Original source · versioned page text
Stormwater management plan 20220156 9 Kauri St SWMP
Plans and drawings: the text below has words only, no drawings.
Original PDF page 4, section 1. The text section number identifies this passage in the reader.
INTRODUCTION RECOR has been engaged to prepare a Stormwater Management Report to accompany a development application for a residential unit development located at 9 Kauri Street, Cooroy. The development will consist of 10 small residential units, sealed access & driveway, and associated landscaping works. This report investigates the stormwater management considerations for the existing and proposed development site and assesses how the run-off from the site is to be managed in accordance with Noosa Shire Council requirements for stormwater drainage. This document has been prepared with consideration for the following specifications, guidelines and reports: • Noosa Plan 2020 • Water Sensitive Urban Design Technical Guidelines for Southeast Queensland • State Planning Policy 2017 • Queensland Urban Drainage Manual (QUDM) • International Erosion Control Association (IECA) Best Practice Erosion and Sediment Control document Project number 20220156 File RECOR Stormwater Management Report - 20220156.docx, 2022-08-08 Revision 0 Page 4 of 26 P +61 7 5211 1003 A 37 Mary St, Noosaville Qld 4566 E [email protected] recorconsulting.com
See the original
The page text is free to read. Viewing or downloading an original file needs an account.
Log in to see the originalLog in to download the original file
The download may take up to a minute.