Council archive · source document
Remainders (Noosa) 2026 concept design · EXE25/0030
INSTALLATION PHASE: • The installation site is prepared by clearing an area for the large circular base plates that will prevent movement of the spheres. Other site works would include preparation to connect irrigation and power to the spheres. • The spheres will likely be transported from Sydney to Noosa via Hyab truck. Depending on site access, the same truck could lift the spheres directly into their final locations. An aperture within the spheres would receive a pin welded to their respective base plates, which could be nutted as a fixing. • Irrigation and power are then connected to the spheres, before growing medium is added to their internals. This is followed by the final stage of landscaping the sphere internals and surrounds, and commissioning the irrigation and lighting. • Risks: Understanding site access relative to the required machinery will be essential, along with appropriate traffic (including pedestrian) control measures.
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalUsed in these records
Remainders (Noosa) 2026 concept design.pdfRelated documentApplication case desk ↗
About this file
- File size
- 2.8 MB (large file)
- File type
No other editions are linked here.
Original file
Log in to download the original file
The download may take up to a minute.