APPROVED PLAN
51989.108.17
NOOSA COUNCIL
23 MARCH 2021
-
[OCR of page images]
ELEVATIONS & SECTIONS
ABBREVIATIONS & LEGEND
GENERAL ABBREVIATIONS
‘AWNING (PROJECTION NOTED)
BALU
GA CeLING eiGHT
FACE BRICKWORK
FFL FINISHED FLOOR LEVEL,
Fot. pee GROUND LEVEL
LB LINEABOARD CLADDING
[we GROUND LINE
VERHANG
SIF STONE INLAY FEATURE
TOP OF WALL
WH — WINDOW HEAD
WL WALLLIGHT
wanow., ABBREVIATIONS,
FRAMED AWNING WINDOW
AUN FRAMED BIOL ‘STACKER DOOR,
IED BIFOLD STACKER WINDOW
‘ALUM, FRAMED CASEMENT DOOR
W ALUM. FRAMED CASEMENT WINDOW
‘ALUM. FRAMED DOUBLE HUNG WINDOW
‘ALUM, FRAMED FRENCH DOORS
FRAMED SLI
LAZII
‘SOLAR BLOCK GLAZII
T TINTED GLAZING
U/SIDE TRUSS CHORD,
U/SIDE TRUSS CHORD.
RENDERED FOAM
AWNING 450 WIDE.
EXTEND 200mm PAST
‘SIDE OF WINDOW
COLORBOND
DRY VERGE
TO GABLE END —
r— CONCRETE ROOF TILES.
ON TREATED PINE ROOF
‘TRUSSES AT 600 CRS.
t— COLORBOND:
DRY VERGE
TO GABLE END
RENDERED FOAM
AWNING 450 WIDE.
EXTEND 200mm PAST
‘SIDE OF WINDOW:
lee
ABQ ING
WINDOW HEAD
FLOOR SLAB __
2100
2450
I
>I Jf
ASULIAZE
CONCRETE ROOF TILES
ON TREATED PINE ROOF
TRUSSES AT 600 CRS.
ELEVATION 3
VILLAS 118 12
|DESCRIPTION
ALY 1809
150mm BLADES
obscure
NOT.
VISIBLE
ALY 1809
me
1:100 g
COLORBOND
DRY VERGE.
TO GABLE END
COLORBOND:
FASCIA,
>
COMBINATION.
150mm BLADES
[— CONCRETE ROOF TILES
ON TREATED PINE ROOF
TRUSSES AT 600 CRS.
RENDERED
& PAINTED
GABLE INFILL
08/02/21 |ISSUED FOR APPROVALS.
ISSUE | DATE
<
[Ocoprmcnr nonce
WINDOW HEAD
2100
2450
FLOOR SLAB
190 SQ. MERBAU
POST
APPROVED PLAN
51989.108.17
NOOSA COUNCIL
23 MARCH 2021
COMBINATION -
ASD 2118 OX STANDARD
+ ALV 2106
150mm BLADES
VILLAS 11 & 12
ELEVATION 4
1:100
190.SQ.MERBAU! — 800mm HT. RENDERED
POSTS & PAINTED
BLOCKWORK BASE ——
ce
CLADDING
corms
building group
Suite 2 / 199 Gympie Toe, Noosaville Q 4566
T 0754471250 —-F 07 54702586
E [email protected]
PROJECT
VILLAS 11 & 12
LAGUNA ESTATE
13 LAKE WEYBA DRIVE
NOOSAVILLE
CLIENT
LAGUNA RETIREMENT
ESTATE
DRAWING TITLE
ELEVATIONS
Sheet 2 of 2
@ ORIGINAL SIZE
A3
DRAWN,
MW
DATE
FEB. 2021
DRAWING STATUS
FOR CONSTRUCTION
DRAWING NO. ISSUE
LRV011 WD-07 A
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Compiled Approved Plans 51989.108.18.pdfRelated documentApplication case desk ↗
About this file
- File size
- 54.6 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.