Original source · versioned page text
Stormwater management plan 20220156 9 Kauri St SWMP
Plans and drawings: the text below has words only, no drawings.
Original PDF page 21, section 2. The text section number identifies this passage in the reader.
SW
\ \ 10. CONTRACTOR TO ALLOW TO DEMOLISH ALL EXISTING STRUCTURES, ROADS
\ \
\
\ \
W
AND SERVICES WITHIN LIMIT OF WORKS AND REMOVE FROM SITE U.N.O.
\ \
\ \
\ \
\
\
\ \
11. WHERE NECESSARY, CONTRACTOR SHALL OBTAIN ALL NECESSARY
S
\ \
\ \
\
APPROVALS TO CARRY OUT SERVICES RELOCATION OR ALTERATIONS.
\
\
SW
\ \
\ \
\ \
\ \
W
\ \
\ \
\ \
\ \
\
\ \
\ \
S
\ \ \
\ \
\
SW
\ \
\
W
\ \
V
\ \
S
\ \
\ \
LEGEND
SW
\
\ \
\ \
EXISTING SEWER CHAMBER
V
\ \
\ \
\ \
\
\ \
\ \ \ EXISTING WATER METER
SW
\
\ \
\
EXISTING POWER POLE
ES
S
ES
S EXISTING SEWERAGE LINE
V
W EXISTING WATER MAINS
SW
ES
S
ELECTRICITY OVERHEAD LINE
ES
V V
V
SW
ES
S
ES
V
ES
S
ES
SW
V
CLIENT DETAILS: PROJECT ADDRESS: APPROVED BY: PROJECT NAME:
ES
S
PROPOSED RESIDENTIAL DEVELOPMENT
ES
SUNSHINE GROVE PTY LTD TITLE: STATUS:
SW
EXISTING SITE SERVICES MATERIAL CHANGE OF USE
V
9 KAURI STREET
ES
S
ES
© ABN 89 647 469 707
COOROY, QLD, 4563 JARO BAULEKA LAYOUT PLAN AND
RPEQ: 20693
37 MARY ST OPERATIONAL WORKS
SW
A 10/08/22 COMBINED MCU AND OP WORKS ISSUE JAC BRP JB SCALE:
NOOSAVILLE, QLD 4566 CPEng
AS INDICATED DRAWING NUMBER: PROJECT NUMBER: SHEET REV:
V
+61 7 5211 1003 REV DATE DESCRIPTION DWN CHK APP
DATE: 10/08/22
ES
S
SIZE:
C10 20220156
ES
RECORCONSULTING.COM REVISIONS
DO NOT SCALE, IF IN DOUBT ASK A1 A
SW
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.