Minor Change Existing Approval OPW22/0273.02
Plan No. Rev. Plan/Document Name Date
3847-01A Stormwater Calculations prepared by 24 January 2023
AAA Design and Development Pty Ltd
as annotated by Council
CURRENCY PERIOD
2. The Currency Period for this development approval lapses if the development has not
substantially started by 13 March 2025, unless an application to extend the currency period
is approved by Council.
SITE SPECIFIC CONDITIONS
3. The works required by the permit must be completed and accepted by Council by the
3 November 2023.
Until the works have been completed and accepted by Council the following property notation
or similar will be placed on Council’s rates records for the subject property:
The vehicle access to the property does not comply with Council's Local Laws and requires
upgrading.
4. A site control and/or compliance bond of $2500 is to be submitted to Council prior to the pre-
start meeting. The pre-start meeting will only be held once Council's Construction
Engineering Officer has confirmation that the bond monies have been received by Council.
The bond will be refunded less any costs incurred by Council in ensuring compliance with
these conditions or any additional inspections incurred for substandard work or work
undertaken not in accordance with this permit.
5. The works must include reshaping of the verge areas on either side of the driveway to ensure
that there is no ponding of water and flows are not directed on to the road formation
6. The constructed works (driveway and verge reshaping) must convey the overland flows from
the upstream catchment for all rain events up to and including the 1%AEP event at the year
2100 (20% increase in current rainfall intensities)
7. The constructed works (driveway and verge reshaping) must not create additional ponding
of stormwater within the frontage of No 14 Grosvenor Terrace for all rain events up to and
including the 1%AEP event at the year 2100 (20% increase in current rainfall intensities)
8. Prior to the pouring of the concrete for the modified section of the driveway certification must
be submitted to Council from a Registered Professional Engineer of Queensland that states
that works will achieve compliance with the conditions of this permit.
GENERAL CONDITIONS
Engineering
9. A condition report including photographs of the frontage of the site must be completed and
submitted to Council at the prestart meeting.
10. The principal contractor must have all the appropriate insurance and public liability
documentation to carry out the works. The principal contractor is also responsible to ensure
that any subcontractors also have the appropriate insurance and public liability
documentation. Certificates demonstrating currency of public liability insurance and works
insurance covering the works must be submitted to Council prior to the prestart meeting.
11. Council must be contacted at least 5 working days prior to any works commencing to
organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
pre-start meeting must include the relevant parties for the following aspects of the works:
a. Civil engineering works (RPEQ);
b. Principal contractor
Page 2 of 7
Document Set ID: 22624275
Version: 2, Version Date: 19/10/2023
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Minor Change Existing Approval OPW22/0273.02.pdfRelated documentApplication case desk ↗
About this file
- File size
- 160 KB (small file)
- File type
No other editions are linked here.