Attachment 2 - Code Responses · 51997.2334.01
Performance outcomes Acceptable Outcomes Comments
Editor's note—Basements should have flood immunity above
the1%AEP defined flood event with alternative means to
mechanical pumping used to achieve such immunity.
Major Electricity Infrastructure & Not Applicable
SubstationsPO18 The proposed development is for an existing sensitive land use.
AO18.1
Development is sufficiently separated from major The proposed works will not be located within an easement.
electricity infrastructure and substations to minimise the Development including any sensitive land uses is at least:
likelihood of nuisance or complaint. (a) 50 metres from a transmission substation;
(b) 10 metres from any other substation; and
(c) 30 metres from a transmission line easement.
AO18.2
Habitable buildings are not located within an easement for a
distribution line.
PO19 AO19 Not Applicable
Development is located and designed to avoid or minimise Noise emissions do not exceed 5db(A) above background The proposed development is for an existing sensitive land use.
noisenuisance from the use of infrastructure. noise level internal to a habitable building measured in
accordance withAS1055.
PO20 AO20 Not Applicable
Wherever practicable habitable buildings are orientated to Where adjoining substations or major electricity The proposed development is for an existing sensitive land use.
avoid direct overlooking of major electricity infrastructure or infrastructure, habitable buildings are orientated so that the
substations. majority of outdoorliving areas and windows of habitable
rooms face away fromthe infrastructure.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Attachment 2 - Code Responses.pdfRelated documentApplication case desk ↗
About this file
- File size
- 535 KB (small file)
- File type
No other editions are linked here.