Council archive · source document
06/0718 - Response to request for further information [As Published] · 132006.718
Very large file (10.2 MB): the original may take a few minutes to open or download. The page text below is quick to read.
ISSUE DATE
(E)_THIS WORK IS COPYRIGHT AND T
+
HE PROPERTY
OF ROY K. SAINT PTY
LTD. IT MUST NOT BE COPIED. REPRODUCED RETAINED ON OR USED IN
V ITS ENTIRETY OR IN PARTS FOR ANY PI
JRPOSE OTHER THAN T
HE SPECIFIC PURPOSE SET OUT
PROPOSED SILT FENCE BELOW
HEREON WITHOUT WRITTEN PERMISSION
TENNIS
COURTS
o0st
SEDIMENTATION NOTE:-
ALL EARTHWORKS AREAS TO BE PROTECTED FROM
DAMAGE BY STORMWATER. EXISTING TABLE DRAINS TO
BE GRADED TO PREVENT PONDING AND DETENTION OF
TO PREVENT ANY PONDING OF STORMWATER. LOCATION
OF SEDIMENT FENCES INDICATIVE ONLY, FINAL
LOCATION, LENGTH AND NECESSITY TO BE DETERMINED
ON SITE BY ENGINEER. ALL SILTATION CONTROL
DEVICES TO BE IN ACCORDANCE WITH I.E.AUST
SEDIMENTATION GUIDELINES. ALL SILTATION CONTROL
DEVICES TO BE REGULARLY MAINTAINED AS DETERMINED
ON SITE. ALL STORMWATER AND TRENCHING
CONSTRUCTION TO BE PROTECTED DURING
CONSTRUCTION PERIOD TO REDUCE RISK OF SILTING UP
AND SCOUR DAMAGE.
| EY DEVELOPMEMT,
as | FY
Q\\ i
a \ \ \ \
| \ LS
. N
\ \ we
RUNOFF. ALL EARTHWORKS TO BE SHAPED AND GRADED
DEVELOPMENT SECTIONS
2
_—- 4
eT. s 8
= 10 >
o
py ERIN : 7 <
a 5 \ \ \ 6 oS
RKO pt 2 \ \ \ =
Dole \ \ 3 — i
Yao \ .
\ \ \ 7 TBM <Q h
a ‘ae Sy NO} aa D\. 5
a \ $ >
1 ez \ “i a =
PROPOSED \ &
\ CARPARKING , ee
PBROPOSE, SS Se es Ms '
ah > aT
HE Bee bo eee :
we > \ . \ yO
=: : 7 \ f <2 ne
ee eee [Roig
\ \ >
ea 7g ! @°
: Be ‘| ) KE
600 SQR FOX BCGPT
OR EQUIVALENT
EXCAVATED SEDIMENT DEPRESSION
@ OUTLET UNTIL STORMWATER
DETENTION TANK IS INSTALLED
DURING CONSTRUCTION
PROVIDE RUBBLE RUMBLE CROSSOVER
AT SITE ENTRY/EGRESS TO MINIMISE CONTAMINATION
FROM ENTERING ROAD AND STORMWATER SYSTEM
HATCHING DENOTES APPROX EXTENT OF COMPACTED FILL
FROM PLATFORM AND DRIVEWAY EXCAVATION AREAS
CONTRACTOR TO CONFIRM ALL DIMENSIONS &
LEVELS ON SITE PRIOR TO COMMENCEMENT
OF ANY WORK.
ALL CONSTRUCTION TO COMPLY WITH THE
AUSTRALIAN BUILDING CODE REQUIREMENTS
& RELEVANT AUSTRALIAN STANDARDS.
SEDIMENT STRUCTURES MAINTENANCE.
SEDIMENTATION CONTROLS OVER THE SITE ARE TO BE FULLY
FUNCTIONAL AT ALL TIMES. SEDIMENT CONTROL METHODS AND
SPACING T0 BE ADJUSTED TO SUIT ONSITE CONDITIONS. EROSION
AREAS ARE TO BE REHABILITATED UPON COMPLETION OF EARTHWORKS.
ALL STORMWATER OUTLETS AND CHANNELS TO BE STABLE AND WELL
MAINTAINED, THE CONTRACTOR IS FULLY RESPONSIBLE FOR ANY SILT
OR SEDIMENTATION PROBLEMS THAT MAY OCCUR OVER THE SITE. ALL
SEDIMENTATION CONTROL DEVICES TO BE MONITORED AND REGULARLY
MAINTAINED.
- m
GAG DESIGN
\ VEGETATION NOT INTENDED FOR RETENTION SHALL BE REMOVED
TO STOCKPILE FOR DISPOSAL. FILL MATERIAL SHALL NOT BE
PLACED AGAINST OR AROUND VEGETATION THAT IS TO BE
RETAINED. TOPSOIL IS NOT TO BE REMOVED FROM AROUND
VEGETATION THAT IS TO BE RETAINED. FILL MATERIAL IS NOT
TO BE PLACED IN HIGH EROSION RISK AREAS, SUCH AS
ADJACENT TO DRAINAGE LINES OR WATER COURSES. LAND
SHAPING OPERATIONS TO LEAVE EXPOSED SOIL IN A
ROUGHENED CONDITION TO ENCOURAGE INFILTRATION AND
MINIMISE RUNOFF. STOCKPILES ARE TO BE LOCATED AWAY FROM
AREAS SUBJECT TO CONCENTRATED OVERLAND FLOW AND
PREFERABLY ON FLAT GROUND. CONSTRUCT PERIMETER BANKS
OR CATCH DRAINS AROUND STOCKPILES AS REQUIRED AND AS
DIRECTED ON SITE BY ENGINEER. TRAFFIC TO BE LIMITED OVER
DRY EXPOSED SURFACES. EXPOSED SURFACES TO BE WATERED
AS REQUIRED TO ENSURE DUST CONTROL. WINDBREAKS TO BE
CONSTRUCTED AS DIRECTED ON SITE BY ENGINEER.
‘SITE MANAGEMENT _NOTES:-
THE EROSION AND SEDIMENTATION CONTROL PROGRAM IS TO BE
IMPLEMENTED AT COMMENCEMENT. VEHICLES AND PLANT TO BE
KEPT TO WELL DEFINED HAUL ROADS. CONSTRUCTION ROADS TO
FOLLOW NATURAL CONTOUR OF THE TERRAIN, WHERE POSSIBLE,
TO HELP REDUCE EROSION POTENTIAL. VEGETATION THAT IS TO
BE RETAINED TO BE CLEARLY DEFINED SO AS NOT TO BE
DISTURBED BY EQUIPMENT. TEMPORARY CATCH DRAINS
INSTALLED UPSLOPE OF EXPOSED SOILS AT THE END OF EACH
DAYS WORK AS NECESSARY AND AS DIRECTED ON SITE BY
ENGINEER. THE AREAS AFFECTED BY THE WORK SHALL BE KEPT
TO A MINIMUM. CONTRACTORS VEHICLE ENTRY AND EXIT POINTS
FROM THE SITE SHALL BE KEPT TO A MINIMUM. NO SEDIMENT
EITHER TRACKED OR RUNOFF PRODUCED WILL BE TOLERATED ON
PUBLIC ROADS. ANY MATERIAL FOUND ON PUBLIC ROADS IS TO
REMOVED IMMEDIATELY. CONTRACTOR IS FULLY RESPONSIBLE
FOR REMOVAL OF ANY SEDIMENT TRANSPORTED ONTO PUBLIC
Note:- All FILL to be compacted
and tested to Level 2 in
accordance with AS 3798
(commercial loading)
REVISION
POSIS DRIVEN
Z| 0ee IN{O
BATTERED AND SHAPED TO CARPARKING GRADE REQUIREMENTS WIRE OR I yw
SHEEL MESH NS
\S
~
EARTHWORKS & SEDIMENT CONTROL PLAN oe
DENOTES INDICATIVE SILT FENCE ALIGNMENT Sener sa
SCALE 1:200 (A3)
amen ene
BARRIER
NOTE:- \ ones
ALL EARTHWORKS AREAS Zz CO!
TO BE TOPSOILED, g !
SEEDED AND WATERED TO a v 700 MN.
i ENSURE MAXIMUM GRASS eal) |
COVERAGE AS SOON AS — 2tea Paxets om _|
POSSIBLE AFTER TSE Cl
COMPLETION OF WORK IN Note: CONRACIOR {0 REMOVE DEBRIS
TYPICAL FABRIC DROP VICINTY. es no keenen on
INLET PROTECTION DETAIL
a2 nT SEDIMENT FENCE DETAIL
EARTHWORKS & SEDIMENT CONTROL OOODO0OO000
} 1:200 (A3)
/Saint, Consulting
ENGINEERS
A.B.N. 15 096 410 909
ISSUE PRINTED: CADO01
010207-09
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
06/0718 - Response to request for further information [As Published]Related documentApplication case desk ↗
About this file
- File size
- 10.2 MB (very large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take a few minutes. On mobile data, it is best to wait for Wi-Fi.