Council archive · source document
09/0951 - MCU - Detached House [As Published] · 132009.951
GENERAL NOTES RPD
ALL OTHER CONTRACT DOCUMENTS, INCLUDING ENGINEERING. .
2. FIGURED DIMENSIONS TO TAKE PREFERENCE OVER ‘ .
SCALED DIMENSIONS 4 RP NO: 59216
3. ALL DIMENSIONS TO BE VERIFIED ON SITE BY BUILDER : PARISH: NOOSA
PRIOR TO THE COMMENCEMENT OF WORK . . 1
4.REFER ANY DISCREPANCIES TO DESIGNER FOR WRITTEN 4 .
INSTRUCTION , COUNTY: MARCH
5. BUILDING TO ENSURE CORRECT BUILDING SETOUT AND .
COMPLIANCE WITH STATUTORY HEIGHT LIMITS AND | SHIRE: SUNSHINE COAST
BOUNDARY SETBACKS. . 2
6. THE STRUCTURE SHALL BE PROTECTED FROM TERMITE i AREA: 506 m
ATTACK IN COMPLIANCE WITH AS3680.1AND BCA 3.13. i
7. STORMWATER TO BE DISCHARGED TO COUNCIL
REGULATIONS ,
8. DRAINAGE WORK TO COMPLY WITH COUNCIL 4
REGULATIONS. :
9. ALL WORK TO BE IN ACCORDANCE WITH THE B.C.A. AND
AS 1684.2-1999 AND ENGINEER DRAWINGS AND SPECIFICATIONS.
10. ALL DOORS TO ENCLOSED SANITARY COMPARTMENTS xn !
TO HAVE LIFT OFF HINGES, OPEN OUTWARDS, OR BE SLIDING z LY PROPOSED DRIVEWAY
DOORS. UNLESS THERE IS AT LEAST 1.2m BETWEEN CLOSET Mee °
PAN WITHIN THE SANITARY COMPARTMENT AND THE 000
NEAREST PART OF THE DOORWAY. —
44, ALL WET AREAS ARE TO BE WATERPROOFED IN ACCORD. BORY TO FLYOVER ROOF
WITH CLAUSE 3.8.1 OF THE B.C.A.
12, SMOKE DECTECTORS ARE REQUIRED TO BE INSTALLED IN
ACCORDANCE WITH CLAUSE 3.7.2 OF THE BCA & AS 3788
13. BALUSTRADES ARE TO BE CONSTRUCTED AND INSTALLED
IN ACCORDANCE WITH CLAUSE 3.9.2 OF THE BCA.
14, STAIRS TO BE CONSTRUCTED AND INSTALLED IN PROPOSED DWELLING
ACCORDANCE WITH CLAUSE 3.9.1 OF THE BCA.
45. INSTALL VENTILATION TO WATER CLOSETS (NATURAL OR
HANICAL) TO COMPLY WITH CLAUSE 3.8.5 OF THE BCA.
16%e8B-FLOOR VENTILATION, 400mm CLEARANCE REQUIRED TO U/S
OF BEARER IN ACCORDANCE WITH BCA PART 3.4.1 Fig. 3.4.1 Diag. b.
(NOTE: EXCLUDES BUSHFIRE RISK LEVEL 1/MEDIUM AND ABOVE.)
47, SITE TO BE CUT AND FILLED IN ACCORDANCE WITH
GEOTECHNICAL ENGINEERS SPECIFICATIONS. ALL
LEVELS TO BE CONFIRMED ON SITE PRIOR TO
CONSTRUCTION.
48.EXCAVATIONS TO BE IN ACCORDANCE WITH
BCA 3.1.1 AND ENGINEERS DESIGNS, DRAINAGE WORK
TO COMPLY WITH GEOTECHNICAL ENGINEERS —
RECOMMENDATIONS AND STRUCTURAL ENGINEERS DETAILS. an
49.ALL EARTH WORKS, FOOTINGS AND SLABS TO BE IN
154° 41° 00"
17.099 m
“LOT 90.
URUNGA PARADE
ACCORDANCE WITH ENGINEERS DESIGN AND DETAIL. ‘ ‘ : , 506m? ,
20.DRIVEWAY AND CROSSOVER TO BE IN ACCORDANCE . \ . @ \ ! Loe
WITH COUNCILS STANDARD DRAWING DETAILS. Q ‘ %, 6 . | Ne
21, ANY REQUIRED RETAINING WALLS, SITE WORKS AND nf8 . » \ \ j o |S
STORMWATER DRAINAGE ARE TO BE COMPLETED PRIOR TO &| = \ ‘ | a|E3
OCCUPANCY. gy2 . \ | \ \ © 40! 30" ae
3le . . \ . \ to fn. 244° 40' 30 ne y 34
WIND CLASSIFICATION - N3 = abba t © .
e =
ALL CONSTRUCTION TO BE CARRIED OUT IN xs <4 7 Temporary Benchmark
ACCORDANCE WITH AS 1684.2 FOR A WIND ad 6499 RL2.044m
CLASSIFICATION OF N3 By ‘ BDRY TO POST
8 j (SETOUT POINT)
a
PROPOSED DECK'2 PROPOSED DECK 1
Site Plan
4
©copyright. All plans are subject to copyright and may not be reproduced in whole or in part without the express written permission from Bush & Beach Pty. Ltd. This building shall be constructed in accordance with the current BCA, and all relevent Australian Standards. Template V1.8 - 24.02.09
. . ISSUE: (DETAILS: DATE: "nN" i
Bush § Beach Ply Lid. =| CLIENT: PROPOSED DWELLING TITLE: DRAWN: _GW_| DWG No._1T"A WORKING DRAWINGS zerroa] Oram IN nesign ply. Ua.
Ph, 1300 305 350 Donna Jefferies Lot 90 Site Plan CHECKED: W____/ 082620 B__|WORKING DRAWINGS ozmzme| “ence (Use 20s
41144953 Urunga Pde DATE: 02/07/09 2 .
BSA. i LD. SCALE: 1: 200
ACN.131677319 Boreen Point, QLD, 4565 SHEET SUE: AS 18 Date:
—
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
09/0951 - MCU - Detached House [As Published]Related documentApplication case desk ↗
About this file
- File size
- 4.1 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.