10. Pre-lodgement meeting record (2020)

of 10

Page text shows just the words. Original shows the document exactly as it was published.

                                                                                                2010-19136 SPL



                                  existing dredging approvals in the locality. Testing would be required
                                  where a new application is lodged (see comments below).
 3. Dredge                   Martin advised that:
 Management Plan              The current permit is consistent with the Noosaville Dredge Management
                                Plan 2006.
                              Proposed works will also be undertaken in accordance with Noosaville
                                Dredge Management Plan (with amendments if required).
                              Please see further comments below.
 4. Fish Habitat Area        Martin advised that:
                              A mapped fish habitat area is currently 25m from existing approved
                                dredge site area four.
                              New dredging/nourishment areas are to maintain minimum 25m minimum
                                from fish habitat areas.
                              A marine biota impact assessment was undertaken (Biome Consulting
                                2020) which determined there would be no impact to the fish habitat
                                area.
                              One marine plant (mangrove) was identified and an exclusion zone has
                                been established to ensure that there are no impacts to marine plants.
                              DAF advised that if no marine plants were disturbed, then no referral
                                would be required.
 5. Heritage                     Martin advised that there are no changes to dredging and nourishment
                                  works adjacent to heritage area at Munna Point caravan park.
                                 DES have provided further written comments below.
 6. Development                  Martin sought clarification that that an “Other Change” of the existing
 Permit                           development permit is appropriate.
                                 Luke provided the advice that the scope of works would not be ‘generally
                                  in accordance’ with the existing approval, and unlikely to be a ‘minor
                                  change’ because it involves new land parcels. Therefore, the applicant
                                  has the option of lodging either an ‘other change’ or new application. An
                                  ‘other change’ of the existing approvals would give the applicant an
                                  opportunity to ‘tidy-up’ and consolidate other dredging approvals in the
                                  locality.
 7. Environmental                Martin sought advice whether the existing EA could be changed, or if a
 Authority                        new EA is required.
                                 DES advised that a new EA may be required, depending on the nature of
                                  the application lodged (see comments below).

It is considered that the above summary is an accurate record of the matters discussed at the pre-
lodgement meeting.

An outcome of the meeting was identifying an opportunity to consolidate and ‘tidy-up’ the conditions of
old dredging approvals, and possibly consolidate a suite of other dredging approvals in the locality into a
new, single streamlined approval. This approach was supported in principal by SARA and could be done
by either an ‘other’ change process or new application. SARA has provided further written advice below
to follow-up the meeting.

Written advice
SARA provides written advice to follow-up the meeting as follows:


 10.17.3.1 Operational Works for Prescribed Tidal Works (DES Coastal)
 1.     ‘Original’ proposal (change to existing approval)

         The proposal initially submitted to SARA for prelodgement discussion involves the dredging
         and beach nourishment of six areas from Hilton Esplanade to Munna Point in the Noosa River.


 State Assessment and Referral Agency                                                             Page 4 of 10
Log in to download the original file

10. Pre-lodgement meeting record (2020).pdf · 408 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.