Erosion Control Matting and Permanent Stabilisation
Exposed areas onsite should be permanently stabilised (i.e. with turf) as the construction works progress.
Erosion control matting or mulching should be used as a temporary measure to stabilise exposed areas before
permanent stabilisation can be undertaken.
Monitoring
Monitoring and recording of the performance of the drainage control devices are to be undertaken in
accordance with local government requirements. It is further recommended that the proposed construction
works be undertaken during periods of dry weather to reduce the potential for sediment to be transported off-
site during construction.
31 July 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.