                                                             Officer:            Patrick Murphy
                                                             Direct Telephone:   61753296436
                                                             Our Reference:      RAL20/0021 :
                                                             Your Reference:     20/5179

               15 July 2021


               Vantralia Pty Ltd
               C/- Max Watterson & Associates
               PO Box 639
               COOROY QLD 4563
               [email protected]



               Dear
                                                Negotiated Decision Notice
                                                        Planning Act 2016

               I refer to your application and the representations you made in respect to the decision notice. On
               9 July 2021, Council decided your representations. This negotiated decision notice replaces the
               decision notice of 30 April 2021.
               Details of the negotiated decision are as follows:
               1.      APPLICATION DETAILS

                   Application No:             RAL20/0021

                   Street address:             2 Pearsons Rd Cooroy Qld 4563

                   Real property description: Lot 3 RP 113733

                   Planning Scheme:            Noosa Plan 2020 (31 July 2020)

               2.      DECISION DETAILS

               Council on 30 April 2021, decided to issue the following type of approval:
                      Development Permit to Reconfigure a Lot (1 Lot into 19 and park)
               In relation to representations, Council on 8 June 2021 decided to:
               A.      Agree to amend conditions 7, 8e, 10, 13b, 13d, 22, 23, 31a, and 36a, b, and c
               B.      Delete conditions 13e, 13f and 32
               C.      Refuse to amend conditions 12, 13a and 13c for the following reasons:
                          i.    The proposed development is required to provide adequate pedestrian/bicycle
                                connectivity in accordance with the Transport, Roads and Drainage Code to
                                encourage travel by means other than private vehicles and provide connection to
                                the wider pathway networks and public transport.
                          ii.   The water quality conditions are consistent with the requirements of the State
                                Planning Policy and the Noosa Plan 2020.
               D.      Refuse to delete condition 36d for the following reasons:



                                               PO Box 141                 P. (07) 5329 6500       [email protected]
                                               TEWANTIN QLD 4565          F. (07) 5329 6501       www.noosa.qld.gov.au
                                                                                                               Page 1 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                         Print Date: 15 July 2021, 4:03 PM
Log in to download the original file

RAL20-0021 Bulk_20210715160345.pdf · 427 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

Full text of the other 18 pages

Page 2

Noosa Council documents




                           i.    A grassed detention swale is not supported as CEPTD requirements can be achieved
                                 with low shrubbery and native grasses, the planting of vegetation reduces
                                 maintenance costs into the future.
               3.     CURRENCY PERIOD OF APPROVAL

               The currency period for this development approval is stated in the conditions below.
               4.     ASSESSMENT MANAGER CONDITIONS

                      Approved Plans
               1.     Development undertaken in accordance with this approval must generally comply with the
                      approved plans of development. The approved plans are listed in the following table unless
                      otherwise amended by these conditions.

                           Plan No.             Rev.   Plan/Document Name                            Date

                           20-5179AN            B      Plan of Proposed Reconfiguration of Lot 3 23.04.2021
                                                       on RP 113733

               2.     All lot numbering on the subdivision plan to be submitted to Council for the plan sealing
                      application must remain as shown on the Approved Plans.
               3.     The development must be undertaken and operated in a manner that causes no detrimental
                      effect upon the amenity of the neighbourhood by reason of the creation of excessive noise,
                      lighting nuisance or other emissions.
                      Currency Period
               4.     This development approval lapses if the use has not happened by 30 April 2025, unless an
                      application to extend the currency period is approved by Council.
                      Performance Bond
               5.     Prior to arranging a Prestart meeting for the operational works, a security bond in the form
                      of a cash bond or trading bank guarantee to the sum of $30,000 must be submitted to
                      Council, to secure the performance of all conditions of this approval. The cash bond or
                      trading bank guarantee will be returned on performance of the conditions of approval less
                      any costs incurred by Council in respect of enforcing performance of this permit. Council
                      reserves the right to call upon the bond or guaranteed sum to effect compliance with
                      conditions.
                      Dedication of Land as Reserve
               6.     The area identified as ‘Lot 100 Park’ on the approved plans must be dedicated to the Council
                      in fee simple on trust as a reserve for the purpose of an Environmental Park purposes.
                      Condition 6 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Works within Protected Land
               7.     The following works must be undertaken within the land to be dedicated to the Crown as a
                      reserve for the purpose of an Environmental Park and Lot 99 RP881300:
                      a.        The construction of a pathway in accordance with drawing number 2035-01 (master
                                Layout & SWMP Plan 1of 3) Rev E dated 16.04.2021.
                      b.        Rehabilitation of the park area within the proposed Lot 100 – Environmental Park.
                      c.        Revegetation of the riparian width only of the constructed waterway within proposed
                                Lot 100 and existing Lot 99 in RP881300.




                                                                                                        Page 2 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                  Print Date: 15 July 2021, 4:03 PM

Page 3

Noosa Council documents




                      New Roads
               8.     The new road shown on the Approved Plans must be constructed in accordance with the
                      conditions of this Decision Notice and dedicated as road reserve at no cost to Council. The
                      new road must join smoothly with the existing formation of Blue Wren Court. The works must
                      be undertaken in accordance with an Operational Works approval and be designed and
                      constructed in accordance with Council’s Planning Scheme Policy 6 – Engineering Design
                      Standards. The works must include in particular:
                      a.      a reserve width of 15 metres minimum and widened where necessary to encompass
                              the verge area around the cul-de-sac
                      b.      sealing, kerbing and channelling
                      c.      construction of pedestrian footpaths in accordance with the conditions of this Decision
                              Notice.
                      d.      provision of 3 indented parking spaces adjacent to proposed Lot 100 (Park)
                      e.      installation of street and pathway lighting
                      f.      a cul-de-sac with a circular turning area of sufficient size to accommodate the single
                              forward motion turn of a Waste Collection Vehicle (WCV) clear of private driveways on-
                              street parking and speed control devices.
               9.     The new road shown on the Approved Plans must be constructed in accordance with the
                      conditions of this Decision Notice and dedicated as road reserve at no cost to Council. The
                      new road must join smoothly with the existing formation of Blue Wren Court. The works must
                      be undertaken in accordance with an Operational Works approval and be designed and
                      constructed in accordance with Council’s Planning Scheme Policy 6 – Engineering Design
                      Standards. The works must include in particular:
                      a.      Installation of street lighting within the road reserve and where required on the pathway
                              between Lots 6 & 7 and Spotted Gum Court to ensure this pathway is appropriately lit.
                      Concrete Bin Pad
               10.    Concrete bin pads for Lots 7 - 11 must be constructed on the kerbside of the new road,
                      located proximate to the lot/lots it serves and generally in accordance with the approved
                      plans. The bin pads must be in accordance with an Operational Work approval and
                      sufficiently sized to wholly accommodate 2 wheelie bins for each lot.
                      Property Access and Driveways
               10.    A residential driveway must be constructed to Lot 3 -15. In regard to Lots 8 & 9 the access
                      must extend from the road formation to the end of the access handle/easement.
                      The works must be undertaken in accordance with an Operational Works approval.
               11.    Vehicle access to Lots 2 -15 is limited to the constructed driveway only. A clause must be
                      included in the contract of sale for Lots 2 -15 which requires vehicle access to be from the
                      constructed driveway only, and which prohibits the driveway from being relocated without
                      Council agreement.
                      Pedestrian and Bicycle Facilities
               12.    Pedestrian and bicycle facilities must be provided for the development. The works must be
                      undertaken in accordance with an Operational Works approval and must include in particular:
                      a.      2.0 metre wide footpaths as indicated on the approved plans within the new road
                              reserve and within the proposed Park
                      b.      a 2.0 metre wide footpath extending north thorough the adjoining Park to the footbridge
                      c.      a 2.0 metre wide footpath between proposed Lots 6 and 7 and extending to the south
                              along the pathway between Lots 39 and 40 SP305293 to the formation of Spotted Gum
                              Court. The works must include any necessary modifications to the existing storm pit
                              located in the pathway between Lots 39 and 40 SP305293.


                                                                                                         Page 3 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                   Print Date: 15 July 2021, 4:03 PM

Page 4

Noosa Council documents




                              The pathway must be
                                  i.   adequately lit
                                 ii.   turfed either side of the pathway
                                iii.   designed to ensure inhibit vehicle access
                      d.      a connection to the existing pathway on the southern side of Spotted Gum Court
                      e.      pram crossings on either side of Spotted Gum Court and where required on the new
                              road
                      Condition 12 is imposed pursuant to s145 of the Planning Act 2016 being non-trunk
                      infrastructure.
                      Stormwater Quality
               13.    Stormwater Quality Treatment must generally be in accordance with the Integrated Water
                      Management Plan revision 3 16 Lot Reconfiguration at Pearsons Road, Cooroy for Noosa
                      Council April 2021, except as follows:
                      a.      Gross Pollutant Traps are not approved. Alternative measures to achieve the pollutant
                              reduction predicted for the GPT’s must be provided.
                      b.      The first applicant for Operational Works submitted to this approval must include an
                              amended Integrated Water Management Plan (IWMP). The amended IWMP submitted
                              for approval must include an updated MUSIC model prepared in accordance with the
                              Healthy Land and Water, Water by design Music Modelling Guidelines, which
                              demonstrate the minimum pollution reduction targets of 80% reduction in Total
                              Suspended Solids, 60% reduction in Total Phosphorous and 45% reduction in Total
                              Nitrogen are achievable by the detail design, required by this approval.
                      c.      Pollutant reduction target calculations must include pollutant reductions obtained for
                              Catchment F
                      d.      Appendix 1 of the amended IWMP must clearly outline special design elements, such
                              as roof water connections to kerb required by any building or plumbing design to
                              achieve the minimum pollutant reduction target for the development.
                      e.      Deleted.
                      f.      Deleted.
               14.    The Operational Works Application must demonstrate that the design for water quality
                      treatment features are consistent with the technical design guideline published by Healthy
                      Land and Water, Water by Design for the feature. (eg. For Bioretention Basins: Bioretention
                      Technical Design Guidelines (October 2014) and for Wetland Systems the Wetland
                      Technical Design Guideline (May 2017).
               15.    Permanent educational signage provided in must be erected to educate the residents of the
                      development about the function of the bioretention device(s). The dimensions, standard,
                      presentation and location of the educational signage materials and colour schemes must be
                      consistent with Noosa’s Design Principals and in accordance with an Operational Works
                      approval.
                      Stormwater Quantity and Flooding
               16.    In conjunction with the submission of a development application for Operational Works,
                      provide final design details for the stormwater detention system and updated modelling. The
                      detention system is to be based generally on the approach documented in Flood Assessment
                      Report Revision 3, prepared by Callaghan and Toth, dated April 2021 and is to address the
                      following points:
                      a.      Any updates required for consistency with the amended approved Integrated Water
                              Management Plan.




                                                                                                      Page 4 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                Print Date: 15 July 2021, 4:03 PM

Page 5

Noosa Council documents




                      b.      Updated modelling is to be based on basin routing procedures (as described in QUDM
                              Section 5.6.2), with full details of the basin outlet structure provided.
                      c.      Analysed durations, (for which no increase in peak flows is to be achieved for the post
                              development condition compared to pre-development), are to include the critical
                              durations for the waterway through the urban areas of Cooroy downstream of the site.
                      d.      The design is to achieve the Waterway Stability design objective of the SPP Appendix
                              2 Code: Water Quality, which requires the peak 1-year ARI event discharge within the
                              receiving waterway to be limited to the pre-development peak 1-year ARI discharge
                              Stormwater Drainage 1.
               17.    The site must be provided with a stormwater drainage system connecting to a lawful point of
                      discharge. The works must be undertaken in accordance with an Operational Works approval
                      and the Queensland Urban Drainage Manual, and must include in particular registration of
                      drainage easements (where relevant) and the use of gravity stormwater drainage and not
                      surcharge pits.
               18.    The surface levels of all lots (excluding drainage reserves) must be constructed to provide
                      flood immunity. The works must be undertaken in accordance with an Operational Works
                      approval and must include in particular surface levels that are higher than each of the
                      following: (a) the local 1%AEP flood level at year 2100 (plus freeboard) (b) the regional
                      1%AEP flood level at year 2100 (plus freeboard)
                      Services
               19.    Underground reticulated electricity and telecommunication services must be provided to
                      each lot in accordance with an approval for Operational Works and the standards and
                      requirements of the relevant service provider.
               20.    Unless otherwise stipulated by telecommunications legislation at the time of construction, the
                      development must be provided with all necessary conduits, pits and pipes to accommodate
                      the future connection of optic fibre technology telecommunications.
               21.    Certification must be submitted to Council from all relevant service providers (Energex, NBN
                      and Unitywater) which certifies that the development has met the requirements of this
                      Decision Notice and all applicable legislation at the time of construction.
                      Easements
               22.    An easement for drainage purposes must be registered against the title of proposed Lot 8 in
                      favour of proposed lots 9 and 16, Lot 2 on RP113733 and Lot 1 on RP113733. However,
                      should the owners of either or both Lots 1 and 2 on RP113733 not agree in writing to the
                      execution of the Easement document within 60 days of a written request from the applicant;
                      the Easement can be prepared to benefit Noosa Shire Council.
                      The term of the easement must place the maintenance responsibilities on the grantor.
               23.    An easement for drainage purposes must be registered against the title of proposed Lot 10
                      in favour of Lot 1 on RP113733. However, should the owners of Lot 1 on RP113733 not
                      agree in writing to the execution of the Easement document within 60 days of a written
                      request from the applicant; the Easement can be prepared to benefit Noosa Shire Council.
                      The term of the easement must place the maintenance responsibilities on the grantor.
               24.    Unless otherwise agreed in writing by the relevant service provider, any public or third party
                      infrastructure located on the subject site must be placed within an easement registered
                      against the title of the property.
               25.    All easements must be designed in accordance with the planning scheme and granted at no
                      cost to the Grantee. Where the Grantee is Council or a service authority, the easement
                      documentation must be in accordance with the Grantee’s standard easement terms. Draft
                      easement documentation must be submitted to Council for endorsement.
               26.    All works must be kept clear of any existing or proposed easements on the subject land,
                      unless agreed otherwise in writing by the Grantee.


                                                                                                       Page 5 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                 Print Date: 15 July 2021, 4:03 PM

Page 6

Noosa Council documents




                      Earthworks and Retaining Walls
               27.    All earthworks and associated batters must be undertaken in accordance with an Operational
                      Works approval, and contained entirely within the subject site unless written permission from
                      the respective landowner(s) is provided to Council.
               28.    Any retaining walls/structures must be wholly contained thin the lot they support.
               29.    All retaining walls must be designed and constructed in accordance with the planning scheme
                      and must be certified by an RPEQ where exceeding 1.0m in height. All retaining walls that
                      are publicly accessible and exceed 1.0m in height must be fitted with a commercial grade
                      safety fence.
                      Damage to Services and Assets
               30.    Any damage caused to existing services and assets as a result of the development works
                      must be repaired at no cost to the asset owner at the following times:
                      a.      where the damage would cause a hazard to pedestrian or vehicle safety, immediately;
                              or
                      b.      where otherwise, upon completion of the works associated with the development.
                      Any repair work which proposes to alter the alignment or level of existing services and assets
                      must first be referred to the relevant service authority for approval.
                      Landscaping Works
               31.    The development site must be landscaped. The work must be undertaken in accordance with
                      an Operational Works approval and the Noosa Plan for that specific area and must include
                      in particular:
                      a.      Provision of 15 street trees along the frontage of the Lots with a minimum pot size of
                              45 litres planted within the road reserve, excluding the head of the cul-de-sac.
               32.    Deleted.
               33.    All landscape works must be maintained generally in accordance with the approved design
                      for the life of the development.
                      Fauna Management
               34.    Vegetation must only be removed or disturbed in accordance with a Fauna Management
                      Plan (or part thereof) prepared by a qualified person* and endorsed through an Operational
                      Works approval.
                      *(Refer to Advisory Note)
                      Vegetation Management
               35.    An arborist’s report is to be submitted for approval as part of the operational works
                      application. The purpose of the arborist’s report is to identify the native vegetation to be
                      retained on site, whilst recognising the need for vegetation clearing to occur in order to carry
                      out the development. The vegetation to be retained must be clear of proposed services, not
                      present a nuisance to neighbouring properties and be generally suitable for the proposed
                      location. The report is to be prepared by a suitably qualified person*.
                      (*Refer Advisory Note)
                      Rehabilitation works of Waterway and Park
               36.    Rehabilitation works must be undertaken in accordance with an Operational Works approval
                      and Planning Scheme Policy - PSP 2 Landscaping. An ecological rehabilitation plan must be
                      submitted, prepared by a suitably qualified person* (* refer Advisory Notes) for the waterway
                      and park area and must include in particular:




                                                                                                        Page 6 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                  Print Date: 15 July 2021, 4:03 PM

Page 7

Noosa Council documents




                      a.      Rehabilitation of the Waterway – the area to be rehabilitated must be generally 5m
                              form the centreline of the waterway; from the new road south of Lot 15 to the creek in
                              Lot 99 in RP881300 as shown on drawing number 2035-01 (Master Layout & SWMP
                              Plan 1 of 3) Rev E dated 16.04.2021.
                      b.      Mature vegetation within the waterway corridor must be retained in situ if possible,
                              unless required to be removed for the construction of the natural channel (waterway)
                              south of Lot 15, or where vegetation poses a risk. Where vegetation is required to be
                              removed to reduce safety risks this request is to be supported by a written report from
                              a qualified person
                      c.      Retention of existing bed and banks of the waterway unless required to be modified to
                              ensure function of the approved stormwater system, which may include reshaping into
                              a vegetated swale with stone low flow base and vegetated banks with coir mesh.
                      d.      The waterway must be rehabilitated to reflect natural function and form, and include
                              riffles and ponds to provide variability in flow depth and refugia for fauna to live in during
                              dry periods.
                      e.      details of the treatment to all batters, armoury, plantings, weed treatment, location of
                              services/utilities and rehabilitation.
                      f.      Retention of significant trees within the park area to provide roost and forage values
                              for fauna, whilst ensuring a monoculture of Gympie Messmates (Eucalyptus cloeziana)
                              is not retained.
                      g.      Revegetation of the park area, including the detention basin, ensuring plantings
                              maintain sufficient separation from the proposed pathway in the park, using a
                              staggered growth forms, grading from grasses , shrubs through to trees either side of
                              the pathway, where applicable.
                      h.      a species palette and densities table incorporating the species selection of only native
                              local species suitable for the site
                      i.      a maintenance period of no less than 3 years for the park area (Lot 100 and waterway
                              area in Lot 99)
                      j.      measurable and achievable criteria on which the performance of the floristic and
                              structural component of the re-vegetation strategy can be assessed annually over three
                              years, including no weeds at the end of the rehabilitation period
                      k.      control of all weeds species listed in the following standards and legislation:
                              i.       Scheduled plants under the Noosa Biosecurity Plan 2020
                              ii.      Undesirable Plant Species listed in Table SC6.3.5.1 of the Planning Scheme
                                       Policy 2 Landscaping of the Noosa Plan 2020
                              iii.     Council Listed Environmental Weeds, Exotic Grasses and other plants identified
                                       in writing by Council
               37.    All rehabilitation and re-vegetation of the waterway and park must be completed prior to
                      Council endorsement of the Plan of Survey.




                                                                                                             Page 7 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                       Print Date: 15 July 2021, 4:03 PM

Page 8

Noosa Council documents




               5.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status          Referral Agency and Referral Trigger                    Response
                                         Address

                Concurrence              SARA at DILGP SARA         Schedule 10, Part 9,         The agency provided its
                                         at DILGP Via MyDAS2        Division 4, Subdivision 2,   response on
                                         at https://prod2.dev-      Table 1, Item 1              4 November 2020
                                         assess.qld.gov.au/suite    (10.9.4.2.1.1)—              (Reference No. 2010-
                                         / (for assistance,         Reconfiguring a lot within   19147 SRA). A copy of
                                         contact DILGP at 5352      25m of a state transport     the response is
                                         9701 or                    corridor (Planning           attached
                                         email:SEQNorthSARA         Regulation 2017)
                                         @dilgp.qld.gov.au

                                                                    Schedule 10, Part 9,         The agency provided its
                                                                    Division 4, Subdivision 2,   response on
                                                                    Table 3, Item 1              4 November 2020
                                                                    (10.9.4.2.3.1)—              (Reference No. 2010-
                                                                    Reconfiguring a lot within   19147 SRA). A copy of
                                                                    100m of a state-             the response is
                                                                    controlled road              attached
                                                                    intersection (Planning
                                                                    Regulation 2017)
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Co-ordination of Operational Works Assessment
               2.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               3.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction.
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased.
                              iii.     proposed fencing to the site during the construction phase of the development.
                              iv.      approval of the Traffic Management Control Plan by the Department of Transport
                                       and Main Roads (DTMR) for any works on State controlled roads.
                              v.       provision for worker car parking.




                                                                                                           Page 8 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                     Print Date: 15 July 2021, 4:03 PM

Page 9

Noosa Council documents




                      b.      maintenance and protection of water quality and existing drainage lines through the
                              construction site, through the implementation of appropriate erosion and sediment
                              control measures
                      c.      works programme identifying key components of the works and their respective
                              durations
                      d.      establishment of a communication protocol with the general public, adjoining owners,
                              emergency services and local businesses to advise of agreed construction times,
                              impacts on traffic, services and other relevant issues
                      e.      Include a post out to the local residents and businesses advising of the proposed
                              development, the expected time frames and the site contact details.
                      f.      Include signage in prominent locations on the boundaries of the site advising of the
                              proposed development, the expected time frames and the site contact details.
                      g.      identification of complaint management procedures including:
                              i.       contact details for the on-site manager
                              ii.      dispute resolution procedures
                      h.      details on the location of external fill sites/sources, the haulage route, type of vehicle
                              to be utilised during filling operations and frequency of usage. NB any damage to the
                              existing road system as a result of haulage operations shall be fully repaired at the
                              applicant’s expense
                      i.      it is acknowledged that the preliminary Construction Management Plan will be a draft
                              document requiring finalisation upon appointment of the Principal Contractor employed
                              to construct the works and a final document will be required to be submitted at the Pre-
                              Start Meeting for the project.
                      Infrastructure Charges
               4.     All developments and/or changes to existing developments may require payment of
                      “Infrastructure Charges” (as applicable) in accordance with Council’s “Charges Resolution”
                      made pursuant to the planning legislation and regulations current at the time of issue. For
                      further       information,     please        refer to https://www.noosa.qld.gov.au/planning-
                      development/development-tools-guidelines/infrastructure-charges
                      Qualified Person
               5.     For the purpose of preparing a Landscape Plan, a qualified person is considered to be a
                      landscape architect, landscape designer and/or horticulturist with a minimum of 3 years
                      current experience in the field of landscape design.
               6.     For the purpose of preparing an Arborist Report, a qualified person is considered to be a
                      person with either:
                      a.      ISA certification; or
                      b.      a Diploma of Arboriculture; and
                      c.      a minimum of 3 years current experience in the field of arboriculture.
               7.     For the purpose of preparing a Rehabilitation Plan, a qualified person is considered to be a
                      landscape architect, Environmental Engineer or ecologist with a minimum of 3 years current
                      experience in the field of landscape design.
               8.     For the purpose of preparing a Fauna Management Plan, a qualified person is considered to
                      be an ecologist with a minimum of 3 years current experience in the field of fauna assessment
                      and management.




                                                                                                          Page 9 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                    Print Date: 15 July 2021, 4:03 PM

Page 10

Noosa Council documents




               7.     PROPERTY NOTES

               The following property notes will be placed against the subject property in Council’s property record
               system:
                      RAL20/0021 - Property Access Driveway
               1.     The following notation applies to approved lots 2 - 15:
                      To ensure that the integrity of the Council infrastructure in the road reserve is preserved,
                      vehicle access to this lot must be from the constructed driveway only unless otherwise
                      approved by Council (refer to Council Approval RAL20/0021).
                      RAL20/0021 - Concrete Bin Pad
               2.     The following notation applies to approved lots 7 - 11
                      A concrete bin pad for this lot has been constructed on the kerbside in front of the Lots. Bins
                      must be placed on the concrete bin pad on collection day.
                      RAL20/0021 – Property Access Lot 11
               3.     The following notation applies to Lot 11
                      No vehicle is to be obtained from Pearson Rd.
                      RAL20/0021 – Stormwater Quality
               4.     Where applicable the following notation applies to affected properties.
                      Additional detail design measures must be implemented to achieve the minimum stormwater
                      pollutant reduction targets.
               8.     VARIATION APPROVAL DETAILS

               Not applicable.
               9.     FURTHER DEVELOPMENT PERMITS REQUIRED

                Type of Development Permit Required              Subject of the required Development Permit

                Development Permit for Operational Works         Road work, Stormwater,          Drainage work,
                                                                 Earthworks, Landscaping,         Electrical and
                                                                 Vegetation Clearing.

               10.    SUBMISSIONS

               Not applicable.
               11.    RIGHTS OF APPEAL

               You are entitled to appeal against this decision. A copy of the relevant appeal provisions from the
               Planning Act 2016 is attached.
               During the appeal period, you as the applicant may suspend your appeal period and make written
               representations to Council about the conditions contained within the development approval. If
               Council agrees or agrees in part with the representations, a negotiated decision notice will be
               issued. Only one negotiated decision notice may be given.
               12.    OTHER DETAILS

               If you wish to obtain more information about the decision, electronic copies are available on line at
               www.noosa.qld.gov.au or at Council Offices.




                                                                                                      Page 10 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                 Print Date: 15 July 2021, 4:03 PM

Page 11

Noosa Council documents




               Yours faithfully,




               Patrick Murphy
               Coordinator Planning



               Enc:      Appeal Rights

               cc.       [email protected])




               DECISION NOTICE HISTORY
                    Original Decision Notice – 30 April 2021.
                    Negotiated Decision Notice – 9 July 2021, with an amendment to conditions 7, 8e, 10, 13b, 13d, 22, 23, 31a, and 36a, b, and c.
                     and delete conditions 13e, 13f and 32




                                                                                                                                 Page 11 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                                            Print Date: 15 July 2021, 4:03 PM

Page 12

Noosa Council documents




                                       Referral Agency Response
                                       PLANNING ACT 2016 & PLANNING REGULATION 2017




                                                                                      Page 12 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                  Print Date: 15 July 2021, 4:03 PM

Page 13

Noosa Council documents




                                       Page 13 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021   Print Date: 15 July 2021, 4:03 PM

Page 14

Noosa Council documents




                                       Page 14 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021   Print Date: 15 July 2021, 4:03 PM

Page 15

Noosa Council documents




                                       Page 15 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021   Print Date: 15 July 2021, 4:03 PM

Page 16

Noosa Council documents




                                       Page 16 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021   Print Date: 15 July 2021, 4:03 PM

Page 17

Noosa Council documents




                                       Page 17 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021   Print Date: 15 July 2021, 4:03 PM

Page 18

Noosa Council documents




                                       Page 18 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021   Print Date: 15 July 2021, 4:03 PM

Page 19

Noosa Council documents




                                                                              Appeal Rights
                                                                              PLANNING ACT 2016 & PLANNING REGULATION 2017




               Chapter 6 Dispute resolution                                                   (3) The appellant or, for an appeal to a tribunal, the registrar must,
                                                                                                  within the service period, give a copy of the notice of appeal to –
               Part 1 Appeal rights
                                                                                                  (a) the respondent for the appeal; and
               229 Appeals to tribunal or P&E Court
                                                                                                  (b) each co-respondent for the appeal; and
               (1) Schedule 1 of the Planning Act 2016 states –
                                                                                                  (c) for an appeal about a development application under schedule
                   (a) Matters that may be appealed to –
                                                                                                      1, table 1, item 1 – each principal submitter for the
                         (i)   either a tribunal or the P&E Court; or                                 development application; and
                         (ii) only a tribunal; or                                                 (d) for and appeal about a change application under schedule 1,
                                                                                                      table 1, item 2 – each principal submitter for the change
                         (iii) only the P&E Court; and
                                                                                                      application; and
                   (b) The person-
                                                                                                  (e) each person who may elect to become a co-respondent for the
                         (i)   who may appeal a matter (the appellant); and                           appeal, other than an eligible submitter who is not a principal
                                                                                                      submitter in an appeal under paragraph (c) or (d); and
                         (ii) who is a respondent in an appeal of the matter; and
                                                                                                  (f)   for an appeal to the P&E Court – the chief executive; and
                         (iii) who is a co-respondent in an appeal of the matter; and
                                                                                                  (g) for an appeal to a tribunal under another Act – any other
                         (iv) who may elect to be a co-respondent in an appeal of the
                                                                                                      person who the registrar considers appropriate.
                              matter.
                                                                                              (4) The service period is –
               (2) An appellant may start an appeal within the appeal period.
                                                                                                  (a) if a submitter or advice agency started the appeal in the P&E
               (3) The appeal period is –
                                                                                                      Court – 2 business days after the appeal has started; or
                   (a) for an appeal by a building advisory agency – 10 business
                                                                                                  (b) otherwise – 10 business days after the appeal is started.
                       days after a decision notice for the decision is given to the
                       agency; or                                                             (5) A notice of appeal given to a person who may elect to be a co-
                                                                                                  respondent must state the effect of subsection (6).
                   (b) for an appeal against a deemed refusal – at any time after the
                       deemed refusal happens; or                                             (6) A person elects to be a co-respondent by filing a notice of election,
                                                                                                  in the approved form, within 10 business days after the notice of
                   (c) for an appeal against a decision of the Minister, under chapter
                                                                                                  appeal is given to the person.
                       7, part 4, to register premises or to renew the registration of
                       premises – 20 business days after a notice us published under          231 Other appeals
                       section 269(3)(a) or (4); or
                                                                                              (1) Subject to this chapter, schedule 1 and the P&E Court Act, unless
                   (d) for an appeal against an infrastructure charges notice – 20                the Supreme Court decides a decision or other matter under this
                       business days after the infrastructure charges notice is given             Act is affected by jurisdictional error, the decision or matter is non-
                       to the person; or                                                          appealable.
                   (e) for an appeal about a deemed approval of a development                 (2) The Judicial Review Act 1991, part 5 applies to the decision or
                       application for which a decision notice has not been given –               matter to the extent it is affected by jurisdictional error.
                       30 business days after the applicant gives the deemed
                                                                                              (3) A person who, but for subsection (1) could have made an
                       approval notice to the assessment manager; or
                                                                                                  application under the Judicial Review Act 1991 in relation to the
                   (f)   for any other appeal – 20 business days after a notice of the            decision or matter, may apply under part 4 of that Act for a
                         decision for the matter, including an enforcement notice, is             statement of reasons in relation to the decision or matter.
                         given to the person.
                                                                                              (4) In this section –
               Note –                                                                             decision includes-
                   See the P&E Court Act for the court’s power to extend the appeal
                                                                                                  (a) conduct engaged in for the purpose of making a decision; and
                   period.
                                                                                                  (b) other conduct that relates to the making of a decision; and
               (4) Each respondent and co-respondent for an appeal may be heard
                   in the appeal.                                                                 (c) the making of a decision or failure to make a decision; and
               (5) If an appeal is only about a referral agency’s response, the                   (d) a purported decision; and
                   assessment manager may apply to the tribunal or P&E Court to
                                                                                                  (e) a deemed refusal.
                   withdraw from the appeal.
                                                                                                  non-appealable, for a decision or matter, means the decision or
               (6) To remove any doubt. It is declared that an appeal against an
                                                                                                  matter-
                   infrastructure charges notice must not be about-
                                                                                                  (a) is final and conclusive; and
                   (a) the adopted charge itself; or
                                                                                                  (b) may not be challenged, appealed against, reviewed, quashed,
                   (b) for a decision about an offset or refund-
                                                                                                      set aside or called into question in any other way under the
                         (i)   the establishment cost of trunk infrastructure identified in           Judicial Review Act 1991 or otherwise, whether by the
                               a LGIP; or                                                             Supreme Court, another court, a tribunal or another entity; and
                         (ii) the cost of infrastructure decided using the method                 (c) is not subject to any declaratory, injunctive or other order of
                              included in the local government’s charges resolution.                  the Supreme Court, another court, a tribunal or another entity
                                                                                                      on any ground.
               230 Notice of appeal
                                                                                              232 Rules of the P&E Court
               (1) An appellant starts an appeal by lodging, with the registrar of the
                   tribunal or P&E Court, a notice of appeal that-                            (1) A person who is appealing to the P&E Court must comply with the
                                                                                                  rules of the court that apply to the appeal.
                   (a) is in the approved form; and
                   (b) succinctly states the grounds of the appeal.                           (2) However, the P&E Court may hear and decide an appeal even if
                                                                                                  the person has not complied with the rules of the P&E Court
               (2) The notice of appeal must be accompanied by the required fee.




                                                                                                                                                 Page 19 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                                                           Print Date: 15 July 2021, 4:03 PM

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.