Council archive · source document
20200903OBA_R1_Loading_Dock_Operational_Conditions · OPW20/0145
TABLE OF CONTENTS INTRODUCTION. ............csccsscssccssssssssssssssssssesssscsssssssssssssssssesssecssssssssessesssessssseesoessessessonssees 4 SITE DESCRIPTION... NOISE TARGETS NOISE MEASUREMENTS. 4.1 MEASUREMENT LOCATIONS.. 4.2 MEASURED NOISE LEVELS 4.2.1 Unattended Measurements Results 4.2.2 Attended Measurement Results... 5 NOISE SOURCES/IMPACTS...... 5.1 LOADING DOCKS.... 5.1.1 Trolley Collection 5.1.2 Delivery Trucks. 5.1.3 Mechanical Plant 5.1.4 Compactor. 5.2 NOISE CALCULATION... 6 RECOMMENDATIONS 6.1 MANAGEMENT CONTROLS .... 6.2 ACOUSTIC BARRIER. 6.3. RESIDENTIAL BUILDINGS FACADE CONSTRUCTION 6.4 MECHANICAL PLANT NOISE LEVELS o 7 CONCLUSION... cee ceccssceesssscsessscssssscsssssesssscsessssssssssssssssssssscsssssscssssssssessessessosssssossoess RhWN = I\Mobs\2019\20191414\20191414.2\202009030BA_R4_Noise_Impact_Assessment.docx 3
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
20200903OBA_R1_Loading_Dock_Operational_Conditions.pdfRelated documentApplication case desk ↗
About this file
- File size
- 5.9 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.