Town Planning Report


Development Application for a Material Change of Use - Multiple Dwelling
(3 Units)




31 Tewantin Road, Cooroy
Lot 106 on C5604



Prepared for
Fastwin Investments Pty Ltd



November 2022 | Ref: 220219




  ASTP Ref: 220219                                                   Page 1 of 16
Log in to download the original file

ASTP_TP_Report.pdf · 764 KB (small file)

Full text of the other 15 pages

Page 2

Applicant Details
The applicant for the subject development application is Fastwin Investments Pty Ltd. It is requested that all
project correspondence is provided to Fastwin Investments Pty Ltd, care of ADAMS + SPARKES.


Contact Details and Project Team
 Specialty Field                     Company                              Contact Person
 Town Planning                       ADAMS + SPARKES                      Cameron Adams
 (Project Manager)                                                        [email protected]

 Building Design                     Ausmar Homes                         Marc Wood
                                                                          [email protected]


Document Control and Verification
This Town Planning Report has been prepared and reviewed by the identified key personnel, in accordance with
the requirements of the Planning Act 2016.

ADAMS + SPARKES is led by Directors Cameron Adams and Pete Sparkes, who have a combined experience of
over 30 years in both public and private sectors. ADAMS + SPARKES have extensive experience in the
management of development applications including residential, commercial, retail and mixed-use
developments, industrial projects and mining and infrastructure projects.


 Project Principal                    Project Manager                     Project Reviewer
 Cameron Adams                        Aspen Dunn                          Cameron Adams

 Managing Director                    Town Planner                        Managing Director


Confidentiality
All information contained within this document is provided in strict commercial confidence and is the property
of ADAMS + SPARKES. This document and the information are solely for the use of the authorised recipient and
this document may not be used, copied or reproduced in whole or part for any purpose other than that for which
it was supplied by ADAMS + SPARKES. ADAMS + SPARKES makes no representation, undertakes no duty and
accepts no responsibility to any third party who may use or rely upon this document or the information. This
document is not to be disclosed or reproduced in part or in full, without express written authority from ADAMS
+ SPARKES.

© ADAMS + SPARKES TOWN PLANNING




  ASTP Ref: 220219                                                                                 Page 2 of 16

Page 3

Contents

1      Introduction ..................................................................................................................................... 5

2      Site Details and Characteristics ....................................................................................................... 6
3      Proposed Development ................................................................................................................... 7
    3.1       Pre-lodgement Meeting.......................................................................................................................... 7
    3.2       Proposal Overview .................................................................................................................................. 7
    3.3       Architectural Design and Built Form ....................................................................................................... 9
    3.4       Landscaping .......................................................................................................................................... 10

4      Statutory Framework ..................................................................................................................... 11
    4.1       State Planning Policy............................................................................................................................. 11
    4.2       South East Queensland Regional Plan 2017 ......................................................................................... 11
    4.3       State Interests (State Assessment Referral Agency) ............................................................................. 11

5      Local Planning Instrument – Noosa Plan 2020 .............................................................................. 12
    5.1     Assessment of Development Application ............................................................................................. 12
    5.2     Cooroy Local Plan Code ........................................................................................................................ 12
    5.3     Medium Density Residential Zone Code ............................................................................................... 13
       5.3.1      Acceptable Outcome AO15.2 – Dual garages facing the street .................................................... 13
    5.4     Dual Occupancy and Multiple Dwelling Code ....................................................................................... 13
    5.5     Driveways and Parking Code ................................................................................................................ 14
    5.6     Earthworks Code................................................................................................................................... 14
    5.7     Existing Services Code ........................................................................................................................... 14
    5.8     Fire Services for Common Private Title Code ....................................................................................... 14
    5.9     Landscaping Code ................................................................................................................................. 14
    5.10 Sustainable Building Design Code ......................................................................................................... 14
    5.11 Transport Code ..................................................................................................................................... 14
    5.12 Water Quality and Drainage Code ........................................................................................................ 15
    5.13 Waterways Works Code ....................................................................................................................... 15
    5.14 Waste Management Code .................................................................................................................... 15

6      Conclusion and Recommendations ............................................................................................... 16




    ASTP Ref: 220219                                                                                                                                  Page 3 of 16

Page 4

Tables
Table 1 Site Summary Table ...................................................................................................................................................... 6
Table 2 Development Particulars............................................................................................................................................... 7
Table 3 Setback Compliance ...................................................................................................................................................... 8
Table 4 Statutory Framework Mapping Layers ........................................................................................................................ 11
Table 5 Planning Scheme Particulars ....................................................................................................................................... 12


Figures
Figure 1 Subject Site (Source: QLD Globe 2022) ........................................................................................................................ 6
Figure 2 Site Plan (Source: Ausmar Homes 2022)...................................................................................................................... 8
Figure 3 Olivine Lane Streetscape Perspective – Units 2 & 3 (Source: Ausmar Homes 2022) ................................................... 9
Figure 4 Tewantin Road Streetscape Perspective - Unit 1 (Source: Ausmar Homes 2022) ..................................................... 10




   ASTP Ref: 220219                                                                                                                                              Page 4 of 16

Page 5

1         Introduction
1.        This Town Planning Report has been prepared in support of a Code Assessable Development Application
          for a Material Change of Use to establish Multiple Dwelling (3 units). This documentation has been
          prepared by ADAMS + SPARKES Town Planning (hereafter; ‘ADAMS + SPARKES’) for and on behalf of the
          applicant, Fastwin Investments Pty Ltd, over land at 31 Tewantin Road, Cooroy, legally described as Lot
          106 on C5604.

2.        The local government, which applies to the subject site is the Noosa Shire Council. In accordance with
          Schedule 8 of the Planning Regulation 2017, the Noosa Shire Council is the Assessment Manager of the
          Development Application. The applicable planning scheme is the Noosa Plan 2020 (hereafter ‘the
          planning scheme’). Under the planning scheme the proposed land use is best defined as ‘Multiple
          Dwelling’, which is specifically defined as follows:

              ‘Multiple Dwelling’
              means a residential use of premises involving 3 or more dwellings, whether attached or detached,
              for separate households.

3.        The subject site is located within the Medium Density Residential Zone and the Cooroy Local Plan Area.
          In accordance with Part 5.5.2 - Table of Development Assessment in the Medium Density Residential Zone,
          the Development Application is subject to Code Assessment.

4.        This Town Planning Report will describe the site, the proposed development, and address the relevant
          Town Planning and design issues with respect to the proposal. This report should be read in conjunction
          with the following supporting documentation:

                       Appendix 1   Title Search
                       Appendix 2   Proposal Plans prepared by Ausmar Homes
                       Appendix 3   Medium Density Residential Zone Code Assessment
                       Appendix 4   Dual Occupancy and Multiple Dwelling Code Assessment




     ASTP Ref: 220219                                                                                 Page 5 of 16

Page 6

2         Site Details and Characteristics
5.        Table 1 below, provides a summary of the details applying to the subject site.

          Table 1 Site Summary Table

           Address                           31 Tewantin Road, Cooroy

           Property Description              Lot 106 on C5604

           Current Site Area                 1012m²

           Frontage                          20 metres to Tewantin Road and 20 metres to Olivine Lane

           Local Plan                        Cooroy Local Plan Area

           Zone                              Medium Density Residential Zone

           Tenure                            Freehold

           Registered Landowner/s            Fastwin Investments Pty Ltd (Refer to Appendix 1)

           Easements                         Nil

                                              •    Contains an existing dwelling and shed to be removed to
                                                   establish the proposed development
                                              •    Slopes from Tewantin Road frontage to Olivine Lane frontage
           Notable site features              •    Rectangular in shape
                                              •    Access currently gained from Tewantin Road
                                              •    Adjoins an existing multiple dwelling development to the north-
                                                   east and a Dwelling House to the south-west

                                                            Aerial View




           Figure 1 Subject Site (Source: QLD Globe 2022)




     ASTP Ref: 220219                                                                                    Page 6 of 16

Page 7

3         Proposed Development
3.1       Pre-lodgement Meeting
6.        A Pre-lodgement Meeting was held on 16 August 2022 with Noosa Council’s Town Planning and
          Engineering staff, in which in-principle support was given for the proposal.

7.        Overall, the proposed building design and site layout were supported by Council, inclusive of the
          proposed second driveway crossover to Olivine Lane. Council, however, raised issues with the use of
          particular building materials, including stonewall cladding. As such, these aspects have been removed
          from the building design and replaced with lightweight timber/cladding features that better represent
          the traditional Queensland vernacular and the rural town character of Cooroy. Further, Council sought a
          greater extent of roof overhang (600mm eaves) to be incorporated into the design and emphasised the
          importance of meeting the setback, plot ratio and site coverage outcomes prescribed by the planning
          scheme. The lodged design achieves full compliance in this regard, as clearly demonstrated by the
          Proposal Plans prepared by Ausmar Homes in Appendix 2.

8.        Council also detailed the requirement for frontage works and a 2 metre wide land dedication to Olivine
          Lane. It is proposed to fulfill this obligation, with Civil Engineering drawings for the required roadworks
          to be submitted under a subsequent Operational Works application. Finally, changes to the location of
          the visitor car park have been made in response to Council feedback, in which Council suggested adopting
          the outcome approved for #33 Tewantin Road to the north. This included locating the visitor parking bay
          within the front landscape buffer area adjacent to Olivine Lane.


3.2       Proposal Overview
9.        Please refer to the Proposal Plans prepared by Ausmar Homes in Appendix 2. It is proposed to construct
          three (3) Multiple Dwelling units onsite, comprising a detached Dwelling unit fronting Tewantin Road and
          two (2) attached Dwellings fronting Olivine Lane. All units will be constructed over two (2) storeys, with
          three (3) bedrooms, ample private open space and two (2) garaged resident car spaces each. A visitor car
          park will be provided adjacent to the Olivine Lane street frontage.

10.       Tables 2 and 3 below provide an overview of the key development parameters associated with the
          development and confirms that the development complies with the key Acceptable Outcomes of the
          relevant Planning Scheme codes.

          Table 2 Development Particulars
           Development             Required/Permitted                   Proposed                              Compliance
           Particulars
            Building Height        Not more than 8 metres from          Not more than 8 metres from natural   Yes
                                   natural and finished ground          and finished ground
            Site Cover             40%                                  31.95%                                Yes
            Plot ratio             0.4:1                                0.38:1                                Yes
            Landscaping            40% of site area with 60% of this    46.78% of site area with 100% of      Yes
                                   to be soft landscaping               this being soft landscaping
            Private Open Space     25m² per unit                        Min 49.68m² per unit                  Yes
            Parking                2 covered spaces per dwelling        2 covered spaces per dwelling plus    Yes
                                   plus one additional space per four   one additional space
                                   dwellings




     ASTP Ref: 220219                                                                                         Page 7 of 16

Page 8

       Table 3 Setback Compliance

        Height of Section       Required                            Proposed                          Compliance
        Setbacks                Front (Tewantin Rd) – 6m            Front (Tewantin Rd) – 6.9m        Yes
        (up to 4.5m high)
                                Front (Olivine Lane) – 6m           Front (Olivine Lane) – 8.5m       Yes

                                Side (north-east) – 1.5m            Side (north-east) – 1.5m          Yes

                                Side (south-west) – 1.5m            Side (south-west) – 2m            Yes

        Setbacks                Front (Tewantin Rd) – 6m            Front (Tewantin Rd) – 6.9m        Yes
        (between 4.5m and
                                Front (Olivine Lane) – 6m           Front (Olivine Lane) – 8.5m       Yes
        7.5m high)
                                Side (north-east) – 2m              Side (north-east) – 2m            Yes

                                Side (south-west) – 2m              Side (south-west) – 2m            Yes

        Setbacks                Front (Tewantin Rd) – 6 m           Front (Tewantin Rd) – 6.9m        Yes
        (between 7.5m and
                                Front (Olivine Lane) – 6m           Front (Olivine Lane) – 8.5m       Yes
        8m high)
                                Side (north-east) – 2.5m            Side (north-east) – 2.5m+         Yes
                                                                    (roof pitch only)
                                Side (south-west) – 2.5m            Side (south-west) – 2.5m+         Yes
                                                                    (roof pitch only)


11.    The proposed site layout is illustrated in Figure 2 below.




       Figure 2 Site Plan (Source: Ausmar Homes 2022)


12.    As shown in Figure 2 above, Unit 1 will be accessed via the existing crossover from Tewantin Road, with
       Units 2 and 3 being provided with a new shared access to Olivine Lane. All car parking areas provided
       onsite comply with the Australian Standards and the site layout ensures that adequate vehicle
       maneuvering area is provided onsite for cars to enter and exit in forward gear. Finally, it is proposed to
       provide a 2 metre wide land dedication to Olivine Lane to facilitate the widening of the laneway to match
       the works completed by the adjoining site to the north.




  ASTP Ref: 220219                                                                                   Page 8 of 16

Page 9

13.    Civil Engineering drawings for the proposed access, parking and roadworks design will be submitted to
       Council under a subsequent Operational Works application upon receipt of a Development Permit for the
       Material Change of Use.


3.3    Architectural Design and Built Form
14.    As illustrated in Figures 3 and 4 below, and by the Proposal Plans in Appendix 2, the development
       features a traditionally inspired built form with references to historical Queensland style architecture.
       The high-quality design comprises articulated box gable and hipped roof forms, which will be finished
       with metal sheeting. Further, the external walls present a mix of building materials and finishes, including
       paint finish lightweight horizontal cladding, rendered finish panel cladding and ample window glazing.
       Finally, the upper level balconies are provided with vertical timber balustrading.

15.    Steps, projections and recesses are evident in the building facades to enhance visual interest, which are
       created by the building layout, extended roof eaves and the incorporation of unenclosed porch and patio
       areas. Further articulation of the external walls is created by the inclusion of ample window and glazed
       door openings, which offers a combination of window types, shapes and positions to break up the
       appearance of blank walls.

16.    The final colour scheme will feature understated tones, largely consisting of white and Basalt grey.
       Overall, the proposed development encompasses a purposeful building design intent to reflect the
       traditional character of the local area, which is described within the Planning Scheme as having a ‘country
       town feel’.




       Figure 3 Olivine Lane Streetscape Perspective – Units 2 & 3 (Source: Ausmar Homes 2022)




  ASTP Ref: 220219                                                                                     Page 9 of 16

Page 10

       Figure 4 Tewantin Road Streetscape Perspective - Unit 1 (Source: Ausmar Homes 2022)


3.4    Landscaping
17.    Soft landscaping has been provided along all site boundaries, with the frontage landscapes providing
       visual relief to the built form, assisting in providing microclimatic control and generally making a positive
       contribution to the streetscape, whist still maintaining casual surveillance to and from the street. The
       proposal includes 473.51m² of landscaping onsite and exceeds the soft landscaping requirements under
       AO10.1 of the use code.

18.    The front setback area is provided as landscaped open space with the visitor car park setback more than
       2m from the front boundary. Further, front fencing is not proposed to be provided onsite. With the
       existing crossovers being retained, all existing street trees will be retained to continue the street tree and
       streetscape character.

19.    Detailed landscape design drawings will be submitted to Council under a subsequent Operational Works
       application upon receipt of a Development Permit for the Material Change of Use.




 ASTP Ref: 220219                                                                                       Page 10 of 16

Page 11

4      Statutory Framework
20.    This section of the Town Planning Report describes the statutory planning framework applicable to the
       proposed development.

21.    Table 4 below outlines the applicable State Mapping Triggers, which require consideration as part of this
       Town Planning Report. In addition to this, Table 4 details whether the application requires referral to any
       Referral Agencies.

       Table 4 Statutory Framework Mapping Layers
        State Planning Policy
                                        •     Flood Hazard Area - Local Government Flood Mapping Area
        Mapping

        Regional Plan                   SEQ Regional Plan (Urban Footprint)

        SARA DA Mapping                 •     Water Resource Planning Area Boundary
                                        •     Area adjoining/within 25m of a State-controlled road

        Non-SARA DA Mapping             Nil

        Required Referrals              Area adjoining/within 25m of a State-controlled road


4.1    State Planning Policy
22.    Section 2.1 of Council’s Planning Scheme indicates that the Planning Minister is satisfied that the relevant
       State interests in the July 2017 version of State Planning Policy (SPP) is appropriately integrated in the
       planning scheme with the exception of the erosion prone areas mapping. The site is not impacted by the
       SPP erosion prone areas mapping. No further assessment of the SPP is necessary on this basis.


4.2    South East Queensland Regional Plan 2017
23.    The site is subject to the South East Queensland Regional Plan 2017. Section 2.2 of the Planning Scheme
       confirms that the Planning Minister has identified that the planning scheme appropriately advances the
       South East Queensland Regional Plan 2017 as it applies to the planning scheme area. No further
       Assessment against the regional plan is necessary.


4.3    State Interests (State Assessment Referral Agency)
24.    A review of the above mapping against Schedule 10 of the Planning Regulation 2017 confirms that the
       application requires referral to the State for making a Material Change of Use on a premises within 25
       metres of a State-controlled Road. The referral will be made to SARA upon receipt of a Confirmation
       Notice from Council.

25.    The subject site will retain the existing residential driveway access from Tewantin Road for one (1)
       Dwelling unit. This arrangement is unchanged from the current circumstance.




 ASTP Ref: 220219                                                                                     Page 11 of 16

Page 12

5      Local Planning Instrument – Noosa Plan 2020
26.    A review of the Noosa Plan 2020 confirms the below relevant particulars apply to subject site and
       proposed development (refer to Table 5).

       Table 5 Planning Scheme Particulars
        Planning Instrument       Noosa Plan 2020

        Zone                      Medium Density Residential Zone

        Local Plan                Cooroy Local Plan Area

        Overlays                  Nil


5.1    Assessment of Development Application
27.    As part of this development application, the following codes have been addressed below:

              •     Cooroy Local Plan Area Code
              •     Medium Density Zone Code
              •     Dual Occupancy and Multiple Dwelling Code
              •     Works Codes:
                       o Driveways and Parking Code
                       o Earthworks Code
                       o Existing Services Code
                       o Fire services for common private title Code
                       o Landscaping Code
                       o Sustainable Building Design Code
                       o Transport Code
                       o Water Quality and Drainage Code
                       o Waterways Works Code
                       o Waste Management Code

28.    The proposed development generally complies with the Acceptable and Performance Outcomes of all
       applicable codes. The pertinent issues identified throughout the assessment of the application are
       detailed below. Where the below sections are silent in relation to an assessable element, the
       development is seen to comply with that relevant assessment criteria and no further assessment is
       required.

5.2    Cooroy Local Plan Code
29.    The proposed development complies with all relevant provisions of the Local Plan Code, with the
       provisions of key relevance to the proposal discussed in detail below. It is noted that the site is not
       mapped as containing any relevant Local Plan features on Figure 7.2.2.4.

30.    AO4 seeks for development adjacent to Tewantin Road to incorporate landscaping that complements the
       natural species occurring in the local area, protects existing vegetation within the road reserve and
       incorporates design elements that add visual interest to the streetscape. With the existing access
       point/driveway crossover being retained on this frontage, the proposed development can maintain all
       existing street trees in the verge along Tewantin Road. Further, the development can be conditioned to
       populate the 2 metre wide front landscape strip adjacent to Tewantin Road with species that are native



 ASTP Ref: 220219                                                                                 Page 12 of 16

Page 13

       to the area. Additionally, the development features a high-quality design with articulated gable and
       hipped roof forms, a mix of lightweight external building materials and steps and recesses in the building
       facades, which overall references the natural and built form character of the local area. The proposed
       development complies with AO4 on this basis.

31.    AO7.2-AO7.6 seek built forms that reflect traditional Queensland styles, with pitched roof forms that are
       visible to the streetscape, lightweight external building materials and open verandahs/balconies, as well
       as site layout design that allows for landscapes between buildings. As illustrated by the Proposal Plans in
       Appendix 2, the proposed development incorporates the aforementioned traditional building design
       elements, inclusive of the preferred roof forms and a predominant use of lightweight horizontal cladding
       to the external walls of the building. Further, the development provides extended roof eaves, covered
       entry porticos and open balconies with timber balustrades, as evident in traditional ‘Queenslander’
       homes that respond to the subtropical climate. Finally, soft landscaping has been provided along all site
       boundaries, with the deep planted frontage landscapes. Space is also provided between the buildings
       onsite and along the site boundaries to allow trees to be planted.

32.    The Cooroy Local Plan Code also includes Performance Outcomes (PO16-PO18) that are relevant to the
       function of laneways in the area. As such, the proposed development is required to support the role of
       Olivine Lane to provide access to sites in a way that relieves traffic along Tewantin Road and supports
       pedestrian connectivity. This is achieved by delivering a 2 metre wide land dedication to facilitate the
       widening of Olivine Lane and upgrading the external road to a standard that complies with the Planning
       Scheme.

33.    Overall, the proposed development complies with the relevant aspects of the Cooroy Local Plan Code.


5.3    Medium Density Residential Zone Code
34.    A full assessment against the Performance Outcomes and Acceptable Outcomes of the Medium Density
       Residential Zone Code has been provided in Appendix 3 and demonstrates that the development
       complies with all applicable Assessment Benchmarks of the Code. The only area of non-compliance with
       the Acceptable Outcomes of the Code relates to AO15.2, which is discussed in section 5.3.1 below.

5.3.1 Acceptable Outcome AO15.2 – Dual garages facing the street
35.   As shown on the Proposal Plans in Appendix 2, the Unit 2 and 3 garages facing Olivine Lane are not
      staggered and are separated by a 1.2 metre section of rendered wall, as opposed to the preferred 2
      metres. The garages are not found to dominate the street or the overall building design on the basis that
      their width does not exceed 4.5 metres wide and that they are recessed below the upper level balconies
      of the associated Dwellings. Further, the glazed front doors, covered porticos and projecting blade walls
      that create the building entrances to the sides of each garage articulate the ground level of the building
      to further reduce the visual impact of the garages facing Olivine Lane. Overall, the proposal complies with
      PO15 of the Code and no further assessment is required in this regard.


5.4    Dual Occupancy and Multiple Dwelling Code
36.    A full assessment against the Dual Occupancy and Multiple Dwelling Code has been provided in Appendix
       4 and demonstrates that the development complies with all applicable Assessment Benchmarks of the
       Code, with no departures from the Acceptable Outcomes proposed.




 ASTP Ref: 220219                                                                                    Page 13 of 16

Page 14

5.5    Driveways and Parking Code
37.    The number of car parking spaces, motorcycle spaces, bicycle spaces and loading bays has been provided
       in accordance with Table 9.4.1.4 - Minimum parking requirements including end of trip facilities. The
       development provides two (2) covered car parking spaces per dwelling and one (1) additional visitor car
       space as required. The table does not identify any requirement to provide motorcycle spaces, bicycle
       spaces or loading bays. In any case, bicycles could be stored within garages or within private open space
       areas and the driveway is of sufficient dimensions to facilitate infrequent access for moving trucks. With
       turning bays provided in each driveway, vehicles can enter and exit the site in forward gear. The proposed
       development complies with the Driveways and Parking Code on this basis.


5.6    Earthworks Code
38.    The Earthworks Code will be assessed at Operational Works stage as part of a subsequent application to
       Council. It is noted that the cut/fill works onsite will not result in a change to ground level of more than
       1.5 metres anywhere across the site.


5.7    Existing Services Code
39.    The development will be connected to all essential urban infrastructures. The proposal is for infill
       development within a well-established and well serviced locality therefore maximising the efficient use
       of existing infrastructure. All works and connections to infrastructure will be undertaken in accordance
       with the relevant Planning Scheme Policies, Unitywater requirements and other service provider
       requirements. The proposed development suitably complies with the Existing Services Code.


5.8    Fire Services for Common Private Title Code
40.    The Fire Services for Common Private Title Code will be assessed at Operational Works stage as part of a
       subsequent application to Council.


5.9    Landscaping Code
41.    Detailed landscape design drawings will be submitted to Council under a subsequent Operational Works
       application to demonstrate compliance against the Landscape Code.


5.10 Sustainable Building Design Code
42.    Each unit is provided with large building openings to capture prevailing breezes and maximize natural
       ventilation and cross breezes. Further, extended roof eaves and covered balconies are proposed to shade
       building facades and provide protection to building openings during weather events. All units are also
       provided with private open space areas that have a desirable north-eastern orientation. Overall,
       sustainable building design has been carefully considered in the proposed development.

43.    The proposed development can largely be conditioned to comply with the remaining aspects of the
       Sustainable Building Design Code, with the stormwater harvesting and landscape provisions of the Code
       able to be assessed as part of a subsequent Operational Works application. It is noted that the proposal
       dedicates 473.51m² of the site to landscaping (46.78%) and in turn minimises hard surface areas that
       reflect or store heat. This landscaping extent will include shade trees, particularly along the street
       frontages, with the proposed species intended to be detailed at Operational Works stage.


5.11 Transport Code
44.    The development is not of a scale that would unreasonably impact the operation of Tewantin Road, with
       the existing access driveway proposed to be retained for one (1) unit only. All resident vehicles can enter


 ASTP Ref: 220219                                                                                     Page 14 of 16

Page 15

       and exit the site in a forward gear, so as to not compromise the safety and efficiency of the road network,
       with turning bays provided at each end of the site. Finally, the site’s location supports the use of public
       and active transport modes.

45.    As detailed above, it is proposed to provide a 2 metre wide land dedication to Olivine Lane to facilitate
       the widening of the laneway to match the works completed by the adjoining site to the north, as required
       by the Local Plan Code. Civil Engineering drawings for the proposed access, parking and roadworks
       designs will be submitted to Council under a subsequent Operational Works application upon receipt of
       a Development Permit for the Material Change of Use. These works will be delivered in accordance with
       the Transport Code and relevant Planning Scheme policies.


5.12 Water Quality and Drainage Code
46.    It is proposed to provide details of the stormwater quality and quantity management solution as part of
       a subsequent Operational Works application upon receipt of a Development Permit for the Material
       Change of Use.


5.13 Waterways Works Code
47.    The development does not involve any works within or immediately adjacent a waterway. The provisions
       of the Waterway Works Code are not considered to be applicable to the proposed development.


5.14 Waste Management Code
48.    Each unit has been provided with sufficient area in the private open space to store individual waste bins.
       These bins will be screened by private open space fencing and will be serviced from the kerbside. The
       distance between the waste storage areas and the kerbside is less 60 metres (approximately 10m) as
       required by AO3.3 of the code. The proposed development complies with the Waste Management Code.




 ASTP Ref: 220219                                                                                    Page 15 of 16

Page 16

6      Conclusion and Recommendations
49.    This Town Planning Report demonstrates that approval of the proposed development is warranted,
       subject to reasonable and relevant conditions, on the following basis:

                   This application complies with the applicable assessment benchmarks of the State Planning
                    Policy which are integrated into the Planning Scheme;
                   The proposed development supports the intent and the description of the Urban Footprint
                    of the South East Queensland Regional Plan 2017;
                   The proposed development is a consistent and code assessable use within the Medium
                    Density Residential Zone;
                   The development satisfies all relevant Assessment Benchmarks of the Cooroy Local Plan
                    Code as discussed in section 5.2, and seeks to deliver the required land dedication and
                    external roadworks to facilitate the planned widening of the Olivine Lane laneway;
                   The proposed development complies with the Medium Density Residential Zone Code as
                    demonstrated by Appendix 3 and as discussed in section 5.3;
                   The development satisfies all relevant Assessment Benchmarks of the Dual Occupancy and
                    Multiple Dwelling Code as detailed in Appendix 4 and section 5.4;
                   The proposed development can comply with all Prescribed Other Development Codes; and,
                   The proposed development appropriately responds to all site constraints, including slope
                    with a stepped site layout being provided onsite.

50.    On the basis of the assessment contained within this report, it is requested that Council favorably
       consider the development proposal subject to reasonable and relevant conditions.


ADAMS + SPARKES
TOWN PLANNING



Cameron Adams                      Aspen Dunn
MANAGING DIRECTOR                  TOWN PLANNER




 ASTP Ref: 220219                                                                                 Page 16 of 16

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.