Skip to the record
Accept no imitations.

Council archive · source document

App C - Engineering Report · MCU25/0118

of 15

Text shows just the words. Original shows the document exactly as it was published.

                                                                                             ABN 51 640 311 842
                                                                                                       CONTACT
                                                                                               arcosgroup.com.au
                                                                                                        OFFICES
                                                                           Sunshine Coast | Brisbane | Gold Coast




5.0 Service Provisions
5.1     Potable Water & Sewer
A new potable water main along with a new sewer main and property service will be provided to the lot
within the future adjacent road reserve by the surrounding subdivision. As such the existing service
shall be utilised by the development.

5.2     Communications & Electrical
Details of electrical supply and communication infrastructure and services proposed for the
development site are outside the scope of this report. However, we understand that supply to the
development can be provided via an extension to the adjacent underground electricity network.



6.0 Conclusion
This Engineering Services Report has been prepared to provide a review and information on the
Engineering requirements to support the application for MCU on the proposed development at 62 Lake
MacDonald Drive, Cooroy (Lot 105 on SP118458). The following requirements have been reviewed as
part of this report:
•   Suitable access can be provided off the future subdivision road;
•   Minimum site distance can be achieved by the development;
•   A total of 31 parking spaces shall be provided;
•   The development can be servied by a WCV;
•   The site is not impacted by flooding or significant external catchments;
•   The surrounding subdivision is providing stormwater quality management;
•   On-site detention shall be provided to cater for stormwater quantity management;
•   Sewerage reticulation can be connected to the future Unitywater network; and
•   Water reticulation can be connected to the future Unitywater network.
In summary, this report shows that the development site can be adequately serviced and provision
made as currently shown and in further detailed design for this development to be in accordance with
Council's code requirements.




31 July 2025

Used in these records

About this file

File size
2.2 MB (large file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

App C - Engineering Report.pdf · 2.2 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.