Skip to the record
The gold standard in government transparency.

Original source · versioned page text

Stormwater management plan 20220156 9 Kauri St SWMP

of 67

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 11, section 1. The text section number identifies this passage in the reader.

 STORMWATER QUALITY
The following sections discuss the stormwater quality considerations for the construction and operational phase of
the development.


     4.1. Construction Phase

          4.1.1 Erosion and Sediment Control Measures
During construction, it is necessary to manage stormwater run-off to avoid potential contamination of downstream
waterways from sediments and other pollutants from the site. A range of best practice sediment and erosion controls
should be implemented on the development to ensure negative impacts to the downstream receiving environment
are mitigated.

As the area being developed is below 2,500m², the development’s construction will be managed using best practice
erosion and sediment control principles in line with the desired outcomes of Appendix 2 of the SPP (DERM, July
2017), which are shown below in Figure 4.1.




                     Figure 4.1 SPP 2017 Construction Phase Stormwater Management Design Objectives

A site-specific erosion and sediment control plan has been be prepared for the development making use of a range
of suitable erosion and sediment controls, including:

     1. Sediment fencing along downstream of the work areas within the site to prevent sediment from leaving the
        construction area.

     2. A shakedown area is to be installed at the construction entry/exit to the proposed development area to
                                                               minimise sediment being transported to and from
Project number 20220156                                        the site.
File RECOR Stormwater Management Report - 20220156.docx, 2022-08-08 Revision 0                                Page 11 of 26

P +61 7 5211 1003                         A 37 Mary St, Noosaville Qld 4566      E [email protected]    recorconsulting.com
Log in to download the original file

Stormwater management plan 20220156 9 Kauri St SWMP.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗

My Comparisons

Choose two to four records of the same kind. Drag using a handle or use the “Compare” buttons.

Your selected records are saved in this browser for your account. Results use the filters on the page where you choose “Compare selected”.