Our Ref: 127-003-001L




                                                                                               PO BOX 26
                                                                                        BUDERIM QLD 4556
21st September 2016

Martoo Consulting
13/6 Bottlebrush Avenue
NOOSA HEADS QLD 4567

Attention: Nadine Gorton

Dear Nadine,

COMO GLASSHOUSE – 271 & 305 LAKE MACDONALD DRIVE, COOROY
OPERATIONAL WORKS DESIGN SUPPORTING ENGINEERING PLANS
CERTIFIED DRAWINGS

ERSCON has prepared RPEQ certified Civil Engineering Plans to accompany an Operational Works
Application as per our proposal dated 4th May 2016. The Civil Engineering Plans (refer attached) have
been prepared to address the following Council conditions:

Condition 8 - An access driveway to service the agricultural use must be provided extending from
the formation of Lake Macdonald Drive to the greenhouse. The works must be undertaken in
accordance with an Operational Works approval and must include in particular:
    a. a. an access and internal driveway generally in accordance with the report prepared by TTM
        Consulting Pty Ltd dated 2 July 2015 reference 15SCT0024.
    b. a driveway constructed with a suitable “all weather” surface that can cater for the effects of
        occasional inundation by flood waters as required by the approved Flood Management Plan.
    c. driveway designed to a minimum level of 92.0m AHD.

Condition 16 - Bund 3 as indicated on Site Layout Plan drawn by Water Technology and dated
01/07/2015 must be relocated a minimum of 5m away from the root zones of the existing vegetation
adjacent the creek. The new bund and area between it and the waterway shall be revegetated with
suitable species and densities in accordance with Planning Scheme Policy 3 – Landscaping Plants
& Guidelines.

Condition 17 - The small dam to the north of the greenhouse structure must be relocated further
south and away from riparian vegetation in accordance with the Flood Impact Assessment Version
V02 dated March 2016 prepared by Water Technology and the disturbed areas between the
relocated dam and the adjacent creek must be revegetated with suitable species and densities in
accordance with Planning Scheme Policy 3 – Landscaping Plants and Guidelines.

Should you have any questions relating to the above, please don’t hesitate to contact the undersigned.

Yours faithfully



Heath Jones
Principal Engineer/Director (RPEQ 16187)

Encl.
RPEQ Certified Drawings (127-003-C01 to 127-003-C08)




ERSCON Consulting Engineers
PO Box 7890 Cairns QLD 4870 | PO Box 26 Buderim QLD 4556 | PO BOX 4228 Balwyn East, VIC 3103       Page 1
ABN 95 167 415 474
Log in to download the original file

ERSCON Cover letter.PDF · 112 KB (small file)

Searchable page text hides email addresses. Original files are unchanged and may show email addresses.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.