Original source · versioned page text
Noosa Plan Code Assessment
Plans and drawings
This document appears to be plans or drawings. Its page text below holds only the words printed on the drawings, without the drawings themselves, so it may be jumbled or hard to follow. To see the plans as drawn, choose Original above or download the file (both need you to log in).
Log in to see the plans as drawnPO48 AO48 Complies
Development and associated site Development and associated site
works including filling, excavation works, including filling and excavation,
and retaining structures do not are designed and constructed to ensure
directly, indirectly or cumulatively overland flow and/or flooding is not
cause adverse impacts external to worsened, impeded, or otherwise
the development site by: diverted to adversely affect other
(a) causing ponding of water on properties.
the site or nearby land;
(b) increasing flooding, which
adversely affects the safety
or use of any land
upstream and downstream;
or adversely affecting the
flow of water in any
overland flow path.
Environment and Heritage
Performance outcomes Acceptable outcomes Comment
Environment, heritage and scenic amenity
PO49 AO49.1 Can be conditioned to comply
Development: Development does not result in
(a) retains natural vegetation sediment or other material including
wherever possible; building materials or waste products
being deposited or released into the
(b) has minimal impact on the road reserve, stormwater drain or
natural landform of the site; adjacent properties.
(c) does not lead to erosion or the AO49.2 Not applicable
transport of sediments off site; Where there is a nominated building
envelope on the lot, clearing of native
(d) does not lead to the vegetation and building works does not
disturbance of natural features, extend beyond the building envelope,
buildings or structures of cultural except for the purposes of a driveway
heritage significance. access.
AO49.3 Not applicable
Development on a site adjoining a
heritage site respects the cultural
heritage significance of the site by
mitigating any adverse impacts on the
setting or integrity of the heritage.
Editor’s Note— Heritage sites are
identified on the Heritage and
Character Areas overlay maps in
schedule 2.
Infrastructure
Performance outcomes Acceptable outcomes Comment
Infrastructure
PO50 Complies
Development is supported by No acceptable outcome provided
adequate infrastructure and services
including reticulated water,
sewerage, stormwater drainage,
sealed roads, pathways, electricity
and telecommunication
infrastructure.
PO51 Complies
Development does not adversely No acceptable outcome provided
impact on the continued operation,
viability and maintenance of existing
infrastructure or compromise the
future provision of planned
infrastructure.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalSearchable page text hides email addresses. Original files are unchanged and may show email addresses.