Original source · versioned page text
12. Existing EA (2016)
Permit Environmental authority ERPR00439413 4. allow the contaminant to escape; or 5. fail to prevent the contaminant from escaping. Sensitive place includes the following and includes a place within the curtilage of such a place reasonably used by persons at that place: 1. adwelling, residential allotment, mobile home or caravan park, residential marina or other residential premises; or a motel, hotel or hostel; or a kindergarten, school, university or other educational institution; or a medical centre or hospital; or a & oo NS a protected area under the Nature Conservation Act 1992, the Marine Parks Act 2004 or a World Heritage Area; or a public park or garden; or for noise, a place defined as a sensitive receptor for the purposes of the Environmental Protection (Noise) Policy 2008. Tidal land means land that is submerged at any time by tidal water. Waters includes river, stream, lake, lagoon, pond, swamp, wetland, unconfined surface water, unconfined water, natural or artificial watercourse, bed and bank of any waters, dams, non-tidal or tidal waters (including the sea), stormwater channel, stormwater drain, roadside gutter, stormwater run-off, and groundwater and any part thereof. You means the holder of the environmental authority. Page 19 of 24 * GK130701 + EM797 + Version 1 Department of Environment and Heritage Protection
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.