10. Pre-lodgement meeting record (2020)
2010-19136 SPL
and where to apply, the application and annual fees that apply, how to determine
environmental impacts/relevant Environmental Protection Policies, guidance materials to
assist in the preparation of supporting information and additional resources.
https://www.business.qld.gov.au/business/running/environment/licences-permits/form-fees-
finder
Any development application made should provide a response to the latest version of the
SDAP State code 22 – Environmentally Relevant Activities in its entirety, identifying how the
proposed development meets each performance outcome by addressing all applicable
acceptable outcomes.
This can be found at: https://planning.dsdmip.qld.gov.au/planning/better-development/the-
development-assessment-process/the-states-role/state-development-assessment-provisions
10.17.3.2 Operational Works for Prescribed Tidal Works (MSQ)
6. The commencement notification requires a Marine Execution Plan (MEP) attached to support
the development of a notice to mariner and wider assessment of marine safety in the local
area during the works. The MEP should include the following;
Forecasted start and end dates,
Hours of work,
General methodology overview,
Name of principal barges and marine equipment involved,
Barge Mooring Plan,
Extreme weather contingency plans,
24/7 point of contact to ensure timely communication with VTS during extreme
weather and other maritime emergencies,
Vessel traffic management plan to allow safe passage of passing traffic,
Marking of navigation hazards during construction, such as unattended piles and
barge anchors, and
Any other information to support the safe management of the marine works as
identified by the applicant.
7. Any dredging or nourishment works must not be conducted within 10m of a Maritime Safety
Queensland Aid to Navigation without prior consultation.
8. A number of houseboats anchor adjacent to Hilton Esplanade, Tewantin. These may need to
be relocated for the period of the works. It is recommended the applicant liaise with the
owners for this to occur.
9. A post dredge survey of the area navigable by vessels will be required to be provided by the
applicant within 1month of completion.
10.8.3.1 Development on a Queensland Heritage Place (DES Heritage)
10. The development application should include a Heritage Impact Statement (HIS) which
identifies and evaluates the extent of potential impact of the proposed dredging and
deposition on the park’s significant vegetation, beach profile relative to the van and tent sites
along the river’s edge, and the ongoing use of the caravan park. The HIS should detail the
extent of change to the place likely to result from the works by:
(a) showing what elements or aspects of the heritage place are impacted by the
proposed change;
(b) providing an analysis of the impact on the place’s cultural significance
including a rationale for the change (e.g. extending the beach will encourage
State Assessment and Referral Agency Page 8 of 10
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the original