Council archive · source document
App C - Engineering Report · MCU25/0118
ABN 51 640 311 842
CONTACT
arcosgroup.com.au
OFFICES
Sunshine Coast | Brisbane | Gold Coast
FIGURE 2: DEVELOPMENT LAYOUT PLAN (SOURCE: ARCOS GROUP)
3.0 Site Access
The site shall be accessed via a new crossover to the new (currently not yet constructed) subdivision
road along the eastern boundary, which shall be built as part OPW/25/0057. The new crossover will be
a ‘General Wide’ arrangement built to Council and IPWEA standards, and can be seen in the concept
civil engineering drawings (refer Appendix A).
3.1 Sight Distances
There are no permanent sight obstructions for vehicles exiting the driveway, nor to the new subdivision
road intersection with existing Dianella Court (to the north east of the site). Therefore no sight distance
issues are present.
3.2 Parking
In line with Council’s planning scheme (Table 9.4.1.4) the development proposes to provide the
following mix of resident car parking spaces:
• 25 Covered Spaces
• 6 Vistor Spaces, of which 2 are designated as PWD
• 31 Total Car Parking Spaces
31 July 2025
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
App C - Engineering Report.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.2 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.