Stormwater management plan 20220156 9 Kauri St SWMP

of 67

Page text read automatically using OCR, there may be inaccuracies

Plans and drawings: the text below has words only, no drawings.

Log in to see the plans as drawn

Original PDF page 23, section 1. The text section number identifies this passage in the reader.

                                                                                                                                                                                                                            EARTHWORKS NOTES
EW LEGEND
Lower_value Upper_value   Colour                                                                                                                                                                                            1.    FOR GENERAL NOTES REFER DWG C01, WHICH IS TO BE REQUESTED AND VIEWED PRIOR TO COMMENCEMENT OF
                                                                                                                                                                                                                                  CONSTRUCTION IF NOT SUPPLIED.
-3.0     to    -2.9   m
                                                                                                                                                                                                                            2.    IT IS RECOMMENDED THAT THE GEOTECHNICAL CONSULTANT BE CONTACTED TO CONFIRM THE SOIL CONDITIONS PRIOR TO
                                                                                                                                                                                                                                  EARTHWORKS COMMENCING.
-2.9     to    -2.8   m
                                                                                                                                                                                                                            3.    GRASS AND TOPSOIL SHALL BE STRIPPED TO A MINIMUM DEPTH OF 100MM OVER THE EXTENT OF THE WORKS UNLESS
                                                                                                                                                                                                                                  DIRECTED OTHERWISE AND STOCKPILED WHERE REQUIRED FOR FILL OF LANDSCAPING AREAS. TOPSOIL MATERIALS MUST NOT
-2.8     to    -2.7   m
                                                                                                                                                                                                                                  BE USED IN STRUCTURAL FILL.
                                                                                                                                                                                                                            4.    UNSUITABLE NATURAL MATERIALS SUCH AS SATURATED, LOOSE OR SOFT MATERIALS ENCOUNTERED SHOULD BE REMOVED
-2.7     to    -2.6   m                                                                                                                                                                                                           DURING SUBGRADE PREPARATION FOR BULK EARTHWORKS. ALL UNSUITABLE MATERIAL TO BE REMOVED FROM SITE AT
                                                                                                                                                                                                                                  CONTRACTORS EXPENSE.
-2.6    to     -2.5   m
                                                                                                                                                                                                                            5.    COMPACTION OF THE EXPOSED SAND SUBGRADE REQUIRES SUBSTANTIAL VOLUMES OF WATER COMBINED WITH VIBRATORY
-2.5    to     -2.4   m                                                                                                                                                                                                           COMPACTION EQUIPMENT(E.G VIBRATING PLATE OR MINIMUM 4 TONNE VIBRATING SMOOTH DRUM ROLLER). CARE MUST BE
                                                                                                                                                                                                                                  TAKEN TO ENSURE THERE ARE NO IMPACTS ON SURROUNDING STRUCTURES. MATERIAL TO BE COMPACTED IN ACCORDANCE
-2.4    to     -2.3   m                                                                                                                                                                                                           WITH GEOTECHNICAL REPORT AND AS1289.
                                                                                                                                                                                                                            6.    TEMPORARY SWALE DRAINS TO BE PROVIDED ALONG CREST AND TOE OF ANY CUTS AND ABOVE FILL BATTERS GRADING
-2.3    to     -2.2   m                                                                                                                                                                                                           DISCHARGE TO A CONTROL POINT FOR DISCHARGE TO EXISTING STORMWATER INFRASTRUCTURE IN ROAD RESERVE.
                                                                                                                                                                                                                            7.    A MINIMUM 150MM THICK GRANULAR WORKING PLATFORM MAY BE REQUIRED ON SOIL SUBGRADES ALONG HAUL ROADS AND
-2.2    to     -2.1   m                                                                                                                                                                                                           LAYDOWN AREAS TO IMPROVE TRAFFICABILITY. SPECIFIC PLATFORM DESIGN WOULD BE REQUIRED PRIOR TO MOBILISATION
                                                                                                                                                                                                                                  AND TRAFFICKING OF ANY HEAVY MOBILE PLANT ON THE SITE.
-2.1    to     -2.0   m                                                                                                                                                                                                     8.    IMPORTED GENERAL FILL MATERIAL SHALL BE SUPPLIED AND COMPACTED WHERE UNSUITABLE NATURAL MATERIALS ARE
                                                                                                                                                                                                                                  LOCATED AND AS OTHERWISE NECESSARY TO OBTAIN SUBGRADE/PLATFORM LEVEL. IMPORTED GENERAL FILL MATERIAL
-2.0    to     -1.9   m                                                                                                                                                                                                           SHALL BE CLEAN GRADED MATERIAL FREE OF ORGANIC MATTER AND STONES, WITH MAXIMUM PARTICLE SIZE OF 100mm AND
                                                                                                                                                                                                                                  CAPABLE OF BEING COMPACTED INTO COHERENT FILLING TO THE SPECIFIED STANDARD. THE MATERIAL SHALL HAVE A
-1.9    to     -1.8   m                                                                                                                                                                                                           MAXIMUM PLASTICITY INDEX OF 15%, A SHRINK-SWELL INDEX OF LESS THAN OR EQUAL TO 1% AND A MINIMUM C.B.R. OF 10%.
                                                                                                                                                                                                                            9.    ALL EARTHWORKS TO BE CARRIED OUT AT +/- 2% OPTIMUM MOISTURE CONTENT FOR STANDARD COMPACTION.

                                                                                                         28.00
-1.8    to     -1.7   m
                                                                                                                                                                                                                            10.   ANY PROPOSED RETAINING WALL WORKS MUST BE WHOLLY WITHIN THE PROPERTY BOUNDARY OF THE SUBJECT SITE,

                                                                                                              m
-1.7    to     -1.6   m
                                                                                                                                                                                                                                  INCLUDING REAR OF RETAINING WALL DRAINAGE INFRASTRUCTURE FOR RETAINING WALLS IN CUT. RETAINING WALLS ARE TO
                                                                                                                                                                                                                                  BE PREPARED IN ACCORDANCE WITH STRUCTURAL ENGINEERS SPECIFICATIONS, AND IN CONFORMANCE WITH CONSTRUCTION
-1.6    to     -1.5   m
                                                                                                                                                                                                                                  REQUIREMENTS OF GEOTECHNICAL REPORT.
                                                                                                                                                                                                                            11.   REFER ARCHITECT/LANDSCAPE ARCHITECT DRAWINGS FOR CONFIRMATION OF RETAINING WALL COLOUR AND FINISH.

                                                                                                                                                                27.99
-1.5    to     -1.4   m                                                                                                                                                                                                     12.   ALL EARTHWORKS OPERATIONS SHALL BE CARRIED OUT WITH 'LEVEL 1' SOIL ENGINEERING SUPERVISION IN ACCORDANCE
                                                                                                                                                                                                                                  WITH APPENDIX B OF AS 3798. THE NOMINATED GEOTECHNICAL TESTING AUTHORITY SHALL PROVIDE CERTIFICATION THAT ALL
-1.4    to     -1.3   m
                                                                                                                                                                     m                                                            GENERAL EARTHWORKS OPERATIONS HAVE BEEN CARRIED OUT IN ACCORDANCE WITH THE DRAWINGS AND SPECIFICATIONS
                                                                                                                                                                                                                                  AND THE CONTROLLED FILL IS SUITABLE FOR PURPOSE TO THE REQUIRED BEARING CAPACITY UNDER THE
-1.3    to     -1.2   m                                                                                                                                                                                                           PLATFORM/STRUCTURES AS SPECIFIED BY THE GEOTECHNICAL REPORT.
                                                                                                                                                                                                                            13.   ALL EARTHWORKS FILL AND EXCAVATED AREAS SHALL BE COMPACTED TO 98% STANDARD MAXIMUM DRY DENSITY OR A DRY
                                                                       0


                                                                                                                                                                                                     27.99                        DENSITY INDEX OF AT LEAST 75% IN ACCORDANCE WITH THE GEOTECHNICAL REPORT IN LAYERS OF 250MM LOOSE THICKNESS
-1.2    to     -1.1   m
                                                                        .


                                                                                                                                                                                                          m
                                                                          0


                                                                                                                                                                                                                                  (PRIOR TO COMPACTION).
-1.1    to     -1.0   m
                                                                            0



                                                                                                                                                                                                                            14.   COMPACTION TESTING TO BE CARRIED OUT AT A MINIMUM OF TWO TESTS PER VERTICAL LIFT WHERE STRUCTURAL FILL
                                                                                                                                                                                                                                  HEIGHTS EXCEED 300MM IN ACCORDANCE WITH AS3798. CONTRACTOR TO UNDERTAKE ALL EARTHWORKS TESTING IN
                                                                              m




-1.0    to     -0.9   m                                                                                                                                                                                                           ACCORDANCE WITH GEOTECHNICAL ENGINEER AND LOCAL AUTHORITY REQUIREMENTS.
                                                                                                                                                                                                                            15.   FINISHED SURFACES TO ALL DISTURBED AREAS ARE TO BE TREATED IN ACCORDANCE WITH LANDSCAPE DRAWINGS.
-0.9    to     -0.8   m
                                                                                                                                                                                                                            16.   ALL NEW WORKS TO MATCH NEATLY INTO EXISTING LEVELS.
-0.8    to     -0.7   m                                                                                                                                                                                                     17.   ALL WORKS TO BE CONSTRUCTED IN ACCORDANCE WITH APPROVED MANAGEMENT PLANS.
                                                                                                                                                                                                                            18.   CONTRACTOR TO ENSURE SUITABLE EROSION CONTROL MEASURES ARE INSTALLED INCLUDING BUT NOT LIMITED TO SHAKE
-0.7    to     -0.6   m                                                                                                                                                                                                           DOWNS, SILT FENCE ETC IN ACCORDANCE WITH EROSION AND SEDIMENT CONTROL PLAN.
                                                                                                                                                                                                                            19.   ADEQUATE SAFETY FENCING/BARRIERS TO BE APPLIED TO ALL BATTERS OR RETAINING WALLS (TEMPORARY OR PERMANENT)
-0.6    to     -0.5   m                                                                                                                                                                                                           AS PER RELEVANT AUSTRALIAN STANDARDS AND LEGISLATION.
                                                                                                                                                                                                                            20.   DUST CONTROL MEASURES ARE TO INCLUDE SPRAYING WATER ON UNPAVED ROADS, ACCESS TRACKS AND STOCKPILES AT A
-0.5    to     -0.4   m                                                                                                                                                                                                           SUFFICIENT LEVEL TO SUPPRESS DUST GENERATION. ADDITIONALLY CONTRACTORS ARE TO COVER OR ENCLOSE STOCKPILES
                                                                                                                                                                                                                                  WHERE REASONABLY PRACTICAL TO RESTRICT DUST MOVEMENT.
-0.4    to     -0.3   m
                                                                                             0.00m                                                                                                                          21.   PRIOR TO THE CONTRACTOR COMMENCING ANY WORKS DETAILED ON THIS DRAWING, THE CONTRACTOR IS TO NOTIFY RECOR




                                                                                                                                                                                                             76
                                                                                                                                                                                                                                  AND RECEIVE WRITTEN CONFIRMATION THAT WORKS CAN COMMENCE.
-0.3    to     -0.2   m
                                                                                                                                                                                                                            22.   ALL EXCAVATIONS ARE TO BE CONDUCTED IN ACCORDANCE WITH THE REQUIREMENTS OF THE GEOTECHNICAL ENGINEER.




                                                                                                                                                                                                                .
                                                                                                                                                                                                                                  TEMPORARY UNSURCHARGED CUTS IN LOOSE TO VERY LOOSE SAND TO BE FORMED AT 1V:2H, AND IN MEDIUM DENSE SAND AT




                                                                                                                                                                                                                 3
-0.2    to     -0.1   m
                                                                                                                                                                                                                                  1V:1H FOR BATTERS UP TO 3M IN HEIGHT. DEEPER CUTS ARE TO BE ASSESSED BY THE GEOTECHNICAL ENGINEER. PERMANENT




                                                                                                                                                                                                                   4
-0.1    to     0.0    m
                                                                                                                                                      0.00m                                                                       CUT AND FILL BATTERS TO BE A MAXIMUM 1V:2.5H.




                                                                                                                                                                                                                     m
                                                                                                                                                                                                                            23.   EARTHWORKS FILL BATTERS TO BE MAXIMUM OF 1M IN HEIGHT, OR OTHERWISE RETAINED.
0.0     to     0.1    m                                                                                                                                                                                                     24.   WHERE THE ABOVE TEMPORARY BATTER SLOPES CAN NOT BE ACHIEVED, TEMPORARY SHORING WILL BE REQUIRED UNDER
                                                                                                                                                                                                                                  THE ADVICE OF A SPECIALIST SHORING CONTRACTOR.
0.1     to     0.2    m                                                                                                                                                                                                     25.   EXCAVATIONS IN PROXIMITY TO EXISTING STRUCTURES WILL REQUIRE SPECIFIC DESIGN TO PREVENT UNDERMINING WHICH

                                                                                                                                                                                          0.00m
                                                                                                                                                                                                                                  SHOULD BE CARRIED OUT BY A SUITABLY QUALIFIED AND EXPERIENCED RPEQ STRUCTURAL ENGINEER.
0.2     to     0.3    m
                                                                                                                                                                                                                            26.   CONTRACTOR'S RPEQ GEOTECHNICAL ENGINEER IS TO CONFIRM THAT ANY CONSTRUCTED CUT/FILL BATTERS AND RETAINING
                                                                                                                                                                                                                                  STRUCTURES ON THE SITE HAVE ACHIEVED ADEQUATE STABILITY WITH A LONG-TERM FACTOR OF SAFETY AGAINST
0.3     to     0.4    m
                                                                                                                                                                                                                                  GEOTECHNICAL FAILURES TO THEIR SATISFACTION.
                                                                                                                                                                                                                            27.   EARTHWORKS LEVELS SHOWN ARE NOMINALLY 200MM BELOW FINISHED SURFACE LEVELS INCLUSIVE OF TOPSOIL LAYER.
0.4     to     0.5    m
                                                                                                                                                                                                                                  CONTRACTOR TO CONFIRM FINISHED SURFACE LEVLS BASED ON STRUCTURAL ENGINEERING DRAWINGS FOR BUILDING SLAB
                                                                                                                                                                                                                                  THICKNESSES AND HYDRAULIC DRAWINGS FOR SUB-FLOOR DRAINAGE TO CONFIRM EARTHWORKS SURFACE LEVEL.
0.5     to     0.6    m
                                                                                                                                                                                                                            28.   ANY PRELOADING REQUIRED IS TO OCCUR IN ACCORDANCE WITH THE GEOTECHNICAL ENGINEERS REQUIREMENTS.
0.6     to     0.7    m                                                                                                                                                                                                           CONTRACTOR TO ALLOW FOR THE IMPORT AND REMOVAL OF ALL NECESSARY MATERIAL TO UNDERTAKE THE PRELOADING
                                                                                                                                                                                                                                  OPERATIONS.
0.7     to     0.8    m                                                                                                                                                                                                     29.   REFER ARCHITECTURAL DRAWINGS FOR BUILDING SETOUT.

0.8     to     0.9    m

0.9     to     1.0    m

1.0     to     1.1    m

1.1     to     1.2    m

1.2     to     1.3    m
                                        Total cut                 -1250.209
1.3     to     1.4    m                 Total fill                 275.75
                                        Total balance                -974.46
1.4     to     1.5    m                 ie excess of cut over fill     974.46




                                                                                                              CLIENT DETAILS:                                       PROJECT ADDRESS:                         APPROVED BY:                       PROJECT NAME:

                                                                                                                                                                                                                                                PROPOSED RESIDENTIAL DEVELOPMENT
                                                                                                                        SUNSHINE GROVE PTY LTD                                                                                                  TITLE:                                          STATUS:

                                                                                                                                                                                  9 KAURI STREET                                                BULK EARTHWORKS                                MATERIAL CHANGE OF USE
        © ABN 89 647 469 707
                                                                                                                                                                                 COOROY, QLD, 4563                    JARO BAULEKA              LAYOUT PLAN                                    AND
                                                                                                                                                                                                                       RPEQ: 20693
           37 MARY ST
       NOOSAVILLE, QLD 4566
                                    A       10/08/22    COMBINED MCU AND OP WORKS ISSUE     JAC   BRP   JB    SCALE:
                                                                                                                                                                                                                         CPEng
                                                                                                                                                                                                                                                                                               OPERATIONAL WORKS
          +61 7 5211 1003          REV       DATE                     DESCRIPTION           DWN   CHK   APP
                                                                                                                                  AS INDICATED                                                                        DATE: 10/08/22
                                                                                                                                                                                                                                                DRAWING NUMBER:                                 PROJECT NUMBER:                      SHEET REV:
                                                                                                                                                                                                                                                                                                                                      SIZE:
       RECORCONSULTING.COM                                                      REVISIONS
                                                                                                                                DO NOT SCALE, IF IN DOUBT ASK
                                                                                                                                                                                                                                                C30                                             20220156                              A1 A
Log in to download the original file

Stormwater management plan 20220156 9 Kauri St SWMP.pdf · 6.6 MB (large file)

The download may take up to a minute.

The supporting record

Open full page ↗

Source document

Analyse documents ↗Open full page ↗