               5.     REFERRAL AGENCIES

               The referral agencies applicable to this application are:

                Referral Status          Referral Agency and Referral Trigger                    Response
                                         Address

                Concurrence              SARA at DILGP SARA         Schedule 10, Part 9,         The agency provided its
                                         at DILGP Via MyDAS2        Division 4, Subdivision 2,   response on
                                         at https://prod2.dev-      Table 1, Item 1              4 November 2020
                                         assess.qld.gov.au/suite    (10.9.4.2.1.1)—              (Reference No. 2010-
                                         / (for assistance,         Reconfiguring a lot within   19147 SRA). A copy of
                                         contact DILGP at 5352      25m of a state transport     the response is
                                         9701 or                    corridor (Planning           attached
                                         email:SEQNorthSARA         Regulation 2017)
                                         @dilgp.qld.gov.au

                                                                    Schedule 10, Part 9,         The agency provided its
                                                                    Division 4, Subdivision 2,   response on
                                                                    Table 3, Item 1              4 November 2020
                                                                    (10.9.4.2.3.1)—              (Reference No. 2010-
                                                                    Reconfiguring a lot within   19147 SRA). A copy of
                                                                    100m of a state-             the response is
                                                                    controlled road              attached
                                                                    intersection (Planning
                                                                    Regulation 2017)
               6.     ADVISORY NOTES

               The following notes are included for guidance and information purposes only and do not form part
               of the assessment manager conditions:
                      Building and Construction Industry (Portable Long Service Leave) Levy
               1.     The QLeave levy must be paid prior to the issue of a development permit where it is required.
                      Council will not be able to issue a Decision Notice without receipt of details that the Levy has
                      been paid.
                      Co-ordination of Operational Works Assessment
               2.     Additional application fees apply to Operational Work applications where the different
                      aspects of the works are lodged separately. Significant savings in application fees will result
                      if all works are lodged in a single application.
                      Preparation of a Preliminary Construction Management Plan
               3.     A preliminary Construction Management Plan must be submitted with the Operational Works
                      application and must address the following:
                      a.      traffic management during all aspects of the construction phase including:
                              i.       a Traffic Management Control Plan in accordance with the Manual of Uniform
                                       Traffic Control Devices (MUTCD) detailing all temporary signage and traffic
                                       control measures prior to construction.
                              ii.      maintenance of safe pedestrian access for the areas affected by the works during
                                       and after daily construction has ceased.
                              iii.     proposed fencing to the site during the construction phase of the development.
                              iv.      approval of the Traffic Management Control Plan by the Department of Transport
                                       and Main Roads (DTMR) for any works on State controlled roads.
                              v.       provision for worker car parking.




                                                                                                           Page 8 of 19
Document Set ID: 21492011
Version: 6, Version Date: 15/07/2021                                                                     Print Date: 15 July 2021, 4:03 PM
Log in to download the original file

RAL20-0021 Bulk_20210715160345.pdf · 427 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.