premises fe Melataoh gh re cevnpmenks popcsed ele othe Mead Oe ll cya nde a
1. Identify the premises by completing Table A, or Table 8 and/or Table C (ensure adequate information is given to identify the premises)
Table A Ifthe application is for a mobile and temporary Environmentally Relevant Activity (ERA), complete Table A only. Then go to Q2.
«LB SESE, Nate of cath cal goverinent area in which the qoble and temporaly ERA s opesed to operate ui
OR .
TableB Street address for the premises (tick applicable boxes below and insert property description in the table. Identify each-lot in a separate row.)
O (i) {CL Street address / lot on plan for the premises (Appropriate for most applications including building applications): Of
(ii) [XJ Street address /ot on plan for the !and adjoining or adjacent to the premises (Appropriate for development in water e.g. jetty,
pontoon etc) (Note: Loton plan details may be oblained from title documents, a ‘Rate’ notice, or from the focal government.)
ee a aneatet eects Se oo uy er +s: Local government area (eg: Logari,,
TP Ts [saece me temic (ese for” fares [Senimconnemcns |
AND/OR
Table Coordinates and/or a map of the premises (Appropriate for development in remote areas, over part of a lot, in water (e.g. channel dredging in Moreton
Bay) etc.)
TST EE ee gm dpiw ge a gp ec lei
“A Note: place each sat of cnoediniates ha separate Con} : “Zone, ee . Daten “hk Local governniént ares
| 1 | [1] ocoass
[_] wese4
[_] Other -
2. _ Identify if any of the following apply to the premises by completing Tables D, E, or F. (Note: in most instances, the premises will not involve any of
the following characteristics, however some applications may involve one or more of these characteristics - complete only if applicable)Section 4
' i
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Table D Complete if the premises are adjacent to or associated with a water body, watercourse or aquifer (e.g. river, creek, lake, canal)
Ta SP ey Name ower body, waioreniee ot aiuterittmewnh "SS a
a
Table E Complete if the premises are on Strategic Port Land under the Transport Infrastructure Act 1994
Se Lk ee ee a ee
Table F Complete if the premises are in tidal water
=" Name ofc govtiment fr the Gal arca (fappeoble) "| Naphe of port euory forthe alge Or epph cave)
Cn An OO
3 Indicate the total area of the premises on which the development is proposed: (Note: The total area may include land both above and below water)
Fey, otal area of premiges. aie oT Se
792.00 (Xm? [Jhectares (Tick applicable unit)
O 4. Current use/s of the premises: (e.g. vacant land, house, townhouses, apartment building, shop, service station, school, sugar cane farming etc.)
5. Are there any existing easements on the premises? (e.g. for vehicular access, electricity, overland flow, water etc.}?
BX) No = [_] Yes - Ensure the type, location and dimensions of each easement are included in plans, submitted with the application
Proposal psate aetails SR gh ee RE pel ach sacri Se ne vege die st Tees . 7 ee ee ae |
6. _ Brief description of the proposal (e.g. 6 unit apartment building, 30 tot residential subdivision, a bore, aquacufture)
Timber jetty
7, Dogs the poposal include new buildings or operational work (including any services) on the premises?
["] No Yes - Ensure the nature, location and dimensions of the proposed works are included in plans, submitted with the application
(RESource emnlemnene (egapune) = manernornanon te omred aihe ance $e MTR NGO, ee athe
8. Does the application involve taking or interfering with a State resource and therefore require a resource entitlement? (e.g. the application
involves State land (leased and freehold), declared Fish Habiat areas, taking quarry material, taking or interfering with water under the Water Act 2000, etc.} ,
O No - Geto a9 CJ Yes - Complete Table G - provide details for each evidence required on a separate row, if applicable. Evidence of resource
altocation or entitlement must be submitted wilh the application. You do not need to answer Q9 - go to the next section.
TOW TeeS CONSENT abe err eons OMga na agonseri ab ME oR FM sorm Fg aad
9. Complete Table H for applications involving a material change of use; reconfiguration of a lot; work on land below high-water mark and
not within a canal as defined under the Coastal Protection and Management Act 1995; or work on rail corridor land defined under the
Transport Infrastructure Act 1994 - provide details for each owner on a separate row, or on an attachment to this form if applicable.
—“HanesOueannes [pS Deaisetthepremmes owned” = |. ‘Gg toycitnanger 2 | abate consent &
able H = Sand postal addtess” 3. = ee ~istredh aches or fot onrplan description) 5... te. owe j pee ea wis objained *
Orjan Hakansson if
Cl- PO Box 299, 15 Saltwater Ave, Noosaville. QLD 4566 () i 04/06/2009
Noosaville 4566
Jan Hakansson 7
2 |CEPO Box 299 15 Saltwater Ave, Noosaville QLD 4566 iA Ma bn 94/06/2009
Noosaville 4566
* Owner's signature cannot be provided on the form if you intend to submit the application electronicaily. Owner's consent must be provided to the assessment manager on an
attachment containing appropriate written documentation of the owner's consent. If the owner is a company, $127 of the Corporations Act 2007 (Cwealth) details how a
company may sign as owner. Templates for the provision of owner's consent are available on the IPA website .Section 5
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
ascii and supporting iMormaton apron Toa thea jpecon fe ncaa aie oho, rng nein wet
bnciev is Parth Pease ensire‘alf docurencaron subrted wath is Fan, including arf Parts of Fors 7, or ane sonséhe, ei: dre seclacly tached to this Part ofthe Form.
““Tincpiondaisaineeriforain | “Tueqaipestay | gg, | Nebo doh
John Norden Pins e208
Porisble Long Sarvice Leave (LSI) ov. pment rca boty 2 peer ro uN Ore HOODOO ON ph lk
40. The Portable Long Service Leave Levy (PLSL) is not applicable to this application if any of the following apply: ( Tick box if applicable)
[1 the application seeks a preliminary approval only;
([] the application is not for building and construction work under the Building and Construction Industry (Portable Long Service
Leave) Act 1991, section 3AA (e.g. the application is only for a change of use, or for the following types of work carried out salely for
farming purposes: land clearing, site preparation, earthworks, fences, fodder harvesting, clearing of encroaching vegetation, clearing of
regrowth, thinning vegetation or controlling weeds or pests);
@ all costs, that relate to the work both directly and indirectly, are less than $80,000, inclusive of GST; or
{"] the work is being carried out under an owner-builder permit issued under the Queensland Building Services Authority Act 1991 -
Complete and submit a QLeave Notification and Payment Form (no payment required if owner-builder permit number stated). The receipted form must be
sighted by the assessment manager before a development permit can be given.
11. Is payment of a PLSL levy applicable to this application? (Refer to Q10 and the Advice below for more information)?
BX] No - Endof Part A
[} Yes - Answer Q12 below
OFFICE USE ONLY (For use by the Assessment Manager / Private Certifier) (Optional)
. Receiving officer's Reference
ree clase
0
PPG Tea gNORMICATON OF ENGAGEMEN ORPRUATECERNFER¢ gm
© To: [an | have been engaged as the private certifier for the building work referred to in this application.
tea ban ERE OEE ey ERIE gee. ae MARE Tc eM le Dee PRR aie eats cag!
engagement: tp : = oo : ae Rican Nemes Be ae ait Lagu «esac ne ns a oes fealet
@ Date df. | Re a's” aban, gape agi oe ee wb Gegiin es Hew EE, tf BSA ideesian ramber el ee RAR HEAT ORIS
QLEAVE NOTIFICATION AND PAYMENT (for completion by assessment manager or private certifier if applicable)
TT Ee ep me pier TR To hah ie
" SGadSiot bane cb ip, Ques Eee Nrber’ | Amol p(s Date paid | EOE by |“ aie tones wie sighted thet
Ded cing | bie tet eterna PERF? LSP RE" amen fy Rg Ms 9 go
foie ype dS et et ew tae tee Ee manager’. ps es ERS ie
Privacy Statement
The information collected on Form 1 wil! be used by the Department of Infrastructure and Planning (DIP) in accordance with the processing and assessment of your Application.
Your personal details will not be disclosed for a purpose outside of the IDAS process, except where required by legislation (including the Freedom of information Act 1992) or as
required by Parliament. This information may be stored in a DIP database. The information collected wil be retained as required by the Public Records Act 2002.
Advice for completing Part ASection 6
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
General advice
e Part A of IDAS Development Application Form 1 must be compteted and accompany all development applications. The applicant is responsible
for answering all questions fully and correctly, untess following a response there is a statement to go directly to ancther question. The
Assessment Manger may refuse to receive an application that is not property made.
° The DAS Assessment Checklist must also be completed for all development applications, other than those requiring assessment against the
Building Act 1975 only, i.e. those applications requiting the completion of Parts A and B only.
Applicant details
° If the applicant is a company or organisation, a contact person must be nominated. The applicant's signature is not required to be provided
under the IPA.
Details of the premises
e The term ‘premises’ is defined by the IPA, schedule 40 to mean a building or other structure, and land (whether or not a building or other
structure is situated on the land). The term ‘land’ is also defined to include the estate in, on, over or under the land.
° Details of the land are not required if the application involves @ mobile and temporary Environmentally Relevant Activity only. Instead complete
Table A.
° The premises may be identified in a number of ways -
« Street address and fot on plan are most common and will apply to most applications.
+ Coordinates may provide the best means of accurately identifying the location of development proposed in waters, or on a relatively small
development site distant from property boundaries on a large lot. Sufficient coordinates need to be provided to identify the boundary of the
premises the subject of the application. Eastings and northings using GDAS4 datum is preferred, but longitude and latitude and other
(specified) datum such as Zone Reference or GS84 may be provided.
° The definition of ‘water body’ and ‘watercourse’ can vary from Act to Act
e StrategicPortLandis within a local government area but a local government's planning scheme does not apply onStrategicPortLand.
O StrategicPortLandis declared under the Transport infrastructure Act 1994. For further information go to IDAS Guide 41 (Development on
strategic port land) and the Queenstand Transport (Ports) website.
e “Tidal water is defined in the Coastaf Protection and Management Act 1995 (Schedule) and ‘tidal area’ for a focal govern ment and for strategic
port land is defined in the IPA {schedule 10). Generally, the area below ‘high-water mark’ (defined by the Coastal Act in relation to high water
mark at spring tides) establishes the boundary of a tidal area. Land below high water mark is not within a local governments area unless
provided for under the Local Govemment Act 1993. Unless otherwise provided for by legislation, a toca! government has no jurisdiction below
high water mark. A tidal area for strategic port land is within the jurisdiction of the relevant port authority, while the Environmental Protection
Agency generally has jurisdiction for a local government tidal area. However, the IPA gives local governments jurisdiction for assessing and
deciding applications for prescribed tidal works within the local government tidal area, and the planning scheme may be applied to that
assessment (to the extent provided for in the code for prescribed tidal work).
Resource entitlement
° Section 3.2.1(5) of the IPA requires evidence of resource entitlement be given for applications if they involve taking or interfering with a
prescribed State resource. Schedule 10 of the Integrated Planning Regulation 1998 {IPR) prescribes the State resources, including State-
owned land, where evidence is required to be given, and the evidence required to support the application. Link to Integrated Planning
Regulation. Section 3.2.1(10}{a){ii) states an application cannot be taken to be property made without the required evidence.
6 For applications involving the taking or interfering with water under the Water Act, the development application may be made at the same
time as the request for resource entitlement, and the Department of Natural Resources and Water will accept the application as properly made.
° For State-controlled roads, a resource entitlement is not required for an activity that is exempt ancillary works or encroachment (identified by
gazette notice under the Transport Infrastructure Act 1994, section 50), or if the activity requires referrat to the Department of Main Roads.
° Evidence may be required from more than one Department responsible for a State-owned resource, €.9. from the Environmental Protection
Agency for quarry materia! below high water mark, and the Department of Natural Resources and Water in relation to the State-owned land
O above high water mark.
Owner's consent
. Section 3.2.1(3) of the IPA prescribes that an application must contain, or be supported by, the written consent of the land owner/s, if the
application involves: a material change of use; reconfiguration of a lot; work on land below high-water mark and not within a canal as defined
under the Coastal Protection and Management Act 1995, or work on rail corridor land defined under the Transport Infrastructure Act 1994.
° Evidence of this consent may need to be provided before the application will be accepted as properly made by the Assessment Manager, during
the processes of the application or in the event of an appeal about the outcome of the application.
° ‘Owner for the purpose of a lodging an IDAS development application means the person at the time of lodging the application, entitled to
receive the rent for the land (or would be entitled to receive the rent for it if it were let to a tenant at a rent).
° Templetes ere available from the |PA website for the provision of owner's consent as an attachment to this form. However other documentation
may be used for providing owner's consent provided it is clear the documentation relates to the development application for the premises.
° Owner's consent, if required, must be provided even if the applicant is the owner. Owner's consent is not required for a mobile and temporary
ERA.Section 7
INTEGRATED PLANNING ACT 1997 Part A, Version 3.1, 3 March 2008
Portable Long Service Leave (PLSL) Levy
. The Building and Construction Industry Portable Long Service Leave Scheme provides tong service leave entitlements to workers in the building
and construction industry who would be unlikely to accrue enough service with one employer to qualify for long service leave. To fund the
scheme, a Portable Long Service Leave Levy {PLSL levy) is collected on certain building and construction work carried out inQueensland.
. The PLSL fevy amount and other prescribed percentages and rates for calcutating the levy are stated in the Building and Construction Industry
(Portable Long Service Leave} Regulation 2002. Included in the amount collected by QLeave is the Workplace Health and Safety Fee and the
Building and Construction IndustryTrainingLevy.
° The Building and Construction Industry (Portable Long Service Leave) Act 1991 (PLSL Act) defines the building and construction work subject to
the PLSL levy and includes renovating, relocating, constructing, altering, demolishing, maintaining or repairing buildings, pools, roads, jetties,
pipelines, fences or earthworks, and works for subdividing, irrigating or draining tand.
° The PLSL levy need not be paid when the application is made, but the PLSL Act requires the levy to be paid before a development permit may
° The Assessment Manager must sight an approved form issued by QLeave advising of the status of the payment of the PLSL fevy. Building and
be issued.
Construction Industry Notification and Payment Forms are available from anyQueenslandpost office or agency, on request from QLeave, or can
be completed on the QLeave website at www.gleave.ald gov.au. For further information contact QLeave (Tet. 1800 803 481 Web:
www, qleave,qid.gov.au )Section 8
INTEGRATED PLANNING ACT 1997 Part E, Version 3.2
XX % Form 1 Development Application Tercls
Cs) ¢
Part E [Yeo a
ance’ ED Ne
Building &/or operational works assessable ef AC we qn i
pope . be.
against a planning scheme! et ah fp
GU? gounlel Ln,
4. Nature of work that requires assessment against a planning scheme:
[_] Building work - Complete Table A (X] Operational work - Complete Table B
Table B
@ (i) What is the nature of the operational work?
[_] Roadworks [_] Stormwater ([] Water infrastructure [-] Sewerage infrastructure
{"] Landscaping {[] Earthworks {_] Drainage Works [[] Signage
[L] Clearing vegetation under the planning scheme Other - Specify below
Timber Jetty
(ii) What type of approval is being sought? (NOTE: if you have indicated multiple operational works in question (i) above and your answers to this
question would be different for different operational work, it may be more appropriate to provide these details in an atiachment to this form)
§X] Development Permit [_] Preliminary approval [-] Both (Specify below)
(iii) Is the operational work necessary to facilitate the creation of new lots (ie. subdivision)?
Bq No [| Yes - Specify the number of lots being created
(Iv) Are there any current approvals associated with this application? (e.g. Development Permit or Preliminary Approval for MCU or reconfiguring
a tot}
[XJNo [_] Yes - Complete Table B(a)
2. What is the dollar value of this operational work? (ie. the total vaiue including GST, materials and labour) |$ 15000
3. Confirm that the following mandatory information accompanies this application
= Contemation off. [em ee cog eee
Plans, andspeofctons if applicable, showing the nature and location of the proposed WOTKS (including the Confirmed
I
OFFICE USE ONLY
Date Received Reterncenumbors [Td
Advice for completing Part E
General advice
* Part A must atso be completed far ail IDAS devetopment applications.
js The applicant is responsible for answering all questions fully and correctly, unless following a response there is a statement to go directly (0 another question.Section 9
- ‘
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
XS EormpimevelopmenttApplication ik
ye ELey
Z IDAS aS
wy, -
ay RECEIVED
a ~~
Assessment Checklist, 10.
= sont - Tewantin
Front Couater £4
am LA
ope ge an | tte ceo ee TLS pon
PuS Oey ape np, @ oethere te ths aptarenat ty ter tes rh tap hat. poe hem tl the * Ck e Piqan sp Act
Hoy Pah Pome Ve a fe ag et ios Post
Post (Cea 2 Lol Ferm t mar bo oon cliet df fer ae fore Thin ccmtet eth: Poa fmt dep wis en
dies neta of dh apple en
Form 1 cso dese t th WSS A sentne ot Ce widist .iutle . Guechio cosuta th, TRA St ta ain eine ech. ttt
O raatrerss, ond the Po at Forin Tretes, 1 te Ur app. then,
ep enep cape et aegis art th AS emt Gite a oe tt rae Fiche fey, pcust bet
corp td ier et 6. is jattt cpp! ions eke pi dieses proposed on and in verbo dovcopis het. orftt bu. ding rork
RL Tapasnta mop ae th. Bb Sra cat MEP SY
For aes, Suet laab thot ooo apt Rape eam OF Pic arn wih Caen ma re et get he
Foe tte thie haat i hapa pe"s: adie refer to Pott Bad th. DAS Ayo. Son Pam
Answering the following questions will assist you in determining which sections of the checklist must be completed for your application. If
unsure, phone or visit your local government or log onto the DIP website www dip.ald gov.au for help
For all IDAS development applications (except those for buitding work Tequiring assessment against the Building Act 1975 only) - complete Section 7 of this
checklist
Does the application seek approval to make a material change of use of the premises? ClYes |p3No
ifyes - complete Section 2 of this checklist
Does the application seek approval to reconfigure a tot?
__ |ifyes - complete Section 3 of this checklist and Part F of IDAS Application Form 1. If the premises are completely within a single |) Yes |BXJNo
local government area assessment is by the focal government.
Does the application seek approval to carry out operational work? Bay
if yes - complete Section 4 of this checklist es
O Does the application seek approval to carry out building work requiring assessment against the Fisheries Act 1994? Yes |BgNo
if yes - complete Section $ of this checklist
Have you received a referral agency response under section 3.3.2.0f the IPA, in relation to this development application?
ifyes - complete Section 6 of this checklist (Yes |KINo
Does the application seek approval to carry out building work requiring assessment against a local government planning
scheme? Yes |[]No
if yes - complete Form 1 Part E of IDAS Application Form 1. Assessment is by the local government.
Does the application seek approval to carry out building work requiring assessment against the Building Act 1975?
if yes - go to Appendix 1 of this checklist for advice on building referrals. Complete Part B of DAS Application Form 1. CYes |KJNo
Assessment is by a building certifier
Do you wish the application fo be assessed against a superseded planning scheme?
if yes - complete Form 1 Attachment 1 [Yes |[JNo
Is the application for development completely or partly on Cairns and Mackay airport land under the Airport Assets
(Restructuring and Disposal) Act 2008?
if yes - Assessment is by the Department of infrastructure and Planning. Complete Form 1 Part D of DAS Application Form 1 if the [Yes |KNo
application is for a material change of use, and Part E if for building or operational work. Also, the application must be referred to the
local government as Advice Agency.Section 10
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklrst, Version 22
, : Tecton | tustoe completed for al apchications tnat require oommeton of ine (GAS Assessme™ Speceat
I eee
ke } we _ _ |
1.1A Is any part of the proposal intended to be carried out on a Queensland heritage place under the Queensland Heritage Act 1992?
No-Goto178 (_] Yes
a ep ee ed Pe +
1.1B Does the proposal involve development intended to be carried out on a place entered in a local heritage register under part 11 of
the Queensland Heritage Act 1992, other than if the place is on Cairns or Mackay airport land?
XJ No-Gotoqi2 [_] Yes
Bea drt tp ET Rabe sen 2A TER guide ae Sehadat pert 2 lapki MF
ber Ye Fe oO Tm wrens nee eae
ome - rr e-em rr eS - s | Pr kre ee ES ee EE EE TE ES = ve eee
1.2 Does the proposal involve removing quarry material from a watercourse or lake as defined under the Water Act 2000?
[X] No-Gotoar3 [_] Yes
'PA schedule 8 part 1, lehve 5 tem 1 IP Reguiatian, schedule 2 tabie 2. tem 11 IP Roguiaton schedule 7. tate 5, tem 2 (wid river ote aj, Water Act 2990,
e section BBL; Wild Rivers Act 2005, section 44A
pe mare eee ane ee me ae mei ne ea nme memes ae ee RTE ee a em
Rover bteear ORE RNAI Suge lakh Wee Ran "
- ew ee re rere ee LE RE Te TS * Ls ee -
1.3 Does the proposal involve an environmentally relevant activity (ERA), other than a mining activity or a petroleum activity?
[XJ No-Gowoar4 [_] Yes
IPA weheduie sd gant i tabs 2 cee TPA scnadey tpt taj & Doms Pend 472 Regu! tea sotertde 2 taped (eats Vand 72 Envi sth Dre chen Bet TM ay chan
IAA fe deer oe Ad owers Act ZUPA, seria 4440 relee ante: Sy tive dectaranen Wud Rivers Doge
Rape ee TET AREER ” , “ a
1.4 ts any part of the premises within the limits of a port under the Transport Infrastructure Act 1994?
{X] No - Got0.Q15
[_] Yes
IP Reguleton, schedule 2, table 2, tems 14 and 16
Ligsieg Ten wae * cae ra em
cea rem a ve A a a ET me i
15 Does any part of the premises adjoin a declared fish habitat area under the Fisheries Act 1994?
[XJ No - Goto 076
@ CI Yes - if answers to questions in other sections of this checklist indicate that the proposed development is assessable under IPA, schedule
8, this application requires assessment by the Department of Primary Industries and Fisheries (DPI&F). if DPI&F is not the
Assessment Manager for the application, the agency has jurisdiction as Advice Agency.
iP Reguistion, schedulz 2, table 2, tem 26
he Oo bee ER Ll , poms mem ee eee '
16 {s any part of the premises designated for community infrastructure?
No - Go to Q1.7
(1 Yes
IP Requiaton, schedur 2. table 3, tem 7
Fees ee ER a , . 7 soe
17 Does the proposal involve the establishment or expansion of a waste water disposal system?
[X] No - End of Section 1 L] Yes
IP Reguiiter, Sheds 7. tela 2 dem fSection 11
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checkiist, Version 22
PA GST . . : 4
41 Is the proposed operational work assessable under any State planning regulatory provisions?
{J No [] Yes
If no, is the proposed operational work assessable under the planning scheme?
[LJ No - Goto 04.2 EX] Yes - Complete Form 1, Part £ and answer 04.1 1 - 4.1.7 below
rATCCCNTRG ORGAO ; TF
4.14 Isany part of the premises located in part of a future State-controlled road, or within 100m of a State-controlled road?
INo [] Yes
If no, is the proposed operational work for filling or excavating listed in Integrated Planning Regulation 1998,
schedule 5 and does it exceed the threshold?
No - Goto Q4.1.2
Cc Yes - This application must be referred to the Department of Main Roads (DMR) as Concurrence Agency.
IP Reyiot on, sched. 2. table 3, tem 3 IP Regisston schedule 2, table 3 tem T{b)
ee A RS RR RTS I AS, peering
® WOT OTE SES
prow St a tt LT TTT IS
4.1.2 \sany of the operational work proposed in a local government area listed*" in State Planning Policy 2/02: Planning and Managing
Development Involving Acid Sulfate Soils
K] No -Gotoa4.1.3 (| Yes
4.1 aurukun, Bowen, Brisbane, Broadsound, Bundaberg, Burdekin, Burke, Bumett, Cabooture, Cains, Calliope, Caloundra, Cardwell, Carpentaria, Cook, Cooloola, Douglas,
Fitzroy, Gladstone, Gold Coast, Hervey Bay, Hinchinbrook, Iss, Johnstone, Livingstone, Logan, Mackay, Maroochy, Maryborough, Mirium Vale, Momington, Noosa, Pine Rivers,
Reddiiffe, Redand, Rockhampton, Sanna, Thunngowa, Tiaro, Torres, Townsville, Whitsunday
IP Reguiation, scheduie 2, table 3. lem 4: Slate Planning Policy 292° Planing and Managing Development inveiing Acid Sutate Sails sectar 36
a = A AT STR pg EL lt A A NS I mee
EASES TISiS AP; SUBS 14 TOMS }
ee eR ee EE RIF mT I TOA TY
413 Is any of the proposed operational work for filling or excavation?
No -GotoQ4.1.4
[_] Yes
IP Reguiation, schedule 2, tob’e 3 item 10{a). [P Reguiztion, schedute 2 table 3. dem 10{d}
4.1.4 \s any part of the premises subject to an easement in favour of the holder of Pipeline Licence Number 1 issued under the
Petroleum Act 1923 for the construction or operation of the Moonie to Brisbane strategic pipeline under that Act?
®@ Dx] No -Gotoa4.15 [_] Yes
IP Regutaton schedule 2, table 3, tem 17
Pay, PATI RAR OOK: . Te - ~
Bn tte, RNR RA RN ARTS > pm RE a
4.1.5 Is any of the proposed operational work fisted in schedule 13C of the integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No-Gotoa4.16 [_) Yes - This application must be referred to QueenslandTransport (QT) as Concurrence Agency.
IP Regulation, schedule 2. tabie 3, tem 14
Read vst shabi ad a OEP RELY . | _ os
Da TTI | * EL
41.6 Is any of the proposed operational work listed in schedule 13D of the Integrated Planning Regulation 1998 and does it exceed the
specified threshold?
No-Goto04.1.2 — [_] Yes - This application must be referred to QueensiandTranspont (QT) as Concurrence Agency.
IP Reguiztion schedule 2, table 3 fem 15
Rost TRE Re Od) ap a, SEG Ib, mnt » — ee ee
417 |sany part of the premises in a koala conservation area or koala sustainability area, other than in an SEQ urban footprint area?
BX] No -Gotoas2 (_] Yes
IP Requiztar, scheduie 2 table 3 tem 9Section 12
INTEGRATED PLANN'NG ACT 1997 IDAS Assesment Check Veru:or: 22
SEILD RIVER AREA - fthoug: eg tater proves So" assessment nt ggerataral wore ¢ (gr ree dental com meron! acd inch cine
qs contog st for he Gurbouss ofthe Aid kive’s ca HIS Cuirrenthy 10 decal avons for any One ANG PVE! 2veas apply (Phe Wad issis
Loce te naliyse Of Te opme
JASSOCIATED WITH RECONFIGURING A LOT: RESIDENTIAL, COMMERCIAL OR INDUSTRIAL DEVELOPMENT IN A WILD RIVER
eRe
42 Is any of the proposed operational work associated with reconfiguring a lot and the reconfiguration is also assessable?
Bq No -cotoas3s [(] Yes
: . - o O. e . ~ : a : . ‘. a RE ’ tH Te or Ge ol og eto
OAL A CONSERVATION (Inside SEQ urban footprint)
43A ts any part of the premises in an interim koala habitat protection area?
Gx] No -Gotoa43B [_] Yes
e wif CE J ATION CLEARING: KOALA CONSERVATION, WILD RIVER AREA
4.3B ls any of the proposed operational work for the clearing of native vegetation to which the Vegetation Management Act 1999
applies?
X] No Gowass (_] Yes
A cehortie a gi Ob a co TAG PP Requldl 0 sched 2 fab ea Wade goa vem (PR ey. oe sete se bos Soto agen,
wonets ce ea, oe wed pir. don gh pe og De ep Ue Brees at Aer TGs ao on BoA Log fate
coy liga ess rat ALT Rovers Arr AY) specks 21F 1d 434
FAKING OR INTERFERING WITH WATER: Wil D RIVER AREA
4.4 Is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with water from a watercourse, lake or spring (other than using a water truck to pump water; and other than under
the Water Act 2000, section 20(2), (3) or (5)), or from a dam constructed on a watercourse or lake?
[XJ No -Gotoass [[] Yes - Answer (a) and (b) below
neo, . oa Goce te We, iow ft ¢ aOR. wot 7 4 nr Ltrs eo
45 Is any of the proposed operational work for any thing constructed or instalted that allows, under the Water Act 2000, for taking or
interfering with artesian water (other than using a water truck fo pump water)?
@ i No Goto Q4.6 C] Yes - (Complete Form 1, Part K,) This apptication requires assessment by the Department of Netural Resources and Water
(NRW). If NRW is not the Assessment Manager for the appl:casion, the agency has jurisd.ction as Concurrence Agency
Pa lin oat ot at Re 4 Re Do ete Ot 82. FP Rey toe Cpt eng 0?
BR CN ade RST Were 0 5 ee Prin IRS PRG Sate EX GARG G SNe cog ne OPE woo
46 is any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking
overland flow water (other than using a water truck to pump water)?
[X] No Gotoas7 [_] Yes - Answer (a) and (b) below
4? \s any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000, for taking or
interfering with subartesian water (other than using a water truck to pump water)?
[X] No -Gotoass [_] Yes
Bee a te CU etc gt pte RLS Ra, Kahlo wt uiek pri tube # ema
Wt At he by Rt tt noms be, ‘ ee pet
Tbe. ee her Ot mye ae Toe regia it oh Mb es
48 Does any of the proposed operational work for any thing constructed or installed that allows, under the Water Act 2000. for
interfering with overland flow water (other than using a water truck to pump water)?
XJ No - Goto.as9 [] Yes - Answer both (a) and (b) below
if a elo a 1 ot wot. . A ” e : . : . mLSection 13
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
49 {s the proposed operational work for the following?
(i) For the construction of a referable dam as defined under the Water Supply (Safety and Reliability) bh No [) Yes
Act 2008
(ii) To increase the storage capacity of a referable dam by more than 10% & No [) Yes
If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks} This application requires assessment by the Department of Natutal Resources and
Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
Concurrence Agency.
IPA, schedule 9. part 1, table 4, item 4; IP Regulation, schedule 2, table 2, tem 10
4.10 is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
Da No -Gotoas.1t [_] Yes - Answer (a) and (b) below
IPA, schedule 8, part 7, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17, IP Regulation, schedule 1, part 3, table 4, items 4A and 5
Coastal Protection and Management Act 1995, section 104A (wild river area)
COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA... ea Ra ne |
4.14 is any of the operational work proposed to be carried out within a coastal management district?
@ DX] No -Gotoas12 (_] Yes
IPA, schedule 8, part 1, table 4, lem 5, IP Regulation, schedule 2, table 2. items 12 and 14; JP Reguiation, schedule 1, part 3, table 4, items 4A and §
Coastal Protection and Management Act 1995 Act 1995. section 104A (vald river area); Wild Rivers Act 2005, section 43A
WATERWAY BARRIER WORKS; WILD R MER AREAS 8°: ose: a oh pe et ss wig ie ed
412 \s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
(KI No -cotoas13 [] Yes
IPA, schedute 8, part 1, lable 4, item 6: IPA, schedule 8, part 2, table 4, tem 2; Fishenes Regudation 1995 $1134 (self assessable codes); I? Regulation, schedule 2, table 2, tem 28; 1P
Reguiion, schedule 1, part 3, table 4, tem &: Fisheries Act 1904, sectian 76D (vakt over aren), Wik Rivers Act 2005, sechon 43A,
DECLARED FISH ABITREAREA, WILD RIVER'AREA if ee ee ee ed
4.13 ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
Fisheries Act 19947
[XI No - Goto 04.14
[Yes
IPA, schedule 8, part 1, table 4, item 7; JPA, schedule 8, part 2 table 4, item 3; Fisheries Regefation 1995 s113A (selt-assessable codes): IP Reguiation schedule 2, fable 2, item 25; IP
Reguiation, schedule 1, par 3, table 4, item 7; Wild Rivers Act 2005, sections 4A; Fisheries Act section 760 (wild river area}.
e REMOUAE DESTRUCTION OR DAMAGE OF A MARINE PLANT: WILD. RIVER ARER Ogi om wernt gle gee SR
4.14 {s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
{XJ No -Gotoas15s [_] Yes
IPA, schedule 8, part 1, table 4, item 8; (PA, schodule 8, part 2. tahle 4, tem 4; Fisheries Reguiauion 1995 sTI3A (selt-assessable codes}: {P Regulation, schedule 2, table 2. tem 29; IP
Regulation, schedule 1, part J, iable 4 jem 8; Fisheries Act 1994, section 76DB (vald river area); Wilt Rivers Act 2005, Section 43A; relevant wild iver declaration: Wid Rivers Core
WED RUERAGER ge ne se ig er
. 415 is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
No -Gatoa4.i6 {_] Yes
IPA, schedule 8, part 1, table 4, item 10; IP Regutation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 434
4.16 Is any part of the premises located in part of a future State-controtled road, or within 100m of a State-controlled road?
No -Endofsection4 (_] Yes
IP Regulalion, schedule 2, table 2, item 3Section 14
wo . 2
INTEGRATED PLANNING ACT 1997 IDAS Assessment Checklist, Version 22
While the Department of Infrastructure and Planning (DIP) believes that this information contained on this form and provided as part of
Disclaimer:
this process will be of assistance to you, it is provided on the basis that you will not rely on the information without first making your own
enquiries regarding the interpretation and application of the applicable legislation to your circumstances.
To the full extent permitted by law DIP expressly disclaims all liability (including but not limited to iability for negligence) for errors or
omissions of any kind or for any loss (including direct and indirect losses), damage or other consequence which may arise from your
reliance on this process and the information contained on this form.Section 15
JSunshine Coast AND USE SECTION FEES ) |
Regional Council
RECEIPT TYPE
SALE OF DOCUMENTS
Superseded Planning Scheme Documentation 520
Copy of Permit/Approval Letter 110
The Noosa Plan Documentation = 111
APPLICATION FEES
Material Change of Use - Code/Impact _~ mo
Consistent §21 . a
Inconsistent 521 : an
Assessment under Superseded Planning Scheme mo 521 .
Modification to a Development Permit 21
Extension of a Currency Period. 521
oy Operational Works - Landscaping §21
6 Bldg Work assessable against the Planning Scheme. Oo . : §21
PRE LODGEMENT REVIEW
Half Hour 522 .
. One Hour §22
ADVERTISING oe
oe, Purchase Advertised Applications §23
JETTIES -
Jetty Application Fee - [370 524. .
Jetty Bond © _ Soom. 51 .
oe "(Category 4)
BONDS
’ ° Performance Bond . 51
(Category 9).
SIGNS y . .
Registration Fee ' . 222
cu FEE oo.
Search of Land Use Section file. 112
- _ Liquor Licensing Request so. . 113
. a | TOTAL $ JE7O_ |
NAME: Og-It [la Kanwsson , ,
ADDRESS: _ Re Bm. 39S
: TE WwAwW A USED _ : |
FILE NO: OF EI? 3 -- DATE: ,t(efeg
RECEIPT NO: % \O Signature of TP Officer: 75 Qurecre,
- AUTHORITY NO: | _ 0 _
: Pre perha 1S Sarttsatin Ano .
| a - [res / 770/) |Section 16
CALCULATION OF FEES .
APPLICATION FEE TOTAL
. FEES
MCU - CODE ASSESSMENT
Details of Development —
Consistent 1.0
. Inconsistent 3.0 ,
FEE CALCULATION |
MCU - IMPACT ASSESSMENT | ©
Details of Development
Consistent 1.0 .
Inconsistent 3.0
FEE CALCULATION
[OPERATIONAL WORKS
Details of Development
FEE CALCULATION ®
TOTAL FEES a St
. . . tSection 17
— Oe - ee | eeeeeees—sn _ MAXIMUM RECORDED FLOOD LEVEL RL 2.00 AHD ee ee Ce Cg
TOP OF WALL TOP OF WALL PT
TO ONE SIDE (Mina)
DECK RL 1.0 AHD mre AHD DECK
RL1.0 AND —_ —-____ _ aoa ey : RL 1.0 AHD
Sy
in x SAS : |
aN
MINIMUM WATER RL 0.44 AHD
— eee eC
WR
STONE PIT CHING |
S CRA ROO | i
¢ Lect Yi MY
<I Ap
Le
CRE. 4, “
ACS
! | SALTWATER AVENUE Uw | |
ELEVATION 1 | |i Po Ut |"
1.50 1 ELEVATION 2 Ud
CONCRETE RETAINING WALL 1600 OVERALL NOTE: DO MOT FIX 150 J
JETTY TO WALL
PILES:
PROPERTY BOUNDARY || ALL PILES SHALL BE APPROVED HARDWOOD
AND TREATED TO HAZARD 6.
ALL PILES SHALL BE INSTALLED IN ACCORDANCE
Hh WITH AS 2159 - PILING CODE PILEAT PTY LTD
LOT 877 NOOSA JETTY
| PILES TO BE CLEAR OF STONE 7a m2 BUILDERS
PITCHING AND ASSOCIATED
GEOTEXILE FABRIC § iho Licence No 723720
®
~ Ep AGN 56 Oat 038 738
§'= PO Box 290 Prdmex 07 54743480
Nooesviles Monge 0406 137625
Cad 4566 0417 740644
O & J HAKANSSON
le DECKING: PROPOSED JETTY
LOT 877
38 x 125 F14 HWD
FIXED TO BEARERS (No.15)
WITH TWO STAINLESS
STEEL SCREWS EACH END SALTWATER AVENUE
bs PILES: fan NOOSA WATERS
+25 © 200 MIN TREATED av J RABRING PTY LTD T/A
1500 John Norden
HWD POLES [OA | & Associates
\y 45045 a IN ACN 010 263 877
a W9T2T ar oe —491°863 Swucase / Civ Design Engmeoera
| REAL PROPERTY A Suite 16 "Tewarntn Plaza”
Pomnasna Avenus / PO Bax 206
PROPOSED Tewaran Q
DESCRIPTION
Hp 200 x7 4 JETTY LOT 877 Ptr 07 54407137 Fax O07 64407172
SP102594
PARISH WEYBA
COUNTY MARCH
FRAMING 4100 OVERALL Stig | 4100 O/A 1 SITE PLAN ef
LAYOUT 1-200 ~ WORKING DRG
150Section 18
126 x 38 HWO anf NOTES:
SCREWED TO GEARERS 160 x 76 HWD
16 SS
1. UNLESS NOTED OTHERWISE ALL TIMBER SHALL BE
DURABILITY CLASS 1 OF APPROVED SPECIES AND HAVE
A STRESS GRADE OF F14 MIN.
76 x 36 HWO 2 200 HG MARINE
1/78 x 014 TYPE 17 NOTE THAT Avi POLES TO COMPLY
\/ STAINLESS WITH AS 2150 - PLUNG 200 x 76 HWD 2. UNLESS NOTED OTHERWISE ALL CONSTRUCTION SHALL
SCREWS @ 450 CRS COMPLY WITH THE ENVIRONMENTAL PROTECTION AGENCYS'
OPERATIONAL POLICY - "BUILDING AND ENGINEERING
STANDARDS FOR TIDAL WORKS.”
© 200 16 MARINE
NOTE THAT Aid POLES TO COMPLY 3. ALL STAINLESS STEEL BOLTS, RODS, ETC., SHALL BE
160 x 75 HwWD WITH AS 2156 - PLUNG APPROVED MARINE GRADE 316. ALL OTHER STEELWORK
FIX TO EACH
WITH 24416 54S BOLT DETAIL fA \ INCLUDING NUTS, BOLTS, WASHERS, SCREWS, NAILS, ETC.,
SHALL BE HOT DIPPED GALVANISED OR STAINLESS STEEL.
4. TOP OF PILES SHALL BE SEALED AND FULLY CAP FLASHED
OR RINGED.
5. DIMENSIONS AND LEVELS SHALL NOT BE SCALED FROM
SECTION’ A \ THE DRAWINGS.
—————150 x 75 HWD
10 PL ANGLE BRACKET
20416 SS TO EACH MEMBER
PILE-T PTY LTD
' 200 x 75 HWD NOOSA JETTY
BUILDERS
lucence Mo 723720
DETAIL (2 ABN 55 Oew 036 736
PO Box 238 PiFax 07 64743480
Novsavite beogee 0006 137626
O&JH 0417 7ag8e4
AKANSSON
PROPOSED JETTY
LOT 877
(No.15)
150 x 75 HwD SALTWATER AVENUE
NOOSA WATERS
JETTY USE: Sez
SINGLE USER, PRIVATE 2M16 SS J RABRINK PTY LTD T/A
John Norden
NO VEHICULAR ACCESS & Associates
150 x 75 HWO ——__ =
ACH 010 263 877
DESIGN LIVE LOAD. 20 A Seructuras / Citi Demign Engineers
Suite 16 Tewenan Place”
Avenue / PO Bax 206
Towanan Q 4565
Ph o7 50407137 Fax 07 64407172
BERTHING VELOCITY 05 mises, DETAIL (3 \
WORKING DRG
~” 09/81-2Used in these records
001AD296.001.pdfRelated documentPublic source context ↗
09/0730 - Operational Works - (Jetty) [As Published]Related documentApplication case desk ↗
About this file
- File size
- 1.1 MB (small file)
- File type
No other editions are linked here.