Council archive · source document
20200903OBA_R1_Loading_Dock_Operational_Conditions · OPW20/0145
Noosa Civic Shopping Centre Loading dock barrier (1000mm) Residential barrier (1800mm) Loading dock Lmax 101 dB(A) SWL ‘Compactor Lmax 100 dB(A) SWL Level 2 7.8m above building pad level Prepared by: 08 Date: 28/07/2020 Noise Level Signs and symbols Line source Lax aS mm - «4 iain builcing © Dy man outone wal acousTe Figure 6- SoundPLAN™ Day Time Modelling of All Loading Docks and Compactor — Level 2 I\Mobs\2019\20191414\20191414.2\202009030BA_R4_Noise_Impact_Assessment.docx 15
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20200903OBA_R1_Loading_Dock_Operational_Conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.