Minor Change Existing Approval OPW22/0273.02

of 7

Text shows just the words. Original shows the document exactly as it was published.

                        Plan No.             Rev.    Plan/Document Name                      Date

                        3847-01A                     Stormwater Calculations prepared by 24 January 2023
                                                     AAA Design and Development Pty Ltd
                                                     as annotated by Council

               CURRENCY PERIOD
               2.     The Currency Period for this development approval lapses if the development has not
                      substantially started by 13 March 2025, unless an application to extend the currency period
                      is approved by Council.
               SITE SPECIFIC CONDITIONS
               3.     The works required by the permit must be completed and accepted by Council by the
                      3 November 2023.
                      Until the works have been completed and accepted by Council the following property notation
                      or similar will be placed on Council’s rates records for the subject property:
                      The vehicle access to the property does not comply with Council's Local Laws and requires
                      upgrading.
               4.     A site control and/or compliance bond of $2500 is to be submitted to Council prior to the pre-
                      start meeting. The pre-start meeting will only be held once Council's Construction
                      Engineering Officer has confirmation that the bond monies have been received by Council.
                      The bond will be refunded less any costs incurred by Council in ensuring compliance with
                      these conditions or any additional inspections incurred for substandard work or work
                      undertaken not in accordance with this permit.
               5.     The works must include reshaping of the verge areas on either side of the driveway to ensure
                      that there is no ponding of water and flows are not directed on to the road formation
               6.     The constructed works (driveway and verge reshaping) must convey the overland flows from
                      the upstream catchment for all rain events up to and including the 1%AEP event at the year
                      2100 (20% increase in current rainfall intensities)
               7.     The constructed works (driveway and verge reshaping) must not create additional ponding
                      of stormwater within the frontage of No 14 Grosvenor Terrace for all rain events up to and
                      including the 1%AEP event at the year 2100 (20% increase in current rainfall intensities)
               8.     Prior to the pouring of the concrete for the modified section of the driveway certification must
                      be submitted to Council from a Registered Professional Engineer of Queensland that states
                      that works will achieve compliance with the conditions of this permit.
               GENERAL CONDITIONS
                      Engineering
               9.     A condition report including photographs of the frontage of the site must be completed and
                      submitted to Council at the prestart meeting.
               10.    The principal contractor must have all the appropriate insurance and public liability
                      documentation to carry out the works. The principal contractor is also responsible to ensure
                      that any subcontractors also have the appropriate insurance and public liability
                      documentation. Certificates demonstrating currency of public liability insurance and works
                      insurance covering the works must be submitted to Council prior to the prestart meeting.
               11.    Council must be contacted at least 5 working days prior to any works commencing to
                      organise a prestart. The contact number to arrange a pre-start meeting is 5329 6500. The
                      pre-start meeting must include the relevant parties for the following aspects of the works:
                      a.      Civil engineering works (RPEQ);
                      b.      Principal contractor


                                                                                                        Page 2 of 7
Document Set ID: 22624275
Version: 2, Version Date: 19/10/2023

Used in these records

About this file

File size
160 KB (small file)
File type
PDF

No other editions are linked here.

Original file

Log in to download the original file

Minor Change Existing Approval OPW22_0273.02.pdf · 160 KB (small file)

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.