Original source · versioned page text
Landscape Specification
CONTENTS 11. WATERFEATURES & POOL FINISHES 11.1. GENERAL SPECIFICATIONS The pools and waterfeature described below are the design intent only. For detailed plans and specification refer to pool and waterfeature engineer’s documentation. Health and Safety The system must be installed so that it can be completely flushed out and cleaned easily. Acoustic Consideration must be given to the pump and filtration system design so that no noise is evident other than the water noise of the water feature during operation and that the existence of water hammer is prevented. Joint Sealers Supply and install approved joint sealers to all piping and sleeves at all penetrations. Slip resistance Ensure pavement finishes including sealers, tactiles and directional pavers are compliant with the slip resistance requirements of the National Construction Code (NCC) and Australian Standards AS/NZS 4586 2013, AS HB 198 2014 and Star / Echo requirements for slip resistance. Ramp surfaces must have a slip resistance classification as per BCA table D2.14. Provide complying slip resistance test results to the Project Manager. Samples Install a minimum 5m2 for floor finishes and 2.5m long for edge types sample area of each different finishes type showing materials, surface pattern, colour, finish and joints for approval by the Landscape Architect. If acceptable, this sample should be retained as a quality benchmark and shall form part of the finished works. URBIS URB-SPC-LAN-P0025138 - IFC.DOCX PAGE 38
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.