Attachment 2 - Geotechnical Stability Assessment
Logs for fill, it may be difficult to reliably determine
the extent of the fill.
The borehole or test pit logs are an
interpretation of the subsurface conditions, and Laboratory Testing
their reliability will depend to some extent on
the frequency of sampling and the method of Laboratory testing is carried out in general
drilling or excavation. accordance with Australian Standard 1289
‘Methods of Testing Soil for Engineering
Interpretation of the information shown on the Purposes’.
logs, and its application to design and
construction, should therefore take into Site Anomalies
account the spacing of the boreholes or test
In the event that conditions encountered on
pits, the method of drilling or excavation, the
site during construction appear to vary from
frequency of sampling and testing and the
those which were expected from the
possibility of other than “straight line” variations
information contained in the report, the
between the boreholes or test pits. Subsurface
company requests that it immediately be
conditions between boreholes or test pits may
notified. Most problems are much more readily
vary significantly from conditions encountered
resolved when conditions are exposed than at
at the borehole or test pit locations.
some later stage.
Groundwater
Review of Design
Where groundwater levels are measured in
Where major civil or structural developments
boreholes, there are several potential
are proposed or where only a limited
problems:
investigation has been completed or where the
Although groundwater may be geotechnical conditions/constraints are quite
present, in low permeability soils it may complex, it is prudent to have a design review.
enter the hole slowly or perhaps not at
Site Inspection
all during the time it is left open.
A localised perched water table may
Pacific Geotech would be pleased to provide
lead to an erroneous indication of the
engineering inspection services for
true water table.
geotechnical aspects of work to which this
Water table levels will vary from time to
report is related:
time with seasons or recent weather
changes and may not be the same at Requirements could range from:
the time of construction.
The use of water or mud as a drilling i. a site visit to confirm that conditions
fluid will mask any groundwater inflow. exposed are no worse than those
Water has to be flushed from the hole interpreted, to
and drilling mud must be washed out ii. a visit to assist the contractor or other
of the hole or ‘reverted’ chemically if site personnel in identifying various
water observations are to be made. soil/rock types such as appropriate
More reliable measurements can be made by footing or pier founding depths, or
installing standpipes from which ongoing iii. full time engineering present on site.
monitoring can be undertaken.
Fill
The present of fill materials can often be
determined only by the inclusion of foreign
objects (e.g. bricks, steel ,etc.) or by distinctly
unusual colour, texture or fabric. Identification
of the extent of fill materials will also depend on
investigation methods and frequency. Where
natural soils similar to those at the site are used