Skip to the record
Search everything, all in one place.

Council archive · source document

001AD296.001

of 18

Text shows just the words. Original shows the document exactly as it was published.

Check the original when the exact wording matters.

Text sections not matched to the original PDF pages. See original document to check page numbers.

INTEGRATED PLANNING ACT 1997                                                                                           IDAS Assessment Checklist, Version 22
        49         {s the proposed operational work for the following?
                     (i)    For the construction of a referable dam as defined under the Water Supply (Safety and Reliability)                 bh  No    [) Yes
                            Act 2008
                     (ii)   To increase the storage capacity of a referable dam by more than 10%                                              & No       [) Yes
                     If yes to either or both (i) or (ii) above - (Complete Form 1, Part Ks} This application requires assessment by the Department of Natutal Resources and
                                                                 Water (NRW). If NRW is not the Assessment Manager for the application, the agency has jurisdiction as
                                                                 Concurrence Agency.
                     IPA, schedule 9. part 1, table 4, item 4; IP Regulation, schedule 2, table 2, tem 10

         4.10       is any of the proposed operational work tidal work, other than excluded work defined under the IPA?
                     Da No -Gotoas.1t        [_] Yes - Answer (a) and (b) below
                     IPA, schedule 8, part 7, table 4, item 5; IP Regulation, schedule 2, table 2, items 12, 14 and 17, IP Regulation, schedule 1, part 3, table 4, items 4A and 5
                     Coastal Protection and Management Act 1995, section 104A (wild river area)
         COASTAL MANAGEMENT DISTRICT; WILD RIVER AREA...                                               ea Ra ne                                                    |
         4.14       is any of the operational work proposed to be carried out within a coastal management district?
@                     DX] No -Gotoas12       (_] Yes
                      IPA, schedule 8, part 1, table 4, lem 5, IP Regulation, schedule 2, table 2. items 12 and 14; JP Reguiation, schedule 1, part 3, table 4, items 4A and §
                      Coastal Protection and Management Act 1995 Act 1995. section 104A (vald river area); Wild Rivers Act 2005, section 43A
         WATERWAY BARRIER            WORKS; WILD R MER AREAS               8°:      ose: a            oh pe     et           ss wig                ie        ed
          412        \s any of the proposed operational work for constructing or raising waterway barrier works under the Fisheries Act 1994?
                       (KI No -cotoas13        [] Yes
                       IPA, schedute 8, part 1, lable 4, item 6: IPA, schedule 8, part 2, table 4, tem 2; Fishenes Regudation 1995 $1134 (self assessable codes); I? Regulation, schedule 2, table 2, tem 28; 1P
                       Reguiion, schedule 1, part 3, table 4, tem &: Fisheries Act 1904, sectian 76D (vakt over aren), Wik Rivers Act 2005, sechon 43A,
          DECLARED FISH ABITREAREA, WILD RIVER'AREA if ee                                                   ee ee                                            ed
          4.13       ls any of the operational work proposed to be carried out completely or partly within a declared fish habitat area under the
                      Fisheries Act 19947
                      [XI No - Goto 04.14
                      [Yes
                       IPA, schedule 8, part 1, table 4, item 7; JPA, schedule 8, part 2 table 4, item 3; Fisheries Regefation 1995 s113A (selt-assessable codes): IP Reguiation schedule 2, fable 2, item 25; IP
                       Reguiation, schedule 1, par 3, table 4, item 7; Wild Rivers Act 2005, sections 4A; Fisheries Act section 760 (wild river area}.
e         REMOUAE DESTRUCTION OR DAMAGE OF A MARINE PLANT: WILD. RIVER ARER Ogi om wernt gle gee SR
           4.14       {s any of the proposed operational work removing, destroying or damaging marine plants under the Fisheries Act 1994?
                        {XJ No -Gotoas15s       [_] Yes
                        IPA, schedule 8, part 1, table 4, item 8; (PA, schodule 8, part 2. tahle 4, tem 4; Fisheries Reguiauion 1995 sTI3A (selt-assessable codes}: {P Regulation, schedule 2, table 2. tem 29; IP
                        Regulation, schedule 1, part J, iable 4 jem 8; Fisheries Act 1994, section 76DB (vald river area); Wilt Rivers Act 2005, Section 43A; relevant wild iver declaration: Wid Rivers Core
           WED RUERAGER                 ge ne                                                                                                se ig        er
   .        415        is any of the operational work proposed to be carried out in a wild river area declared under the Wild River Act 2005?
                             No -Gatoa4.i6       {_] Yes
                        IPA, schedule 8, part 1, table 4, item 10; IP Regutation, schedule 2, table 2, item 37; Wild Rivers Act 2005, sections 42, 434
            4.16       Is any part of the premises located in part of a future State-controtled road, or within 100m of a State-controlled road?
                              No -Endofsection4      (_] Yes
                         IP Regulalion, schedule 2, table 2, item 3

Used in these records

About this file

File size
1.1 MB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

001AD296.001.pdf · 1.1 MB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.