Project No. PG-2096                                                                                          Page | 10
May 2022
Ref: PG-2096, 2019-02-21, GR VER 4
Clare Design – Geotechnical Stability Assessment - Proposed Residence, 22 Arakoon Crescent, Sunshine Beach




9.0 SITE MANAGEMENT

To maintain the long term performance of the structure, good management of the
soil conditions and the development is vital throughout the life of the development.

The following are some specific comments with respect to site management.

          It is important that the site be well drained. The ground around the building
           should slope away at 1 in 20 for 2 metres and then fall to the stormwater
           system to prevent ponding of water adjacent to the building.
          Founding soils should not be allowed to become saturated.
          Service trenches under the buildings should be kept to a minimum. Saturation
           of the on-site material will result in an increase in potential ground surface
           movements.
          Footings should be poured immediately after excavation. If footings cannot
           be poured on the same day as excavation, a blinding layer of 50mm
           thickness is recommended.
          Trees, garden beds and other vegetation should be planted at a distance at
           least equivalent to three quarters of their mature height away from the
           structures. This will assist in minimising shrinkage movements in the expansive
           on-soils.

10.0 STABILITY EVALUATION

    10.1 General

The overall stability evaluation of the proposed building site has been carried out on
a broadscale basis by visual inspection and from the subsoil information from the
boreholes undertaken.

No signs of mass/global instability were noted across the proposed development
sites during the field assessments.

Building Type

The proposed structure is to comprise of a rigid/blockwork undercroft structure with
lightweight, flexible structure over the remainder of the site. Ground floor
construction should be designed as fully suspended.

Retaining Walls

Structural retaining walls will be required to support the excavations. The walls
should be structurally designed in accordance with the recommendations outlined
in Section 8.0 of this report. in the fill platform are not recommended for the site.
Log in to download the original file

Attachment 2 - Geotechnical Stability Assessment.pdf · 1.9 MB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.