Landscape Specification

of 108

Page text shows just the words. Original shows the document exactly as it was published.

Page text read automatically using OCR, there may be inaccuracies

CONTENTS

Luminescence contrast testing
Contrast between stair thread paver and stair nosing to be tested and approved as per AS1428. Contrast
between tactile indicators and adjacent pavement to be tested and approved as per AS1428.\

Efflorescence
Take all necessary measures to ensure no efflorescence occurs. Select base materials and include
admixtures to prevent the occurrence of efflorescence.

Structural Requirements
Refer to Engineer's Specifications for slab thicknesses, cover to reinforcing, reinforcing, concrete MPa and
base course requirements. Engineers Specifications take precedence over the requirements noted in this
item. Structural slab to be fully cured to the current curing recommendations.

Floating Pavement
Due to the different profile depth between structural slab and pavement finish level a suspended slab with
structural support shall be considered in those areas. In areas where planting extends underneath the
suspended slab, the slab is to be placed on stratavault and walls shall be placed on the boundary of the soil
trench zone. No structural support to be placed within the soil volume.

Levels
Ensure there is no more than 2mm different in height between adjoining pavement segments, other adjoining
pavements, top of kerbs or pit covers (unless specified otherwise).

Spot levels take precedence over contour lines and existing ground profile lines.

Tactile Indicator
Install tactile indicators in accordance with AS1428.

Natural Stone paver
To ensure the site wide consistency of all granite used across the site including other consultant works the
natural stone shall be supplied from the same quarry. Confirm with Superintendent the source and colour of
all other site examples of stone. Source samples of stones to be installed by others to ensure matching
works are achieved.

Concrete Joints
All joints to be laid out as indicated on the construction drawings. If the location and type of construction
joints are not shown on the drawings, submit proposed location and detail of construction joints to the
Landscape Architect for approval prior to the start of formwork placement. Periods of stoppage in concrete of
3/4 hour or more are deemed to be construction joints.
Ensure that joint widths between pavers at dowelled construction joints are equal to the underlying concrete
pavement joint widths. The concrete base slab should not be designed solely as a jointed reinforced
concrete pavement (JRCP) but must be designed and detailed to avoid differential strains between the
pavers and the concrete slab. Pavers to be laid immediately following construction of concrete base to avoid
shrinkage of slab.

Expansion joints
All visible expansion joints to be 10mm wide zipped polyethylene foam (e.g. Abelflex) sealed with an
approved coloured sealant (e.g. Sikaflex or equivalent). Colour to match the lightest coloured adjacent
pavement. Expansion joints in structural slab underneath (both basement and single slab) are to be carried
through to the surface in the same dimensions.

Control joints
To be 20mm deep cut saws. Make the joint straight and true, and free from blemishes impermissible for its
surface finish class.




URBIS
URB-SPC-LAN-P0025138 - IFC.DOCX                                                                        PAGE   32
Log in to download the original file

LANDSCAPE SPECIFICATION.pdf · 7.8 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.